SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (10254)2/19/2015 11:50:01 AM
From: Goose94Read Replies (1) of 202374
 
Evrim Resources (EVM-V) and exploration partner SilverCrest Mines (SVL-T) Feb 19, '15 are pleased to announce initial results of nine drill holes on the Company's Ermitaño project in Sonora, Mexico. The 2,656 metre drill program successfully identified the presence of near surface gold and silver mineralization at the El Durazno target.

Evrim President and CEO Paddy Nicol commented, "SilverCrest's objective is to find additional gold-silver resources for the Santa Elena Mine, approximately eight kilometres west of the El Durazno target. Given El Durazno's proximity to the mine and leach pad capacity, the economic threshold for additional discoveries could be quite low. The El Durazno target is the first in a series of prospective areas that will be explored in this developing regional trend. SilverCrest's exploration budget in 2015 for the Ermitaño and adjacent Cumobabi projects is approximately is US$2.3 million and will consist of approximately 6,000 metres of drilling."

Exploration Highlights

The Ermitaño project (see attached Figure 1) is located within the same trend of mineralization that is currently being mined at SilverCrest's Santa Elena mine and comprises an estimated 16,526 hectares. The defined corridor is approximately 10 kilometres by 20 kilometres along a NW-SE trend. The concessions contain Late Cretaceous andesite and rhyolite volcanic rocks which host the vein structures controlling the Santa Elena low sulphidation epithermal mineralization. An exploration program completed in 2014 has tested widespread epithermal mineralization in four defined main targets outlined below:

El Durazno

The El Durazno target comprises two parallel east-west trending corridors of veining and stockwork mineralization with thickness ranging from 4 metres to 50 metres for a defined cumulative strike length of approximately 900 metres. The first corridor (see attached Figure 2) is defined by outcropping of veins and stockwork in an area of 400 metres along strike and 50 metres wide with a total of 86 surface channel samples averaging 1.28g/t gold. The second corridor is defined by outcropping of vein and stockwork in an area of 500 metres along strike and 50 metres wide with 129 surface channel samples averaging 0.34g/t gold. Surface channel samples in the two corridors range from 0.4 metres to 2.0 metres in width and average 1.50 metres in width. Evidence based on epithermal textures and more detailed mineralogical studies suggest a shallower level exposure in a low sulphidation epithermal environment compared to Santa Elena. The interpreted shallow level of exposure presents an excellent opportunity to discover additional mineralization at depth.

Ermitaño West

Ermitaño West contains a network of low sulphidation east-west trending epithermal veins and stockwork within an area of 1,200 metres long and 600 metres wide with 546 surface channel samples averaging 0.17g/t gold over widths ranging from 0.3 metres to 2.0 metres and averaging 1.3 metres. Vein textures suggest a shallower level of exposure in the low sulphidation epithermal environment compared to Santa Elena.

Ermitaño East

Ermitaño East is an east-west trending galena-bearing silver vein system with indications of two different levels of epithermal exposure (deep and shallow). Surface sampling returned significant silver grades with 554 channel samples with an average width of 1.60 metres and an average grade of 14 g/t silver, including 6 samples that exceeded 300 g/t silver.

Veta Valentina

Veta Valentina hosts a 1.2 kilometre long and 10 metre wide east-west trending structural corridor with low sulphidation epithermal veining.

Drill Results

Significant assay results from the drilling program at El Durazno are shown below. Widths are considered near-true thickness. Holes ED-14-002 and 004 had no significant values. All sample analyses were completed by Inspectorate Labs of Reno, Nevada.

Hole ID From (m) To (m) Interval
(m)
Gold
g/t
Silver
g/t
ED-14-001 131.0 132.6 1.6 0.27 3.9
ED-14-003 116.5 118.0 1.5 0.21 1.3
ED-14-005 40.5 60.0 19.5 0.61 4.1
Including 46.1 60.0 13.9 0.72 4.3
Including 54.0 57.0 3.0 1.17 7.1
76.5 78.0 1.5 0.21 1.7
85.5 93.5 8.0 0.21 1.1
163.5 169.0 5.5 0.36 1.3
165.0 169.0 4.0 0.42 0.75
185.0 198.0 13.0 0.86 14.1
Including 193.4 198.0 4.6 2.10 35.5
263.1 265.3 2.2 0.25 7.6
ED-14-006 74.4 95.3 21.0 0.21 3.0
Including 90.3 95.3 5.0 0.36 6.8
144.3 146.3 2.0 0.38 1.9
ED-14-007 69.0 72.0 3.0 0.24 1.6
ED-14-008 53.0 54.2 1.2 0.22 3.4
175.0 191.7 16.7 0.42 13.2
Including 189.2 191.7 2.5 1.58 58.8
ED-14-009 65.0 90.0 25.0 0.59 2.5
Including 65.0 70.0 5.0 1.00 1.9
Including 82.3 90.0 7.7 1.11 4.2

All figures are available in the News Release posted on the Company web page www.evrimresources.com.

Option Agreements

SilverCrest can earn a 100% interest in the Ermitaño Property by paying US$75,000 upon signing the Agreement (paid) and US$50,000 each anniversary thereafter, completing a minimum of US$500,000 in exploration expenditures in the first year, and delivering a Production Notice specifying mine and construction plans with accompanying permits. Upon vesting, SilverCrest will no longer be required to make the annual payments and Evrim will retain a 2% Net Smelter Royalty ("NSR").

SilverCrest can also earn a 100% interest in Cumobabi by paying US$75,000 upon signing the Agreement (paid) and US$50,000 each anniversary thereafter, completing a minimum of US$500,000 in exploration expenditures by the second anniversary, and delivering a Production Notice specifying mine and construction plans with accompanying permits. Upon vesting, SilverCrest will no longer be required to make the annual payments and Evrim will retain a 1.5% NSR.

Qualified Person Statement

Evrim's disclosure of technical or scientific information in this press release has been reviewed and approved by Stewart Harris, P.Geo. Vice President, Technical Services for the Company. Mr. Harris serves as a Qualified Person under the definition of National Instrument 43-101.

About Evrim Resources

Evrim Resources is a mineral exploration company whose goal is to participate in significant exploration discoveries supported by a sustainable business model. The Company is well financed, has a diverse range of quality projects and a database in Mexico and portions of southwestern United States. The existing projects, and generation of quality exploration targets and ideas, are advanced through option and joint venture agreements with industry partners to create shareholder value. Evrim's business plan also includes royalty creation utilizing the Company's exploration expertise and existing projects.

On Behalf of the Board
EVRIM RESOURCES CORP.

Paddy Nicol
President & CEO

To find out more about Evrim Resources Corp.,
please contact Paddy Nicol, President or Howard Davies, COO at
604-248-8648, or visit www.evrimresources.com.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext