We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Formerly About Advanced Micro Devices

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Yousef who wrote (25067)10/22/1997 12:53:00 PM
From: Petz  Read Replies (1) of 1576717
 
Yousef, re:bringing up 0.25 process at AMD. You said
As posted on the other AMD thread, Fab25 has 86,700 sqft of cleanroom space. In that space, one should be able to get at least 30 (8") steppers and "other supporting" Fab equipment. The majority of these steppers will be I-line machines capable of either.35um or .25um production. Probably about 5 of these will be DUV steppers/scanners that are needed for the "critical layers" in a .25um process. Thus for
both .35um and .25um, there will be redundant equipment to help keep
cycletime (outdate-indate of wafers) down and capacity up. I expect that AMD will be able to build all the CPU's you mentioned in this Fab.


But then you said,
They have to bring up the .25um process on equipment running .35um production.

If there are "30 steppers and supporting equipment" why do any of them have to be used for both the 0.35 and 0.25 um process? In fact, since AMD is continuously buying new equipment for this fab, I suspect that most of the 0.25 um equipment was never used for 0.35 production. Please explain.

Petz