SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: E. Charters8/17/2006 1:50:07 AM
   of 78410
 
hmmmmmmmmm......


Sample from to width type grams ozs.

BST0601 55 60 5 Trench 19.50 0.57
BST0601 20 Grab 57.00 1.66
BST0601 23 Grab 64.20 1.87
BST0601 28 Grab 7.36 0.22
BST0601 29 Grab 5.79 0.17
BST0601 30 Grab 39.60 1.16
BST0601 30 Grab 42.60 1.24
BST0601 45 Grab 12.90 0.38
BST0603 15 20 5 Trench 6.15 0.18
BST0603 20 25 5 Trench 14.10 0.41
BST0603 25 30 5 Trench 10.75 0.31
BST0603 30 35 5 Trench 60.20 1.76
BST0603 35 40 5 Trench 55.90 1.63
BST0603 40 45 5 Trench 129.00 3.76
BST0603 45 50 5 Trench 176.50 5.15
BST0603 50 55 5 Trench 42.40 1.24
BST0603 65 70 5 Trench 101.50 2.96
BST0603 70 75 5 Trench 255.00 7.44
BST0603 75 80 5 Trench 239.00 6.97
BST0603 80 85 5 Trench 149.50 4.36
BST0603 85 90 5 Trench 6.94 0.20
BST0603 19 Grab 50.70 1.48
BST0603 39 Grab 17.00 0.50
BST0605 10 15 5 Trench 55.30 1.61
BST0605 30 35 5 Trench 17.70 0.52
BST0605 30 Grab 49.40 1.44

Additional delineation of the structure was conducted by a series of cross trenches spaced roughly 150 to 200 feet apart
(BST0606, BST0607, BST0609 and BST0610). The cross trenches traced the strike length of the shear an additional 1,000 feet to the northwest, with the final cross trench (BST0610) encountering the shear zone along strike and within 300 feet of the Banker’s Stope, the highest grade and most productive ore shoot within the Cleary Hill mine.

Significant Trench and Grab Sample Assays – Cleary Hill East

Extension Cross Trenches

From To Width SampleType gms ozs.

BST0606 10 15 5 Trench 1.64 0.05
BST0606 50 55 5 Trench 9.32 0.27
BST0606 54 Grab 33.90 0.99
BST0607 20 25 5 Trench 1.17 0.03
BST0607 30 35 5 Trench 1.83 0.05
BST0607 45 50 5 Trench 2.50 0.07
BST0607 7 Grab 12.30 0.36
BST0607 7 Grab 312.00 9.10
BST0607 32 Grab 5.30 0.16
BST0607 33.5 Grab 14.90 0.44
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext