Premier, Roxmark drill into Tombill-Bankfield break -
  2008-01-24 16:11 ET - News Release
  See News Release (C-PG) Premier Gold Mines Ltd -
  Mr. Stephen McGibbon of Premier reports -
  PREMIER-ROXMARK INTERSECT PRIMARY TARGET IN GERALDTON -
  Premier Gold Mines Ltd. -   has intersected the primary target horizon, the main Tombill-Bankfield break, during drilling at -   the Magnet gold mine -   property in the Geraldton camp, a resource property owned by    Roxmark Mines Ltd. -  and subject to an earn-in option by Premier. 
    Two distinct zones were intersected, confirming the presence    of significant veining and mineralization in the target    horizon (including visible gold).
  Historically, in 1988, from the 11th-level station of -   the Magnet gold mine,   a flat hole intersected the Tombill-Bankfield fault horizon,    host to the largest mine in the district, approximately 500   metres south of the main shaft. 
   This hole intersected 45.26 grams per tonne Au -   (1.32 ounces per ton) over 1.34 metres in the host horizon   and was not followed up.   This host horizon was intersected at a depth of approximately   500 metres and is now the focus of current drilling with   two drills.   In addition to the target horizon, an additional   mineralized zone was intersected farther up-hole. 
   The current drilling is part of a major $2.5-million   exploration program.
   In addition to the main target, recent drilling performed   in the Benedict zone, a secondary target located proximal   to the Magnet mine,   intersected gold mineralization including 10.22 g/t Au   (0.30 ounce per ton) over 2.5 metres   and 8.14 g/t Au (0.23 ounce per ton) over two metres. 
   The Geraldton project is being operated by Premier under   an option agreement with Roxmark.
   The Geraldton project is located in the heart of -   the Beardmore-Geraldton greenstone belt, a highly   prospective high-grade gold district that has seen   relatively little exploration over the past several decades.
   The project area covers approximately 10 kilometres   of some of the most strategic ground in the region,   and is host to past-producing mines and numerous   exploration targets in a district that has more   than 4.1 million ounces of historic gold production.
   Premier currently has six drills working on three of   the company's core projects.   In addition to Geraldton, a major exploration program   has resumed on the Rahill-Bonanza joint-venture project   in Red Lake, operated under a 49-51 joint venture with   Red Lake Gold Mines, an affiliate of Goldcorp Inc.,   and drilling is under way on   the Santa Teresa property -   in Mexico, a joint-venture project with   Sutter Gold Mining Inc.
   Stephen McGibbon, PGeo, executive vice-president of Premier,   is the qualified person for the information contained in   this press release and is a qualified person within   the meaning of National Instrument 43-101.  -- siliconinvestor.com
  siliconinvestor.com 
  siliconinvestor.com God Bless
       |