SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : ECHARTERS

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: E. Charters11/23/2011 9:22:51 PM
   of 3744
 
NEWSTRIKE CAPITAL INTERSECTS 135.40 METERS OF 5.57 G/T AU AND 75.30 METERS OF 4.42 G/T AU AT THE ANA PAULA PROJECT

Newstrike Capital Inc. has released the latest drill results received from the ongoing 2011 drill program at the Company's 100%-owned Ana Paula Project, Guerrero Gold Belt (GGB). This series of drill holes all intersected multiple closely spaced intervals of gold mineralization over extended mineralized intersections and are from a program focused on delineating the boundaries of the high grade Breccia Zone.

Highlights from this series include:

Drill hole AP-11-69 intersected multiple intervals including 11.47 meters of 1.48 g/t Au, 48.00 meters of 0.52 g/t Au, 18.00 meters of 0.91 g/t Au, 34.36 meters of 0.57 g/t Au and 28.47 meters of 1.12 g/t Au.

Drill hole AP-11-70 intersected strong mineralization over multiple intervals. Some of the better intervals include 47.20 meters of 1.78 g/t Au, including 10.2 meters of 6.52 g/t, Au, 132.85 meters of 1.50 g/t Au, 122.00 meters of 0.67 g/t Au and a high grade interval of 33.00 meters of 12.39 g /t Au.

Drill hole AP-11-71 intersected high grade mineralization including 75.30 meters of 4.42 g/t Au and 135.40 meters of 5.57 g/t Au that includes 1.15 meters of 305.15 g/t Au.

Drill hole AP-11-72 also intersected multiple intervals including 40.54 meters of 3.86 g/t Au that also includes 20.87 meters of 7.79 g/t Au. Other intervals include 34.16 meters of 1.82 g/t Au including 1.50 meters of 17.20 g/t Au.

Selected highlights from this series of drill results are presented in the following table. A complete table of mineralized intersections, drill hole location maps and drill sections are available on the company website at newstrikecapital.com.

This series of drill holes are all from the ongoing delineation program of the high grade Breccia Zone, located in the southeast quadrant of a large exploration target area defined by a one by two kilometer surface gold geochemical anomaly with co-incident geophysical anomalies. The company has completed and reported a total of 17 drill holes or just over 9,775 meters into the Breccia Zone and another 61 drill holes or just over 20,620 meters into the step out and infill drill program since drilling began in October 2010 with two drill rigs. To continue the drill program of Breccia Zone delineation and the infill and step out drilling that will include step outs to the southwest and northwest quadrants of the Ana Paula Project area, the company recently increased its drill production capacity to three drill rigs and will shortly add a fourth.

Preliminary modelling of the Breccia Zone shows that it is an irregularly shaped body plunging steeply to the southwest with approximate true dimensions of 250 meters by 150 meters and a 250 meter vertical depth as drilled to date (September 19, 2011 press release), and that mineralization remains open along trend and at depth. The true thickness of high grade intercepts has not been determined. Drilling will continue to delineate and extend the Breccia Zone to its full dimensions as the company works towards a NI43-101 resource estimate, expected in 2012.

The Ana Paula Project is central to Newstrike's 88,000 hectares in the GGB and forms part of a district scale mining camp that is host to Torex Gold's advanced Morelos Project and to Goldcorp's producing Los Filos project. Ken Thorsen, a director of the company and a qualified person under NI43-101 has reviewed the contents of this press release. The drill program and all project operations are conducted under the direction and supervision of Dr. Craig Gibson, PhD, CPG and a qualified person under NI43-101.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext