.US Gold Corporation: Nevada Exploration Update Two New Areas Return Early Encouragement Gold Bar Drilling Returns: 1.77 gpt Gold Over 38.1 m
Share retweet EmailPrint..Companies:U.S. Gold Corporation Common StUS Gold Corporation.Related Quotes Symbol Price Change UXG 7.52 +0.36
Press Release Source: US Gold Corporation On Monday December 6, 2010, 9:00 am EST TORONTO, ONTARIO--(Marketwire - 12/06/10)
- US GOLD CORPORATION (AMEX:UXG - News)(TSX:UXG - News) is pleased to announce that recent drilling in Nevada has returned encouraging assay results from its Limo and Gold Bar Projects. At Limo, two new mineralized areas have been discovered: 1) a high-grade silver/gold vein, and 2) a potential bulk tonnage target. The best results from these two areas returned: 852 gpt silver, 1.77 gpt gold over 6.4 meters and 1.48 gpt gold over 48.8 meters, respectively. Drilling at Gold Bar continued to focus on expanding the gold mineralization beyond the current resource, returning 1.77 gpt gold over 38.1 meters.
1) LIMO PROJECT
Two New Areas Return Early Encouragement
Limo, located 75 miles (120 km) east of Gold Bar, is a large 44 sq. mile (114 sq. km) property that produced 91,000 ounces of gold between 1989 and 1990. In July 2009, US Gold released an initial resource estimate for the project, outlining 241,000 ounces of gold within the Measured and Indicated categories and 50,700 ounces of gold in the Inferred(i). US Gold's recent drilling focused on two new areas separate from the mineralization that make up the resource. The first area is called Continental, where a high-grade silver/gold vein has been discovered. The second area is called Cadillac, where drilling has intercepted a target with bulk-tonnage potential.
Continental - New High Grade Silver/Gold Vein
852 gpt silver, 1.77 gpt gold over 6.4 meters
The Continental vein was discovered by surface rock-chip sampling. Results were encouraging, encountering high grades of silver, gold, and base metals. A follow-up core drilling program was designed to test the highly mineralized section of the vein near surface and at depth. Four holes successfully encountered high-grade mineralization at 10-15 meters down hole, along a strike of 20 meters. This zone appears open to the southwest, and follow-up drilling is currently being planned. The objective of further exploration is to find longer and wider sections of mineralization at depth. Highlights from the drilling are shown below:
---------------------------------------------------------------------------- Silver Gold From Length Silver Gold From LengthHOLE# opt opt ft ft gpt gpt m m----------------------------------------------------------------------------LB66 8.9 0.056 34.0 8.0 305 1.92 10.4 2.4LB69 33.2 0.130 33.4 4.6 1140 4.44 10.2 1.4LB70 16.4 0.047 39.0 18.0 561 1.60 11.9 5.5LB72 24.9 0.052 51.0 21.1 852 1.77 15.5 6.4Incl 194.5 0.225 54.0 1.0 6667 7.70 16.5 0.3Incl 107.9 0.149 62.8 3.2 2467 5.12 19.1 1.0----------------------------------------------------------------------------(opt = Troy ounces per short ton, gpt = Grams per metric tonne. True widthsof the intercepts are unknown). The Continental Vein is composed mainly of calcite, dolomite and barite. Within the vein are pods of silicified gossan mineralized with gold, silver, lead and zinc. The strongest mineralization appears to follow a near-surface favorable host lithology within the Guilmette limestone, and may extend beyond the limits of the vein itself.
Cadillac - Potential Bulk Tonnage Target
1.48 gpt gold over 48.8 meters
At Cadillac a total of four widely spaced holes (75 meters apart) were drilled in order to identify what US Gold's geologists believe is a potential bulk tonnage gold target buried by up to 100 m of gravel cover. The initial objective of the drilling was to deepen a historical hole that had reportedly ended in mineralization. Although gold was encountered in this hole the most encouraging result was located 75 meters away, returning 1.48 gpt gold over 48.8 meters. There has been very limited drilling around this hole, and more is scheduled to be completed before year-end. Highlights from three of the four holes drilled are shown below:
---------------------------------------------------------------------------- Gold From Length Gold From LengthHOLE# opt ft ft gpt m m----------------------------------------------------------------------------LB62 0.021 730 55 0.71 222.5 16.8LB64 0.033 540 25 1.14 164.6 7.6LB71 0.043 450 160 1.48 137.2 48.8----------------------------------------------------------------------------(opt = Troy ounces per short ton, gpt = Grams per metric tonne. True widthsof the intercepts are unknown). 2) GOLD BAR PROJECT
Recent expansion drilling at Gold Bar, where US Gold is currently completing a pre-feasibility study, focused mainly on two areas: Cabin Creek, and North Gold Ridge. The Cabin Creek and North Gold Ridge areas are part of the Gold Bar resource estimate.
North Gold Ridge - Expansion Drilling
1.77 gpt gold over 38.1 meters
During the second half of this year drilling has been focused on expanding the North Ridge mineralization to the southeast and northwest. New drilling continues to show that the mineralization is expanding beyond the limits of the current resource. The best result from the recently completed holes returned 1.77 gpt gold over 38.1 meters. Drilling to follow up on these results will occur once additional permits are approved, which is expected by next spring. Highlights of drilling are as follows:
---------------------------------------------------------------------------- Gold From Length Gold From LengthHOLE# opt ft ft gpt m m----------------------------------------------------------------------------GB154 0.031 440 75 1.07 134.1 22.9GB165 0.052 275 125 1.77 83.8 38.1Incl 0.118 330 15 4.05 100.6 4.6Incl 0.104 370 10 3.56 112.8 3.0GB167 0.031 420 25 1.05 128.0 7.6GB168 0.027 575 50 0.93 175.3 15.2----------------------------------------------------------------------------(opt = Troy ounces per short ton, gpt = Grams per metric tonne. True widthsof the intercepts are unknown). Cabin Creek - Expansion Drilling
On September 13, 2010 US Gold announced that drilling had encountered a new deeper zone at Cabin Creek that returned a good hole of 1.14 gpt gold over 73.2 m. With drilling to expand the mineralization shown below, a zone measures 100 m x 100 m and up to 80 m thick has now been defined. Highlights of drilling are as follows:
---------------------------------------------------------------------------- Gold From Length Gold From LengthHOLE# opt ft ft gpt m m----------------------------------------------------------------------------GB158 0.023 640 135 0.78 195.1 41.1GB159 0.037 460 20 1.27 140.2 6.1GB156 0.022 625 60 0.75 190.5 18.3----------------------------------------------------------------------------(opt = Troy ounces per short ton, gpt = Grams per metric tonne. True widthsof the intercepts are unknown). ABOUT US GOLD (www.usgold.com)
US Gold's goal is to qualify for inclusion in the S&P 500 within the next 5 years. US Gold explores for gold and silver in the Americas, has an exciting silver discovery called El Gallo in Mexico, and is advancing its Gold Bar Project in Nevada towards production. US Gold has a strong treasury and is debt free. The company's shares are listed on the NYSE and the Toronto Stock Exchange under the symbol UXG, trading 1.2 million shares daily. US Gold's shares are also included in S&P/TSX and Russell indices.
(i) Limo Project resource summary:
---------------------------------------------------------------------------- Contained Ounces Tonnes Gold Grade (g) (oz)----------------------------------------------------------------------------Measured 5,874,000 0.891 168,350----------------------------------------------------------------------------Indicated 3,705,000 0.613 72,730----------------------------------------------------------------------------Inferred 2,255,000 0.699 50,700
finance.yahoo.com |