We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Pastimes : Plastics to Oil - Pyrolysis and Secret Catalysts and Alterna

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: scion who wrote (12007)8/25/2011 8:35:01 PM
From: Steady_onRead Replies (1) of 53574
 
If you are talking about doing calibration control runs on measuring equipment, I completely agree. Those should be done before every run for critical data and afterwards also to demonstrate that the calibration didn't shift during the run.

If you are talking about process outputs for an R&D situation. Once you have established a baseline against which you are measuring improvements there is no need for control runs.

Each process run is compared to the previous runs. It is either better, the same, or worse. No additional control runs required.