SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Ride the Tiger with CD

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: SwampDogg who wrote (233143)1/18/2014 5:37:53 PM
From: Rocket Red  Read Replies (1) of 312982
 

Excelsior’s Stock More Than Triples After Prefeasibility Study Results Are Released
Written by Peter Grandich
Saturday, 18 January 2014 04:53


Shares of Excelsior Mining Corp. (TSX.V: MIN) (OTCQX: EXMGF) soared on Friday after the company announced the results of a comprehensive Prefeasibility Study (“PFS”) on the North Star deposit of the Gunnison Copper Project, located in southern Arizona. Gaining 358% on total trading volume of nearly 16 million, the stock closed on Friday at $0.55. The way the share price traded all day, it looked like it wanted to go even higher at the close.

The PFS, which used a copper selling price of US$2.75 per pound, reported a pre-tax NPV7.5 of $1.24 billion, a pre-tax IRR of 59.7% and a payback period of 1.8 years for the preferred “Acid Plant” option. The PFS also reported initial estimated capital costs (excluding sustaining capital) of $284.74 million with average life-of-mine operating costs of $0.68 cents per pound. These values are among the lowest per pound capital and operating costs for copper projects not only in North America, but the copper industry as a whole.

Also included in the report was an updated resource for the North Star deposit, which now hosts a Probable Mineral Reserves of 3.61 billion pounds of copper (632 M tons at 0.29%), a Measured and Indicated Mineral Resource of 3.91 billion pounds of copper (683 M tons at 0.29%) and an Inferred Mineral Resource of 1.40 billion pounds of copper (338 M tons at 0.21%).

With initial production expected to commence in Q4 2016, the company plans to mine the deposit through in-situ recovery with an annual production rate of 110 million pounds of copper for the first 14 years, with a total of 1.682 billion pounds of copper to be produced over the 20 year mine life.

It's good to see the market rewarding great results; Excelsior's big move is a well-earned reward for a solid management team with a high quality project. Today's trading was fun to watch but it should be noted that even at $0.55, Excelsior is still trading at well under 5% of the NPV.

Stay tuned.

Peter Grandich is a compensated consultant to the company http://www.grandich.com/disclosure.html


Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext