SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : ECHARTERS

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: E. Charters11/21/2011 2:06:14 AM
   of 3744
 
Mahdia Gold Corp.

November 18, 2011 11:47 ET

Mahdia Gold Corp.: Omai Update

Toronto, Ontario -- November 18th 2011 - Mahdia Gold Corp, MGD/CNSX is a publicly listed on the Canadian National Stock Exchange (CNSX) under the symbol MGD.
The company's website is: mahdiagold.com. The website of the CNSX exchange is cnsx.ca.

The management and operating team of Mahdia Gold Corp is pleased to announce ongoing developments in advancement of its key projects in Guyana, with emphasis
on the Flagship Omai Prospecting License area.

With thanks to the staff of the Guyana Geology and Mines Commission the operating team has copied all available digital data and has scanned all available logs, assays, maps and files. The work includes more than 60,000 meters of diamond drilling and an extensive database of shallow auger and BANKA drill holes, compilations and assays. The most recent work, dedicated to the deep Fennell target, was completed during the period 2006 to 2008 and is readily subject to verification and use in NI 43-101 disclosures. The other data must be reconciled with mining records to support emphasis on mineralized material which was discovered but not mined
during the Cambior/ Iamgold phase of production. This includes the West and East Wenot Targets, mineralized intercepts below the bottom of the 2 km long Wenot Pit,shallow intercepts north and west of the Fennell Pit, and geochemical target areas north of Wenot which attracted some exploration attention and are currently the focus of artisanal mining activity. The phase I work program contemplated by Mahdia and the Engineers of AMEC will be supported by a geological compilation and geological report with emphasis on verification of the drill intercepts in Wenot West, Wenot Deep, and Fennel Deep.

The drillholes were selected as representative of the priority geological targets to verified in order to develop a NI-43-101 compliant geological and resource model and form a sound foundation for ongoing geological and engineering work. The company is planning a diamond drilling program with a cumulative total of 10,000 meters, with 2500 meters in shallow holes dedicated Wenot West, 4000 – 4500 meters in deeper holes in selected sections below the Wenot Pit, and the
remainder dedicated to drilling from the Fennell pit margin to verify the deep Fennell Target.

The drilling results representing these targets are summarized in this table. These are historic results from work performed by well qualified professionals in Golden Star Resources, Cambior and IAMGold. They will be the focus of evaluation work including verification holes to confirm the reliability of the historic data and form the basis of ongoing NI 43-101 compliant resource evaluation and disclosures. As of thi s time these data have not been verified and must be regarded as non NI 43-101 compliant and therefore not to be relied upon in evaluation of this prospect.

Mahdia Gold Corp.

HISTORIC DIAMOND DRILLHOLES IN AREAS NOT MINED FOR VERIFICATION DRILLING AND FOLLOW UP 2011 PROGRAM

DRILL HOLE HOLE FINAL (Meters)
NUMBER DEPTH From To Width True width Au Comment

WENOT DEEP Drillholes from Wenot Ore Zone including Deep Extension Exploration Target

0M-704 91.00 201.00 239.00 38.00 38.00 2.57 Deep Undeveloped Target
0M-708 239.00 5.80 16.50 10.70 9.00 3.33 Mined out Wenot Ore Zone
36.00 91.50 55.50 50.00 2.44
OM-642 250.00 45.00 52.50 8.00 8.00 1.20
75.00 84.00 9.00 9.00 1.40
190.50 214.40 23.90 23.90 7.47 Deep Undeveloped Target
OM-324 192.00 159.00 177.00 18.00 18.00 0.92 Deep Undeveloped Target

FENNEL DEEP Drillholes for verification plan

OMU-01 215.0 236.0 21.00 1.67 Intercept to twin
OMU-02 170.00 272.00 98.00 3.24 Intercept to twin
271.00 293.00 22.00 1.14
OMU-04 182.00 218.00 36.00 3.35 Intercept to Twin
280.00 298.00 36.00 1.42
315.00 329.00 14.00 13.64
334.00 357.00 23.00 1.51
361.00 396.00 35.00 4.12
OMU-05 185.00 215.00 30.00 1.43
219.00 252.00 33.00 1.05
255.00 301.00 46.00 2.50
304.00 341.00 37.00 1.82
346.00 377.00 31.00 1.80
514.00 531.00 17.00 2.61

WENOT WEST Drillholes from Undeveloped Target

0m-361 154.00 0.00 9.00 9.00 8.00 1.30 Intercept to twin
OM-0505 50.00 3.00 24.00 21.00 19.00 2.05 Intercept to twin
Including 3.00 15.00 12.00 12.00 3.60

0M-0301 84.00 0.00 24.00 24.00 20.00 1.02 Intercept to Twin
0M-0312 40.00 0.00 36.00 36.00 32.00 1.07 Intercept to Twin
0M-0324 192.00 159.00 177.00 18.00 16.00 0.92 Maps resource envelope
0M-0361 154.00 0.00 9.00 9.00 8.00 1.30 Intercept to Twin
105.00 138.00 33.00 30.00 1.08
0m-440 65.50 9.00 30.00 21.00 20.00 4.71 Intercept to twin
0M-0646 121.00 40.50 63.00 22.50 20.00 0.80 Maps resource envelope
OM-0838 7.50 26.50 19.0 19.0 0.62
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext