SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : USSE - U.S. Sustainable Energy Corp.

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: mailman00963/17/2008 11:34:09 AM
   of 613
 
Baytown Updates By GeoBiofuels

Onsite from Ron

Live from Baytown this is the "GeoMoney Show"!
Okay, so much to tell, so little time!

This is my honest opinion on what I have seen so far. Went for a long ride on a kubota 4 wheel truck through out the property with John yesterday, seen land getting cleared and filled, hundreds of acres to build on. Some of the land has small swamps they are filling with truck after truck. (I have pictures).
The land has rail and pipelines from 4 major companies that run through, there is also very large power lines and a transfer station on the property.

The building is much larger in person, as well as the finished reactors, the pictures give them no justice. This is the first time I am able to touch and examine the reactors up close. The size of the reactors up close is enormous, they tower over any full size man, they are very, very large. They have 95% of the second reactor completed. They are getting ready to move two more reactor in line with the other two to complete the unit (4 reactors). Skids with the new bands have just arrived to finish the other two reactors. They have designed a new feed system that will feed all four reactors at once, very impressive.

In regards to refining and distilling the biocrude (Vertroleum) they have plans that have just been designed to produce certain products right on site. I have seen a engineer from a refining contractor on site, he has been hired to finalize this part of the project. I am not sure what company, so don't ask. They are very impressive from what I have seen. They have moved one large storage tank to the rear pad for connecting, they are getting ready to move many more and start construction of the new design for refining and storage. There is also another contractor on site, that is in charge of maintaining vapors and working with the TCEQ, these contarctors are all working in tune together.

I will be going back to the plant today to take specific pictures not yet on biocrude.us, I want to show the size of these "parts" like I said, everything in the pictures looks smaller than in person. For example, the condensor that angles in the rear of the building, in the pictures it looks maybe 5' to 6' feet long, way off, this condensor is about 15' long and atleast 2' wide its huge. The piping coming from the rear of the building is also much larger that looks. I will use a soda can today in the pictures to show size.

I will post again some time tonight!

Post # 750, SSTP KaboomStocks, use this link to acces his other posts:
kaboomstocks.com

Post # 751:
One more note before I head back to the plant, JR has said he will have an investors day again when all four reactor are completed and producing as one unit. I would say a 40 to 60 days and the unit should be complete. I will also show pictures of the massive wiring belts they run from reactor to control boxes. There is also a massive 10' by 8' safe near the reactors that houses the catalysts, you could hit this safe with a Mack truck and would only dent it.

Post # 757:
I am very tired, but will post a few lines.

I have taken over 280 pictures! Property, building, reactors, parts, products, Vertroleum, Biogasoline, and Bio-diesel.

I also filled the 4 wheel motorcycle with Biogasoline and rode for over 1 hour. I was 100% impressed with the fuels results. I first drained the tank, then filled with pure Biogasoline (refined from the Vertroleum) filled the tank half way and started her up! (The engine is a four stroke, that runs normaly on straight gasoline) The quad had very good torque and pulling power. One thing I noticed is the smell, anyone at the Natchez facility that smelled the Biocrude knows what I am posting of, it smells "strong". When I ran the quad I smelled the same smell??? I thought is was the Biocrude on my fingers, but when I stopped I smelled the exhaust, Bingo! The exhaust smells like the biocrude, how funny! I recommended they show all investors what I did today, no doubt you can prove its running on straight Biogasoline!
The Smell!

Post # 761:
Leaving Tonight!
I will post the new pictures Tuesday, my flight comes in very late.

More of my opinion, the company seems to be making very large steps, all in the right direction. Some have said to slow, but after viewing the operation and getting a "on-site" taste of whats happening, I would saw "Rome wasn't built in a day". I am not being a wise-ass, but some don't realize the time and planning it takes to accomplish what he is doing.

I wish I waited about one more month before heading down, because this "refining contractor" has finished the blueprints and will start construction on the new feed system, and new refining system. It will be very impressive.

I still cannot get over how good the 4 wheeler engine ran on Biogasoline, I was having fun flying around the property. I did bust my ass trying to climb a large pile of sand, no big deal, was just feeling like a kid again. I have put in my 2 cents on what is needed at another investors show, what I would like to see is:
1. A Chevy V-8, and a Toyota 4cyl. on an engine stands running on Biogasoline, with an emission set-up on the tail pipe.
2. A Catipillar Diesel on an engine stand running on Bio-Diesel, with an emission set-up on the tail pipe.
3. Small samples of refined products for investors to take home.
4. Samples of the fertilizer to take home.
5. Reactor running and producing for the investors can listen and watch the magic!
He has done this for business owners looking to do business, he can do it for us!

The plans for the property are huge, out where they are clearing land, this will be for a large building, this building will be as large as the Natchez building if not larger. I have spoken with the original owner of Consort Concrete, he is very much on-board with all of JR's plans.

Off the the plant one last time.

Post # 763:
It is unique, no doubt it is definitely unique! I spoke with Neil Boone about the smell, he said they can fix that, not a problem.

This is a start, he has over 280 pictures, yet to be posted. No doubt, he will have more commentary. Stay tuned. Remember, Ron from Geobiofuels now posts from KaboomStocks.

.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext