We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: loantech8/3/2006 10:08:45 PM
  Read Replies (1) of 78410
 
<15,000 metres of trenching;
50,000 metres of drilling;
a district-wide program of reconnaissance mapping and sampling to refine drill target selection; and
metallurgical studies to determine the feasibility of introducing heap-leach processing and/or cyanidization of whole ore in a mill complex.

Drilling contractor BDW International Drilling has mobilized three large core rigs to the project. This brings the number of drill rigs currently in operation to seven. Genco has purchased three additional small core rigs capable of both underground and surface drilling. These additional rigs will be deployed in August>

<In the Mina de Agua area, drilling continues with a Long Year 38 core rig on the Santa Ana vein. Trenching has begun on extensions of the Santa Ana vein, the Cascaras vein and in the Veta Rica area. As trench results become available, drilling will commence as warranted>

Maybe the drill showed them something so now the trenching work?Extensions of the vein?