SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (2401)8/28/2013 9:10:45 AM
From: Goose94Read Replies (1) of 203365
 
Redstar Gold (RGC-V) drills 9.5 m of 10.39 g/t Au at Newman

Aug 28, 2013 - News Release

Redstar Gold Corp. has released additional high-grade gold results from the 2013 diamond drill program at the Newman Todd property in Red Lake, Ont. The four holes reported in this release were drilled on Sections 2000 and 2025 (Note: NT-151 was released by Confederation on Aug 23, 2013). These holes together have intersected high grade mineralization which is interpreted to be continuous across both cross sections. The mineralization is closely associated with the hanging wall (southern) contact of the Newman Todd Structure ("NTS"). Drilling in 2013 has focused on a 575 metre corridor within the NTS termed the Hinge Zone. The entire strike length of the drilled area of the NTS is approximately 1.8 km and this strike remains untested for an additional 400 metres to the south-west and at depth. (See figures 1, 2 & 3 attached to this news release.) Drilling Highlights:

-- NT-151 (previously released by Confederation Minerals on Aug 23, 2013) intersects 13.46 g/t gold over 1.5 metres including 24.0 g/t gold over 0.5 metres -- NT-152 intersects 98.60 g/t gold over 1.0 metre -- NT-153 intersects 12.42 g/t gold over 3.0 metres including 28.8 g/t gold over 0.5metre and 10.39 g/t gold over 9.5 metres including 35.0 g/t gold over 0.5metres and 103.0 g/t gold over 0.5 metres -- NT-154 intersects 16.7 g/t gold over 1.0 metre

Hole ID From (m) To (m) Width (m)* Au (g/t)
NT-151 139.0 140.0 1.0 3.19
NT-151 and 239.0 244.0 5.0 5.30
NT-151 including 242.5 244.0 1.5 13.46
NT-151 and including 242.5 243.0 0.5 12.10
NT-151 and including 243.0 243.5 0.5 24.00
NT-151 and 281.0 283.0 2.0 3.75
NT-151 including 281.0 282.0 1.0 4.65
NT-151 and 304.0 305.0 1.0 5.23
NT-152 253.0 254.0 1.0 3.26
NT-152 and 264.0 269.0 5.0 3.97
NT-152 including 264.0 264.5 0.5 26.50
NT-152 and 287.0 288.0 1.0 98.60
NT-153 67.0 70.0 3.0 12.42
NT-153 including 67.0 68.5 1.5 17.16
NT-153 and including 68.0 68.5 0.5 28.80
NT-153 and 178.0 179.0 1.0 4.48
NT-153 and 231.0 240.5 9.5 10.39
NT-153 including 232.5 233.0 0.5 35.00
NT-153 and including 236.5 240.5 4.0 15.70
NT-153 and including 238.0 239.0 1.0 57.05
NT-153 and including 238.0 238.5 0.5 103.00
NT-153 and including 240.0 240.5 0.5 6.91
NT-154 37.0 38.0 1.0 3.47
NT-154 and 44.0 45.0 1.0 3.11
NT-154 and 122.0 123.0 1.0 4.31
NT-154 and 130.0 143.0 13.0 3.11
NT-154 including 133.0 134.0 1.0 4.25
NT-154 and including 137.0 138.0 1.0 7.70
NT-154 and including 142.0 143.0 1.0 16.70
NT-154 and 182.0 183.0 1.0 3.07
NT-154 and 205.0 209.0 4.0 3.28
NT-154 and 280.0 281.0 1.0 3.23

R. Bob Singh P.Geo, President of Redstar states: "The high grade gold mineralization intersected in these holes and other holes in this area is closely related to the hanging wall or southern contact of the NTS. The zones occur approximately 5 to 25 metres away from the contact. This style of gold mineralization is well documented at the Red Lake Mine where the high grade zone occurs proximal to a folded Mafic/Ultramafic contact. We look forward to additional results from this exciting new high grade discovery in Red Lake."

Exploration work at the Newman Todd project is funded by the operator, Confederation Minerals Ltd. (CFM-V) ("Confederation"). Pursuant to an option agreement with Redstar, Confederation can earn a 50% interest in the project by spending $5.0 million on exploration, paying Redstar a total of $250,000, and issuing Redstar 500,000 shares by November 2013. To date Confederation has spent in excess of $5.0 million on exploration on the project, paid Redstar $175,000 and issued Redstar 350,000 shares. Confederation can earn an additional 20% interest by producing an NI43-101 compliant Preliminary Economic Assessment (PEA) by November 2016.

Andrea Diakow P.Geo is the qualified person as defined by National Instrument 43-101 and has reviewed the technical content related to the disclosed drill results in this news release. Core samples from the program were cut in half using a diamond cutting saw and were sent to Activation Laboratories Ltd. in Red Lake, Ontario, an accredited mineral analysis laboratory. All samples were analyzed for gold using standard Fire Assay-AA techniques. Samples returning over 3.0 g/t gold were analyzed utilizing standard Fire Assay-Gravimetric methods. Certified gold reference standards, blanks and field duplicates were routinely inserted into the sample stream as part of Confederation's quality control/quality assurance program.

We seek Safe Harbor.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext