SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Golden Triangle

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: kidl7/25/2012 9:54:44 AM
  Read Replies (2) of 493
 
PVG Pretium drills 0.5 m of 41,582 g/t Au at Brucejack

Pretium Resources Inc (TSX:PVG)
Shares Issued 93,677,636
Last Close 7/24/2012 $13.31
Wednesday July 25 2012 - News Release

Mr. Robert Quartermain reports

PRETIUM RESOURCES INC.: 41,582 GRAMS PER TONNE GOLD INTERSECTED IN THE VALLEY OF THE KINGS

Pretium Resources Inc. has released the highest-grading gold intersection encountered to date at the Brucejack project, drilled in the Valley of the Kings.

The bonanza-grade intercepts from a downhole depth of 200.97 meters in hole SU-452 include:

0.5 meters with uncut grades of 41,582 grams of gold per tonne (1.6 feet averaging 1,212.8 ounces gold per ton); 0.5 meters with uncut grades of 4,902 grams of gold per tonne (1.6 feet averaging 143.0 ounces gold per ton); 0.5 meters with uncut grades of 2,251 grams of gold per tonne (1.6 feet averaging 65.7 ounces gold per ton). Assays for a three meter section of hole SU-452 have been received, which, including the three intercepts above, average 8,330 grams of gold and 5,628 grams of silver per tonne uncut over the three meters (9.8 feet averaging 243.0 ounces of gold and 164.2 ounces of silver per ton). Assays for the remaining 352 meters of hole SU-452 will be reported as they are received.

Hole SU-452 was collared on section 426625E, which also includes the high-grade intercepts from: hole SU-230, grading 7,240 grams per tonne gold over 1.0 meter, 510 grams per tonne gold over 1.23 meters and 472 grams per tonne gold over 1.5 meters; hole SU-237, grading 679 grams per tonne gold over 1.0 meter and 451 grams per tonne gold over 1.0 meter; and hole SU-325, grading 1,590 grams per tonne gold over 0.59 meters. Hole SU-452 was collared 169 meters east of the hole SU-115, which intersected 18,755 grams per tonne gold uncut over 0.6 meters, the reigning highest grade intersection prior to hole SU-452. A cross section through the Valley of the Kings at section 426625E will be posted on our web site, www.pretivm.com.

Seven drills are now turning at Brucejack, with a focus on definition drilling in the Valley of the Kings as well as testing extensions of the Valley of the Kings and other high-grade zones.

We have received the permit required to commence the underground exploration program at Brucejack. The underground contractor is mobilizing equipment to site with crews to follow later this month. The first phase will be to slash out the existing West Zone underground workings to five-by-five meters down to the 1330 meter level, a distance of approximately 500 meters. The next phase will be to advance the decline from the 1330 meter level of the West Zone to the 1314 meter level in the Valley of the Kings, a distance of approximately 450 meters. We expect to take an underground bulk sample in the Valley of the Kings in the first half of 2013.

Table 1: Selected Intercepts from Drill Hole SU-452, July 2012(1,3,4)                                                                                                                                 Interval                          Hole     Collar    Dip/       From       To   (met-   Gold  Silver Capping No.     Coords. Azimuth   (meters) (meters)   -ers)  (g/t)   (g/t) (2)    SU-452 6257869N -55/358     200.97   203.97    3.00  403.7 1,292.5 4 samples         426624E                                                    cut to                                                                       500 ppm                                                                      Au/                                                                          2 samples                                                                    cut to                                                                       2,500 ppm                                                                    Ag                                  or 200.97   203.97    3.00  8,330 5,628.4                                   incl 200.97   201.47     0.5  412.4   313.0                                   incl 201.47   201.97     0.5 41,582  27,725                                   incl 201.97   202.47     0.5  2,251   1,770                                   incl 202.47   202.97     0.5   9.97    12.0                                   incl 202.97   203.47     0.5  4,902   3,290                                   incl 203.47   203.97     0.5  820.0     660                                                                                         (1)   True thickness to be determined.                                       (2)   Unless otherwise indicated as uncut, all gold assays over 500 g/t were       cut to 500 g/t.                                                        (3)   Assays pending for the remaining 352 meters of SU-452.                 (4)   All samples were submitted for preparation and analysis by ALS Chemex        at its facilities in Terrace, B.C. All samples were analyzed using           multi-digestion with ICP finish. Samples over 100 ppm silver were            reanalyzed using four acid digestion with an ore grade AA finish.            Samples over 1,000 ppm silver were fire assayed with a gravimetric           finish. Samples with over 10 ppm gold were fire assayed with a               gravimetric finish. One in 10 samples was blank, one in 20 was a             standard sample, and differing one in 20 samples was a field duplicate       one-quarter split core assayed at ALS Chemex in Vancouver, B.C.         
Assay results for completed drilling will be reported as they are received over the course of the 2012 drilling season.

Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, Pretium Resources Inc. is the Qualified Person (QP) responsible for the Brucejack Project exploration program.

We seek Safe Harbor.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext