SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (2893)10/16/2013 10:34:52 AM
From: Goose94Read Replies (1) of 203798
 
QEC-T "Holy Gap Man" second one. Open @ $1.38

Questerre 05-23 flow tests at 815 bbl/d condensate

Oct 16, 2013 - News Release

Questerre Energy Corp. has released the test results from its fifth horizontal well at 05-23-63-6W6M in the Kakwa-Resthaven area of west-central Alberta. The 05-23 Well is approximately two miles west of the existing producing wells on its joint venture acreage and 70m to 100m deeper vertically. The well was successfully completed with a seven-stage slick water fracture stimulation in the 1400m horizontal section. The well was tested for a 170-hour period thereafter.

Over the last 24 hours of the production test, the well flowed 815 bbl/d of condensate and 3.7 MMcf/d of natural gas against anticipated gathering system pressure of approximately 2000 kPa (290 psi) on choke sizes ranging from half inch to one inch. During the entire test, the well flowed at an average condensate to natural gas rate of 195 bbls per MMcf. The well will be tied into the local gathering system shortly. Questerre holds a 25% working interest in the 05-23 Well.

The Company also reported that its next joint venture well located at 16-25-63-5W6M (the "16-25 Well") has reached total measured depth of 4680m. Production casing is being run into the 16-25 well and, subject to equipment availability and weather, completion operations are scheduled to begin next month. Drilling time from spud to total measured depth for the 16-25 Well took approximately 34 days, 12 days shorter than previous wells on its joint venture acreage.

Drilling and completion costs are demonstrating learning curve benefits earlier than originally expected. Questerre estimates current well drilling and completion costs at less than $8 million. This is a cost savings of approximately 25% of the initial well costs of $10 million. Questerre expects further material savings will be realized in the future through pad drilling and additional efficiencies.

Questerre updated the testing of the 15-01 Well, recently designated as the 09-01-62-6W6M Well (the "09-01 Well").

A chemical soak and squeeze on the Montney formation was successful in re-establishing gas flows and high pressure on surface. The flow from the 09-01 Well included very anomalous hydrogen sulphide rates.

Michael Binnion, President and Chief Executive Officer of Questerre, commented, "We were pleased we were able to re-establish high pressure high rate flow from the 09-01 Well. The high sour and low liquids rates are unusual and could reflect contribution from another zone. Based on these results, we are reviewing a possible new up-hole gas discovery."

Due to the high pressure and sour gas rates encountered, well control and safety was the main priority during these operations. Furthermore, regulatory restrictions on testing of critical sour wells limit Questerre's ability to conduct an extended cleanup and flow back for the 09-01 Well. Further testing of this well will require critical sour processing facilities and pipelines. Currently there are no such sour facilities in the immediate area. As a result, the 09-01 Well is currently suspended as a potential gas producer while the Company evaluates options for producing the well and new drilling on this block.

On its joint venture acreage to the north where the Company holds a 25% working interest, the operator reported that it has contracted a drilling rig for one year and the next well on this acreage is expected to spud in November.

The operator also reported that equipment installation of the joint central compression and condensate stabilization facility is underway. The facility has a capacity of 15 MMcf/d plus associated liquids. It is designed to address the existing production constraints and is anticipated to be on-stream prior to the end of 2013.

We seek Safe Harbor.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext