SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (8715)9/3/2014 8:37:29 AM
From: Goose94Read Replies (1) of 203932
 
Peregrine Diamonds (PGD-V) - John Kaiser Aug 25, '14 a long-time Peregrine booster, holds the view that "insiders are simply going by the book to boost their stake as cheaply as possible." Those insiders include Mr. Friedland, who currently owns nearly 20 million shares, his older brother, Robert Friedland, who controls 27 million and Ned Goodman, who owns nearly four million. The three have agreed to exercise all their rights and any left unexercised by Peregrine's lesser shareholders.

______________________________________________________________________________________

Peregrine Diamonds (PGD-T) Sept 2nd 2014 is pleased to provide an update on its 2014 field activities and plans to advance its 100 percent-owned Chidliak diamond project ("Chidliak" or the "Project"). Chidliak is located 120 kilometres northeast of Iqaluit, the capital of Nunavut, Canada. The primary goal of Peregrine's 2014 and 2015 Chidliak work programs is to confirm a resource base in three kimberlites with economic potential, CH-6, CH-7 and CH-44. This resource base could form the foundation of an independent, NI 43-101-compliant Preliminary Economic Assessment ("PEA") in 2016.

This season a total of 3,305 metres of core drilling was completed at CH-6, CH-7 and CH-44. The drill program was designed to allow conversion of kimberlite tonnage currently classified as a target for further exploration ("TFFE") into the Inferred Resource category upon completion of the 2015 bulk sampling program. A total of 994 metres of small diameter reverse circulation ("RC") drilling designed to constrain overburden depth and obtain kimberlite contacts at surface has also been completed to date on the three kimberlite bodies.

Exploration activities are ongoing and are focussed on the Southern Priority Area. A new kimberlite, CH-68, has been discovered in this area by prospecting.

Preparations for the 2015 bulk sample program are nearing completion and mobilization of the drill rig and ancillary equipment to Iqaluit has commenced. Assuming successful closure of the current rights offering, bulk sampling by large diameter (up to 26 inch, 66 cm) RC drilling will commence in 2015 on CH-6, CH-7 and CH-44 to confirm continuity of diamond grade throughout the bodies and to obtain parcels of diamonds for valuation. The bulk sampling results, together with the work being completed in 2014, will then be used to estimate the tonnage and grade for each of the pipes. A new resource statement for CH-6 would be prepared and If diamond valuation results warrant, maiden resource statements for CH-7 and CH-44 will be prepared.

Mr. Eric Friedland, Peregrine's Chairman and CEO stated "Since we received the maiden resource statement at CH-6, Peregrine has been carefully analyzing how to advance Chidliak in the most efficient and effective way possible. Based on this work we have made the strategic decision to focus on proving up resources that will support the delivery of a PEA in 2016. CH-6 potentially has some of the highest rock value in the world for a diamond deposit and that resource, combined with potential resources at CH-7 and CH-44, would provide the basis for the completion of the PEA. In addition, we will continue to evaluate other known kimberlites with economic potential as well as high priority exploration targets."

2014 CHIDLIAK RESOURCE DEFINITION UPDATE
The majority of the Company's exploration efforts in 2014 are being devoted to advancing CH-6, CH-7 and CH-44 through the PEA stage. The ongoing work program includes the following activities:
  • TFFE to Resource Conversion at CH-6. Core drilling at CH-6 is designed to convert kimberlite above 250 metres depth currently classified as a TFFE into the Inferred Resource category. This summer, 1183 metres in five holes were drilled at CH-6 (Table 1). In addition,15 small diameter RC holes, totalling 225 metres were completed at CH-6 to better constrain the surface expression of the pipe. Up to six additional RC holes will be drilled prior to the end of this field program. Data from the core and RC drilling, along with new microdiamond analyses will be incorporated into a revised resource statement for CH-6, which is expected in late 2014.
  • Resource Definition Drilling at CH-7 and CH-44. A total of 1,128 metres of core drilling in seven holes was completed at CH-7 and 994 metres in six holes was completed at CH-44 (Table 1). A total of 769 metres of small diameter RC drilling in 42 holes was completed at the two kimberlites in July and August. The 2014 drill data will be used to prepare revised tonnage estimates for CH-7 and CH-44 in late 2014. Core and RC drilling completed this year at CH-7 and CH-44 is designed to:
    • Ensure that the geologic models are sufficiently constrained to allow declaration of Inferred Resources in the future if diamond valuation results obtained from the planned 2015 bulk sample program warrant.
    • Confirm additional tonnage not yet included in the TFFE estimates.
    • Support the planned 2015 bulk sampling program by constraining the geology and establishing one new twin hole ahead of the large diameter RC drilling scheduled to commence in February, 2015.
Until the results from the 2014 resource definition drilling are integrated into the existing models for CH-6, CH-7 and CH-44, it is not possible to quantify the extent that tonnage estimates could change. Peregrine believes that the integration of the 2014 drill data into the geological models will result in increases in the tonnage estimates at each of CH-6, CH-7 and CH-44.

TABLE 1
2014 DRILL HOLE DATA FROM THE CH-6, CH-7 AND CH-44 KIMBERLITES

Drill HoleKimberliteAzimuth Inclination from HorizontalOverburden Intercept (m) Kimberlite Intercepts (m)End of Hole (m)
FromToIntercept
DD25CH-6356°-55°7.047.0236.7189.7266.0
DD26CH-6012°-61°9.088.8176.087.2176.0
DD27CH-6159°-57°7.547.2246.0198.8287.0
DD28CH-6288°-45°12.511.5119.0107.5119.0
DD29CH-6082°-69°4.576.2277.4201.2335.2
DD19CH-7000°-90°3.03.0242.5239.5242.5
DD20CH-7270°-45°3.03.086.783.799.0
DD21CH-7185°-68°7.07.0190.0183.0190.0
DD22CH-7141°-68°3.07.0143.6136.6156.0
DD23CH-7288°-53°3.062.8169.9107.1179.0
DD24CH-7018°-70°4.456.971.014.171.0
DD25CH-7000°-90°8.8--- 190.5
DD13CH-44263°-60°3.088.6245.2156.6252.5
DD14CH-44263°-46°6.392.5112.820.3139.0
DD15CH-44180°-49°5.532.4246.1213.7278.0
DD16CH-44030°-61°3.245.9101.055.1101.0
DD17CH-44030°-75°3.3135.1155.019.9155.0
DD18CH-44282°-55°6.26.263.056.868.0
pdiam.com for a map showing the collar locations for all diamond drilling completed to date in 2014.

2014 PREPARATION FOR PRELIMINARY ECONOMIC ASSESSMENT
Work in 2014 in support of a 2016 Preliminary Economic Assessment included:
  • Geotechnical and Metallurgical Studies. Geotechnical data is being collected from CH-6, CH-7 and CH-44 drill core to facilitate potential future open pit designs. Samples of kimberlite core are also being acquired for use in planned metallurgical and geotechnical studies.
  • Infrastructure and Access Studies. Preliminary studies have identified potential sites for mine infrastructure and access options for a potential diamond mine at Chidliak.
  • Continued Environmental Baseline Studies. Peregrine initiated independent environmental baseline studies on the Project in 2009. Work completed in 2014 includes wildlife surveys, water sampling and ecosystem characterization and archeological studies.
2015 CHIDLIAK BULK SAMPLE PREPARATION UPDATE
Work in preparation for a 2015 bulk sampling program by large diameter RC drilling is nearing completion and mobilisation of the drill rig and ancillary equipment to Iqaluit has commenced. Work completed this summer includes:
  • Large Diameter RC Rig Modifications. Final modifications to a RC drill designed to drill holes up to 66 cm (26") in diameter were completed by Cooper Drilling Canada Inc.
  • Rig Commissioning. The RC rig was successfully tested and commissioned through the drilling of a 170 metre test hole in Colorado USA. The test hole was designed to test the drill systems, material flow and sample collection procedures.
  • Equipment Mobilization. Two 40 foot flat bed truck loads containing two compressors and drill pipe were dispatched from Colorado to Montreal for shipment via sealift to Iqaluit in September. Final preparations for shipping the drill, support equipment and remaining supplies to Iqaluit by sealift in September are underway. In total, six to eight additional flat bed trailer loads will be shipped from Colorado to Montreal for transport by sealift to Iqaluit this shipping season.
  • On Site Preparations. Logistical preparations at Chidliak including drill hole selection and the mobilization of fuel, equipment and supplies and final preparation of the camps that will support the 2015 bulk sample program.
pdiam.com for photos of the bulk sample preparations.

2014 CHIDLIAK NEW TARGET EXPLORATION UPDATE
The majority of the Company's new target exploration efforts in 2014 is focussed in the Southern Priority Area, an area that includes CH-6, CH-7 and CH-44. Exploration work is underway in two principle areas this summer, the CH-6/String of Pearls area and at CH-46. In addition, one new kimberlite was discovered, CH-68.
  • CH-6/String of Pearls area. RC drilling of high priority gravity and magnetic targets proximal to CH-6, and within the String of Pearls structure is planned for early September. These targets are considered a high priority given their immediate proximity to the CH-6 diamond resource.
  • CH-46. In an effort to confirm the coarse diamond size distribution from RC drilling that was reported on June 26, 2014, three core holes will be drilled into the CH-46 kimberlite pipe to obtain a representative sample for diamond testing and to determine tonnage potential.
  • CH-68. On August 21, 2014, prospectors working at anomaly CHI-674 discovered abundant kimberlite float at three localities along a N-S trending magnetic linear. This new discovery, CH-68, is roughly five kilometres east of Discovery camp. The magnetic linear associated with the float occurrences extends for approximately 550 meters. Sufficient float has been collected for a representative microdiamond test.
High-interest kimberlite float was discovered in Area B in 2012. Area B is located approximately 15 kilometres east of CH-6 and it remains a high priority exploration area for the Company. Due to the focus this season on resource delineation at CH-6, CH-7 and CH-44 in preparation for a PEA, the drilling of geophysical targets in this area has been deferred.

CH-6, CH-7 and CH-44 SUMMARY
On May 7, 2014, Peregrine reported an Inferred Resource of 7.47 million carats of diamonds in 2.89 million tonnes of kimberlite at a grade of 2.58 carats per tonne for the CH-6 kimberlite. See "2014 Technical Report for the Chidliak Project, 66° 21' 43" W, 64° 28' 26" N, Baffin Region, Nunavut" for information on the CH-6 resource. Mineral resources are not mineral reserves and do not have demonstrated economic viability. An average diamond value ranging from US$163 to US$236 per carat was determined for a 1,013 carat parcel of commercial-size diamonds recovered from CH-6 in 2013. In addition, an estimated 2.60 to 3.47 million tonnes of kimberlite at CH-6 above 250 metres depth is classified as a TFFE. Tonnage estimates ranging from 2.75 to 3.97 and 1.16 to 2.05 million tonnes of TFFE have also been reported for the CH-7 and CH-44 kimberlites respectively. A 47 tonne mini-bulk sample collected from CH-7 returned a grade of 1.04 carats per tonne and caustic fusion diamond results from 535 kg of drill core from CH-44 are encouraging. The TFFE estimates that have been identified at CH-6, CH-7 and CH-44 are conceptual in nature. There has currently been insufficient exploration to convert the TFFE to a mineral resource on those targets and it is uncertain if further exploration will result in the TFFE estimates being converted to a mineral resource.

Mr. David Farrow and Ms. Darrell Farrow of Geostrat Consulting Services Inc., both Professional Geologists and independent, external Qualified Persons and consultants to Peregrine, prepared the CH-6 Inferred Resource estimate and reviewed and verified the CH-6, CH-7 and CH-44 tonnage estimates. Dr. Herman Grütter, Professional Geologist and Peregrine's Program Manager, Chidliak Exploration, is responsible for the 2014 Chidliak exploration program.

Mr. Farrow, Ms. Farrow and Dr. Grütter have reviewed this release and approve of its contents.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext