SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Beat The Street With SI Traders

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Rocket Red who wrote (144520)5/7/2014 9:44:46 AM
From: Rocket Red  Read Replies (1) of 233883
 
Peregrine releases NI 43-101 inferred resource for CH-6

2014-05-07 09:33 ET - News Release
Shares issued 143,843,194
PGD Close 2014-05-06 C$ 0.41


Mr. Eric Friedland reports

PEREGRINE REPORTS 7.47 MILLION CARAT INFERRED RESOURCE FOR THE TOP 250 METRES OF THE CH-6 KIMBERLITE AND TONNAGE ESTIMATES FOR CH-7 AND CH-44

Peregrine Diamonds Ltd. has released estimates for a maiden independent Canadian National Instrument 43-101-compliant inferred mineral resource for the top 250 metres of the CH-6 kimberlite pipe and additional tonnage as a target for further exploration. Key elements of the CH-6 estimates are:

--  An Inferred Mineral Resource of 7.47 million carats of diamonds in 2.89      million tonnes of kimberlite to a depth of 250 metres   --  Grade of 2.58 carats per tonne   --  An average diamond price of US$213 per carat and a modelled price range      between US$163 and US$236 per carat as determined by WWW International      Diamond Consultants in February 2014   --  An estimate of 2.60 to 3.47 million tonnes of kimberlite classified as a      target for further exploration    --  The kimberlite is open at depth


Tonnage estimates have been completed for the CH-7 and CH-44 kimberlites. The CH-7 kimberlite tonnage estimate is between 2.75 and 3.97 million tonnes from surface to a depth of 280 metres. The CH-44 tonnage estimate is between 1.16 and 2.05 million tonnes from surface to a depth of 230 metres. Both CH-7 and CH-44 are open at depth.

The tonnage estimates that have been identified at CH-6, CH-7 and CH-44 are classified as targets for further exploration and are conceptual in nature. There has been insufficient exploration to define a mineral resource on those targets and it is uncertain if further exploration will result in the tonnage estimates being delineated as a mineral resource.

The CH-6, CH-7 and CH-44 kimberlite pipes are located on Peregrine's 100 percent-owned Chidliak project ("Chidliak"), 120 kilometres from Iqaluit, the capital of Nunavut, Canada.

Geostrat Consulting Services Inc. ("Geostrat"), a consulting firm specializing in geological modelling and resource evaluation for diamonds and other commodities, prepared the CH-6 Inferred Resource estimate and verified the tonnage estimates for CH-6, CH-7 and CH-44. A detailed technical report, prepared in accordance with NI 43-101 will provide more details on this work and will be available within 45 days on SEDAR and the Company's website.

CH-6 INFERRED RESOURCE and ADDITIONAL TONNAGE ESTIMATE

The CH-6 kimberlite has a surface expression of approximately one hectare and is open at depth. The Inferred Mineral Resource estimate was determined by integrating kimberlite volumes with density, petrology and diamond content data utilizing a geological model prepared by Peregrine personnel and reviewed by Geostrat. Size frequency analyses of diamond results from the 2013 bulk sample and caustic fusion diamond results from drill core were undertaken to confirm the continuity of mineralization and the consistency of the diamond population throughout the kimberlite.

NI 43-101 standards and Canadian Institute of Mining and Metallurgy guidelines stipulate that a Mineral Resource needs to have a "reasonable prospect of economic extraction". In assessing whether the CH-6 Inferred Resource met this standard, Geostrat considered publicly available costs from northern Canadian diamond projects relative to the total estimated in-situ value of the CH-6 Mineral Resource and concluded that there was a reasonable prospect of economic extraction.

In addition to the 2.89 million tonne Inferred Resource, an additional 2.60 to 3.47 million tonnes of kimberlite has been estimated at CH-6, with 1.47-1.53 million tonnes above 250 metres depth. The following table summarizes the tonnage that has been estimated at CH-6.

CH-6 ADDITIONAL TONNAGE ESTIMATES

                           DEPTH BELOW SURFACE       ESTIMATED TONNAGE RANGE                                             (m)              (million tonnes)                            --------------------------------------------------                                                            LOW           HIGH                            --------------------------------------------------                                         105-250           1.47           1.53                            --------------------------------------------------                                         250-380           1.13           1.94  ----------------------------------------------------------------------------  Totals                                 105-380           2.60           3.47  


Peregrine is currently planning a core drilling program at CH-6 in an effort to convert the tonnage estimate into an Inferred Resource.

CH-7 AND CH-44 INITIAL TONNAGE ESTIMATES

Initial tonnage estimates were determined from geological models of the CH-7 and CH-44 kimberlites prepared by Peregrine personnel and verified by Geostrat. The estimates are presented in the following table. Both kimberlites are open at depth.

CH-7 and CH-44 TONNAGE ESTIMATES

                           DEPTH BELOW SURFACE       ESTIMATED TONNAGE RANGE                                             (m)              (million tonnes)                                                ------------------------------  KIMBERLITE                                                LOW           HIGH  ----------------------------------------------------------------------------  CH-7                                     0-280           2.75           3.97  ----------------------------------------------------------------------------  CH-44                                    0-230           1.16           2.05  


The CH-7 kimberlite, located approximately 15 kilometres southeast of CH-6, has a surface expression of approximately one hectare. The 2.75 million tonnes estimated to 160 metres below surface is considered reasonably defined with good drilling support. The 1.22 million tonnes estimated from 160 to 280 metres below surface has been identified with limited drilling support and the confidence level will increase with more drilling. As reported on November 22, 2010, a 47 tonne mini-bulk sample collected from the surface of CH-7 returned a grade of 1.04 carats per tonne.

The CH-44 kimberlite, located approximately 17 kilometres southeast of CH-6, has a surface expression of approximately 0.5 hectare. The 1.16 million tonnes estimated to 120 metres below surface is considered reasonably defined with good drilling support. The 884,000 tonnes estimated from 120 to 230 metres below surface has been identified with limited drilling support and the confidence level will increase with more drilling. As reported on November 21, 2011, caustic fusion diamond results from 535 kilograms of drill core collected to date are encouraging, and CH-44 is currently a target for future bulk sampling.

New caustic fusion diamond results from the CH-7 and CH-44 kimberlites will be reported this quarter.

Mr. Alan O'Connor, Professional Geologist, Peregrine's Program Manager, Resource Evaluation, is a Qualified Person under National Instrument 43-101 and was responsible for the design and conduct of the CH-6 bulk sampling program carried out by the Company at Chidliak in 2013. Mr. David Farrow and Ms. Darrell Farrow of Geostrat Consulting Services Inc., both Professional Geologists and independent, external Qualified Persons and consultants to Peregrine, prepared the CH-6 Inferred Resource estimate and reviewed and verified the CH-6 tonnage estimate and CH-7 and CH-44 tonnage estimates. Ms. Catherine Fitzgerald, Peregrine's Project Geologist, Resource Definition, and Dr. Jennifer Pell, Peregrine's Chief Geoscientist, both Professional Geologists, were responsible for preparing the CH-6, CH-7 and CH-44 geologic models.

Mr. O'Connor, Mr. Farrow, Ms. Farrow, Dr. Pell and Ms. Fitzgerald have reviewed this release and approve of its contents.

We seek Safe Harbor.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext