From JBII CEO,
Hello XXXX,
It's important to understand that we are not reinventing the wheel. The big processor works. Period. By adding the catalyst to the system we have changed the dynamics of the processor significantly. Without a proper effective catalyst any plastic 2 oil system is inefficient, useless, and garbage. They have appeared over and over for the past 20 years looking for capital, then disappear. This is a viable process that is already a done deal. The fuel derived from the catalyst is already ASTM certified so we are not going through a "does it work?" test. We are going through a "I want this to run everywhere" testing and documentation.
Our large processor is in third party validation and testing. so I am referring of all the possible documentation, analytics and safety information required to run these processors in volume in multiple states and countries with the least permit delays possible. The more data the better.
We retained a state-certified chemical analysis company that is providing engineering analytics and results for chemical, mechanical and environmental data. They are doing extensive analysis,material balances with all the variables present in many plastics, feedstock and output analysis, safety systems and permitting. This data and documentation will allow us to deploy these processors quickly.
It's important we do this right. I am constantly faced with the decision to make it run for a month, week, day, 10T, 100 barrels, 1000 barrels (what is the magic number?) continuous and then report and produce run ticket to prove it's the real thing, then go through the proper documentation process, tear down, rebuild, then roll out . It would delay us as I don't have a second one while the first is torn apart for all the analysis and poss. changes required to maximize deployment.
Regards,
John Bordynuik CEO JBI |