SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Politics of Energy

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: TimF who wrote (45128)12/23/2013 5:03:24 PM
From: Eric  Read Replies (1) of 86356
 
We can play amortization costs all day. It was designed to be reliable and provide power with virtually 100% reliability which the "grid served" islands totally lack. (30 outages totaling over 14 days since 2000)

The Stuart home has a 24 KwHr battery with a design life of 20 years. That cost was built into the project.

The home down here on Three Tree Pt. has suffered over 11 days of outages since 2006. It will have battery back up too but with a larger PV array than Stuart it can be smaller.

Eric

Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext