We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : ABB (Asea Brown Boveri) ADR

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Skywatcher who wrote (13)8/23/2007 1:24:50 PM
From: Skywatcher  Read Replies (1) of 106
 
ABB wins $62-million control order for high-efficiency power plant in Germany

Coal-fired plant will be among the world's most energy-efficient
Zurich, Switzerland, June 26, 2007 – ABB, the leading power and automation technology group, has won an order worth $62 million from the German utility, E.ON-Kraftwerke GmbH, to supply the complete process control system for a new high-efficiency power plant.

ABB will equip E.ON’s 1,100-megawatt (MW) hard-coal-fired power plant, Datteln Unit4, with a state-of-the-art power plant control system. The new plant located in Germany’s Rhein-Ruhr region will have a thermal efficiency of more than 45 percent, making it one of the world’s most energy efficient coal-fired plants.

"This order demonstrates the trust E.ON places in ABB's power plant control technology and expertise," said Peter Leupp, head of ABB's Power Systems division. "Our integrated systems combine the latest ABB platform with our extensive knowledge of power plant processes, resulting in very reliable operation, as well as reduced maintenance and operational costs."

ABB's scope of supply comprises a System 800xA control installation, with boiler protection, and all instrumentation. This includes electrical actuators, which will be integrated into the process control system via a Profibus network. ABB will also carry out the complete engineering, installation and commissioning. The order includes the option to deliver process control equipment for three similar power plants in the future.