We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Cymer (CYMI)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Bookdon who wrote (10602)11/26/1997 6:01:00 PM
From: Peter Paulissen  Read Replies (2) of 25960
 
Re: Installation of Excimer Lasers in Semi-Conductor Fabs

Can anybody explain to me in a nutshell the time schedule and events needed for the installation of lasers and stepper in a semi-conductor fab?

a.) How long does it take the stepper people to build and test one of these machines, and at what time is the laser required in this process?

b.) How long does it take to install one of these steppers in a semi-conductor fab, and what testing is needed to get out all the bugs so that it can run for full scale production?