We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : 2026 TeoTwawKi ... 2032 Darkest Interregnum
GLD 414.48+0.7%Jan 9 4:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: elmatador6/19/2009 5:39:15 PM
  Read Replies (2) of 219223
 
You excavate a trench with a backhoe and direct lay a fiber cable on a bed of sand. Trench: 1m deep. 30cm wide.

De-mining certificate states that the baseline is the side of the road, stating it was de-mined 15m each side of the road.

That agrees with the final report of 2.250.459m2 for a Cusse-Caluquembe stretch is 73Km: 30mx73.000=2.190.000m2

Our baseline is not the side, of the road but the axis of the road (the dividing line). That should have left a guard margin of 5m of de-mined route.

How comes we hit a mine within the de-mined area?
1) De-mining sought only metal-casing mines but left plastic-casing mines.
2) De-miners are not doing a proper job.

In any case renders the de-mining certificate not trust-worthy.

I need to think.