SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : DISCOVERY BOARD ~ PRECIOUS METALS ENERGY URANIUM OIL

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: PaperPerson who wrote (4524)1/16/2012 10:19:57 AM
From: PaperPerson  Read Replies (1) of 4690
 
Claude Resources Inc. Intercepts 195.06 Grams of Gold per Tonne Over 2.29 Metres True Width in L62 Zone at Seabee Gold Operation

SASKATOON, Jan. 16, 2012 /CNW/ - Claude Resources Inc. (TSX-CRJ; NYSE Amex-CGR) today reported recent exploration results from its L62 discovery at the 100 percent owned and operated Seabee Gold Mine. The L62 deposit is located approximately 200 metres away from existing development in the hanging wall of the Seabee Mine. The drilling was completed between September and December of 2011, with the results to be incorporated into an updated National Instrument 43-101 resource calculation anticipated in the first quarter of 2012.

The final drill results from the 2011 underground drill program are summarized in Table 1 and Figure 1. Highlights of the L62 results released today include:

•12.81 grams of gold per tonne over 6.70 metres true width (U11-649);
•14.83 grams of gold per tonne over 5.19 metres true width (U11-650);
•195.06 grams of gold per tonne over 2.29 metres true width (U11-651);
•22.03 grams of gold per tonne over 4.41 metres true width (U11-661);
•24.16 grams of gold per tonne over 5.71 metres true width (U11-663); and
•27.06 grams of gold per tonne over 4.83 metres true width (U11-382).
Drilling intercepted economic grades and widths approximately 25 metres along strike and 125 metres up-dip from previous high grade intercepts. The L62 deposit is now interpreted to have an estimated strike length of up to 85 metres and a dip length of 400 metres. Drilling immediately down plunge encountered sporadic economic grades, with the geological structure considered open in all directions.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext