We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: LoneClone who wrote (10999)11/29/2007 10:36:49 AM
From: LoneClone  Read Replies (1) of 194042
 
Albidon updates Enterprise deposit resource at Munali nickel project

resourceinvestor.com

• The Enterprise resource has been re-estimated with the inclusion of infill drilling of the early stoping levels and additional deep drilling.

• The Indicated and Inferred Resource for the Enterprise Deposit is now 9.12Mt @ 1.23% Ni and 0.9g/t of platinum group metals ('PGM') at a revised cutoff grade of 0.6% Nickel.

• Enterprise contains 112,000 tonnes of Ni and 243,000 ounces of PGM.

• The Indicated portion of the resource has increased to 7.5Mt @ 1.28% Ni and 0.9g/t of PGM.

• The updated resource includes an additional 33 drill holes (15%) or 10,400 metres of additional drilling.
Updated mineral resource estimate for Enterprise nickel deposit

The Munali Nickel Project (100% Albidon) is located approximately 60 kilometres south of Zambia's capital city Lusaka. The Munali Project area comprises the Enterprise Deposit and a number of other nickel prospects around the Munali intrusion, the most advanced of which is the Voyager prospect along strike from Enterprise.

A revised JORC-compliant resource estimate has been prepared by Resource Evaluations Pty Ltd for the Enterprise Deposit including additional drilling completed during the period from April 2006 to July 2007.

Based on revised mining costs and an updated long term Nickel price the cutoff grade for the resource has been reduced from 0.7% Ni to 0.6% Ni to better reflect the size of the zones that can be economically extracted.

Table 1: Enterprise Deposit September 2007 Resource Estimate > 0.6% Ni

Class Tonnes Grade Metal

Ni % Pd g/t Pt g/t PGM g/t Ni T PGM Oz

Indicated 7,540,000 1.3 0.6 0.3 0.9 96,600 209,500

Inferred 1,580,000 1.0 0.5 0.2 0.7 15,400 33,500

Total 9,120,000 1.23 0.6 0.3 0.9 112,000 243,000

The shallow drilling resulted in a substantial increase in confidence in the early stoping levels of the Indicated Resource. A number of additional structures in the upper zones of the resource were also identified with this data now being used for detailed mine planning and incorporated into the revised probable reserve. In addition to the location of the main ore zone, overall the grade in the shallow portion of the resource is slightly higher than previous models have estimated at a comparative cut off grade.

The updated resource includes an additional 33 drill holes or 10,400 metres of additional drilling.

The resource is based on the breccia and massive sulphide zones at the south eastern corner of the Munali Intrusion. The modelled resource extends for over 1 km along strike towards Voyager, and 600m down dip within a continuous structural zone. The Enterprise Deposit has not been fully closed off along strike to the north and down dip.

This resource estimate excludes the Voyager prospect which is currently being estimated and will be reported in the near future.