WOW WAIT TILL WYG DOES THE DEEP HOLES!!!
International Wayside Gold Mines Ltd (3) Symbol WYG Shares Issued 36,329,037 Close 2009-10-23 C$ 1.37 Recent Sedar Documents
Int'l Wayside drills 70.9 m of 10.7 g/t Au at Bonanza
2009-10-26 06:16 ET - News Release
Mr. Andrew Rees reports
DRILL HOLE 14B INTERCEPTS 70.9 METERS (232.6 FEET) OF 10.7 G/T (0.311 OZ/T) GOLD, INCLUDING 38.7 METERS (126.9 FEET) OF 19.0 G/T (0.555 OZ/T) GOLD
International Wayside Gold Mines Ltd. has completed an 18-hole infill diamond drill program in the Bonanza Ledge zone at Barkerville Mountain, designed by Mintec Inc. Assay results for drill holes BC09-10, BC09-13, BC09-14, BC09-14B (partial: 92.2 of 203 metres have been assayed to date), BC09-15, BC09-16 and BC09-17 were recently received.
Highlights of the drill results include:
Hole BC09-14B: 70.9 metres (232.6 feet) of 10.7 grams per tonne (g/t) (0.311 ounce per ton) gold
including: 38.7 metres (126.9 feet) of 19 g/t (0.555 ounce per ton) gold
92.2 metres (302.6 feet) -- 203 metres (666 feet); assay results pending
Drilling of BC09-14B was recently completed to a depth of 203 metres (666 feet) and the core samples from pending assays were split and sent to Eco Tech Laboratory Ltd. for analysis on Oct. 24, 2009, and will be released when received. BC09-14B was drilled 50.5 metres (165.6 feet) southeast of BC09-12, which returned assays of 84.4 metres (277 feet) of 16.5 g/t (0.481 ounce per ton) gold (see news in Stockwatch Oct. 7, 2009). Assay results have been received to 92.2 metres (302.6 feet). BC09-14B marks the beginning of a new phase of drilling targeting Bonanza Ledge mineralization at depth and below the existing National Instrument 43-101 proven reserves, as reported in the company's prefeasibility study Sept. 10, 2009, and filed on SEDAR Oct. 23, 2009.
Drill hole BC09-14 was stopped at 87 feet in a fault zone which required its redrilling as BC09-14B. Drill hole BC09-14B was cased to 21.3 metres (70 feet) and samples were not taken within the cased portion of the hole.
J. Frank Callaghan, president and chief executive officer, stated: "We are excited to start a new phase of drilling targeting Bonanza Ledge-style mineralization at depth, below the proposed Bonanza Ledge open-pit gold mine and along strike of the Bonanza Ledge trend. This next phase of Bonanza Ledge drilling will begin as the company's consultants and geologists interpret the data gathered from the infill drill program. The company is currently drilling the Butts zone, two kilometres northwest of the Bonanza Ledge in the Cariboo gold quartz and Island Mountain mine trends."
SUMMARY OF ASSAYS OF DDH BC09-10, 13 THROUGH 17
No. drill hole From To Width Gold (feet) (feet) (g/t) (oz/t)
62.4 87.0 24.6 3.58 0.104 1 BC09-10 including 64.5 67.9 3.4 25.3 0.738 2 BC09-13 127.0 235.4 108.4 0.45 0.013 3 BC09-14 37.0 47.0 10.0 0.11 0.003 84.0 87.0 3.0 0.12 0.003 4 BC09-14B 70.0 302.6 232.6 10.7 0.311 including 91.6 96.0 4.4 1.38 0.040 96.0 99.1 3.1 2.51 0.073 99.1 102.0 2.9 29.2 0.852 102.0 106.0 4.0 1.07 0.031 106.0 116.0 10.0 1.71 0.050 116.0 117.7 1.7 10.1 0.295 117.7 120.5 2.8 115 3.354 120.5 126.0 5.5 89.7 2.616 126.0 130.3 4.3 7.45 0.217 134.9 141.1 6.2 6.25 0.182 146.0 152.0 6.0 6.35 0.185 152.0 156.0 4.0 22 0.642 156.0 158.0 2.0 12.2 0.356 158.0 162.1 4.1 2.14 0.062 162.1 166.0 3.9 15.4 0.449 166.0 168.5 2.5 35.5 1.035 168.5 171.0 2.5 2.18 0.064 171.0 176.0 5.0 25.1 0.732 176.0 179.4 3.4 83.5 2.435 179.4 182.3 2.9 17.5 0.510 182.3 186.0 3.7 10.4 0.303 186.0 188.8 2.8 2.52 0.073 188.8 192.2 3.4 9.45 0.276 192.2 196.0 3.8 38.50 1.123 196.0 198.3 2.3 15.9 0.464 198.3 206.6 8.3 7.25 0.211 206.6 213.3 6.7 14.6 0.424 213.3 216.0 2.7 2.85 0.083 216.0 219.3 3.3 4.80 0.140 219.3 221.2 1.9 69.5 2.027 221.2 226.0 4.8 11.1 0.324 226.0 231.0 5.0 2.41 0.070 231.0 236.0 5.0 1.07 0.031 241.8 246.0 4.2 2.15 0.063 261.1 265.4 4.3 1.75 0.051 273.5 276.0 2.5 1.32 0.038 Pending Pending Pending Pending Pending Pending Pending Pending Pending Pending 248.2 257.0 8.8 1.36 0.040 5 BC09-15 277.0 287.0 10.0 0.15 0.004 96.0 186.0 90.0 2.64 0.077 including 136.0 141.0 5.0 1.44 0.042 159.7 166.0 6.3 11.7 0.341 166.0 170.6 4.6 16.9 0.493 170.6 176.0 5.4 2.68 0.078 176.0 181.4 5.4 2.27 0.066 6 BC09-16 181.4 186.0 4.6 6.25 0.182 223.8 239.4 15.6 1.58 0.046 including 223.8 228.4 4.6 2.24 0.065 228.4 239.4 11.0 2.22 0.065 389.1 425.2 36.1 0.20 0.006 496.0 500.0 4.0 0.10 0.003 559.8 566.0 6.2 0.10 0.003 7 BC09-17 137.0 167.0 30.0 0.20 0.006 173.8 178.5 4.7 0.10 0.003
The technical information in this news release has been reviewed and approved by chief geologist Jim Yin, PhD, PGeo, a qualified person as defined in National Instrument 43-101. The gold values presented have been derived from assay data received from Eco Tech Laboratory Ltd. in Kamloops, B.C., using fire assay with an AA (atomic absorption) finish.
Top Print this Page Mobile | Old Site | Home | Products | Help | Contact Us | Your Account | System Status © 2009 Canjex Publishing Ltd. All rights reserved. Terms of Use, Privacy Policy v2 |