We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : The Molybdenum Discussion Board

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: hubris33 who wrote (3148)3/7/2008 4:19:04 PM
From: Belgie24  Read Replies (2) of 3267
 
<<Have any idea how soon until the underground crews will be able to consistently produce 100 tpd?>>

It's all about the stopes. That 2nd one should be done, but no confirmation I've seen. If we get the 3rd and 4th stopes, then we'll probably get 200 TPD out consistently, with the higher grade (over 2%) that we need to get to max production. I see this as a very successful start-up, which is the way director Dr. Corby Anderson characterized it on the mine/mill tour in September. He did NOT come off as a BS type of guy to me.

<<the mill has historically processed 4.75% Mo material>>

I think you meant to say "up to" 4.75% Mo material. The optimum level seems lower to me, perhaps between 2% and 3%. We now have an expert running the operation in Kent Aveson; I have little doubt he'll optimize the operation.

Thank you for your input also, together we can come to reasonable expectations for the future.