SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (11177)2/24/2015 2:41:05 PM
From: Goose94Read Replies (1) of 202718
 
Lake Shore Gold (LSG-T) identifies thick, high-grade core of Gold mineralization at 144 Gap Zone

Feb 24, '15 - NR

High-grade core identified over 250 metre vertical height, 75 - 100 metre width and 50 - 75 metre strike length, remains open for expansion (Key intercepts: 5.36 gpt/47.0 m, including 9.70 gpt/18.40 m, 4.09 gpt/56.9 m, including 13.94 gpt/5.4 m, 4.55 gpt/39.6 m, 7.09 gpt/19.9 m, 5.11 gpt/19.4 m and 4.42 gpt/21.1 m)

Drilling near northeast limit of 144 Gap Zone confirms and expands gold mineralization (Key intercepts: 5.72 gpt/10.5 m, 32.47 gpt/3.5 m, 10.61 gpt/5.3 m, 78.44 gpt/1.9 m, 5.26 gpt/ 10.3 m, 5.61 gpt/4.9 m, 3.80 gpt/20.1 m and 4.36 gpt/11.5 m)

Drilling continuing with 6 surface rigs, underground exploration drift in progress

Approximately 120,000 metres of surface and underground drilling planned in 2015.

Lake Shore Gold today announced results from an additional 10 drill holes and one wedge hole (11,092 metres) at the Company's 144 Exploration Area ("144"). 144 is located immediately southwest of the Timmins West Mine Thunder Creek Deposit and covers about 4.0 kilometres of the same volcanic/ultramafic, intrusive/sedimentary contact (the "TC-144 Trend") that hosts both Thunder Creek and Timmins Deposit. The current drill program, launched in August, is largely focused on the area immediately adjacent to Thunder Creek (the "144 Gap"), where a new discovery was announced in October 2014.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "Today's results confirm the presence of a significant area of thick, high-grade gold mineralization within the 144 Gap Zone. This high-grade core is open for continued expansion along strike, to the west and towards surface with additional drilling and has excellent potential for conversion to resources. The additional information provided from today's results further supports our view that the 144 Gap Zone is a very special area of mineralization and provides valuable information that is helping us to position our underground drill platform into the area. With six drills working on surface, our exploration drift advancing towards completion during the third quarter, and underground drilling expected to commence by mid-year, we are working towards establishing an initial resource at the 144 Gap Zone for the end of 2015."

Two holes and one wedge hole (Hwy-15-78, 84 and 74W1) tested near the current western limit of the 144 Gap Zone and 50 metres ("m") west of previously announced Hwy-14-48 (see press release dated October 21, 2014). These drill holes, in combination with at least five previously released holes, confirm a broad high-grade core to the mineralization between 725 and 975 m below surface and in close proximity to the planned elevation for the new exploration drift. The high-grade core is defined by multiple broad intersections within each hole grading between 4.0 and 7.0 grams per tonne ("gpt") and has current dimensions of 250 m in vertical height, 75 to 100 m in width and 50 to 75 m along strike. The high-grade core remains open for expansion along strike, to the west and towards surface. Significant new results include 4.09 gpt over 56.9 m, including 13.94 gpt over 5.4 m, and 4.42 gpt over 21.1 m, including 9.18 gpt over 4.1 m from Hwy-15-78 (similar elevation as Hwy-14-48).

Among additional results from drilling near the western limit of the 144 Gap Zone were 5.11 gpt over 19.4 m, including 36.44 gpt over 1.7 m, 3.03 gpt over 22.5 m and 5.36 gpt over 47.0 m, including 9.70 gpt over 18.40 m from Hwy-15-74W1. This hole tested the area approximately 50 m below Hwy-15-78. Hwy-15-84 tested the area 75 m above Hwy-15-78 and returned 4.55 gpt over 39.6 m, including 194 gpt over 0.3 m, 14.56 gpt over 2.0 m, 3.79 gpt over 11.8 m and 7.09 gpt over 19.9 m, including 62.0 gpt over 1.4 m.

Hwy-15-80 was located 50 m east and 75 m above previously released Hwy-14-48 and intersected 5.61 gpt over 3.1 m.

Three holes (Hwy-15-76, 79 and 83) tested near the current northeast limit of the 144 Gap Zone and close to recently reported Hwy-14-63 and Hwy-14-70 (see press release January 27, 2015). Among significant results were 5.72 gpt over 10.5 m, including 13.19 gpt over 3.9 m and 32.47 gpt over 3.5 m, including 112.25 gpt over 1.0 m in Hwy-15-76. This hole was drilled 50 m above Hwy-14-70. Hwy-15-79 tested 50 m to the west and at the same elevation as Hwy-14-70 and intersected 10.61 gpt over 5.30 m, including 33.45 gpt over 1.6 m, 3.80 gpt over 20.1 m and 4.36 gpt over 11.50 m. Hwy-15-83 tested 50 m below Hwy-15-79 and included results of 78.44 gpt over 1.9 m, including 292.00 gpt over 0.5 m, 3.86 gpt over 6.2 m, including 41.3 gpt over 0.3 m, 5.61 gpt over 4.9 m and 5.26 gpt over 10.3 m.

The remaining three holes and one wedge cut were drilled mainly as widely spaced steps along strike or above the 350 m long zone defined to date. Hwy-15-77 was drilled approximately 200 m west of Hwy-14-48 and Hwy-15-81 was drilled 50 metres to the east of Hwy-14-70. Both holes intersected favorable structure but lower grade assay values. Hwy-15-80a and Hwy-15-82 were stopped prior to reaching target depths due to drilling difficulties.

Recent interpretations continue to suggest that the mineralization at 144 Gap is contained within a broad zone of hydrothermal alteration and deformation measuring up to 100 m wide and closely associated with syenite intrusions, quartz veining, pyrite, scheelite and/or galena and multiple occurrences of visible gold. The new results identify the 144 Gap Zone over minimum dimensions of 350 m along strike and 350 m down dip with mineralization contained in a combination of wide bulk and narrow high-grade structures.

Qualified Person

The Qualified Person ("QP") for Lake Shore Gold's drill program at the 144 is Eric Kallio, Senior Vice-President Exploration, P.Geo. Mr. Kallio, as a QP, has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release. Mr. Kallio is an employee of Lake Shore Gold.

Quality Control

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than 10 grams per tonne gold, the sample is fire assayed with a gravimetric finish. Select zones with visible gold are tested by pulp metallic analysis. NQ size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security sealed bags for preparation at either ALS Canada Ltd. or Activation Laboratories. Preparation for ALS Canada Ltd. Is conducted at either Sudbury, ON, or Val d'Or, Quebec and the pulps are subsequently shipped to the ALS Minerals assay laboratory facility in Val d'Or, Quebec (or rarely in North Vancouver, B.C for fire assay. These ALS Minerals facilities are all registered ISO 9001-2008 (CERT-0051527). The Val d'Or assay laboratory is SCC ISO/IEC 17025:2005 Accredited (#689) and the North Vancouver, BC assay laboratory is also SCC ISO/IEC 17025:2005 Accredited (#579). All preparation and analysis for Activation Laboratories is completed at their facilities in Timmins, ON, which is ISO 9001 certified, and follows their Ancaster, ON, lab's corporate assaying procedures.

About Lake Shore Gold

Lake Shore Gold is a Canadian-based gold producer with operations based in the Timmins Gold Camp of Northern Ontario. The Company produces gold from two mines, Timmins West and Bell Creek, with material being delivered for processing to the Bell Creek Mill. In addition to current mining and milling operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

Table 1: List of Significant Composite Intervals From New Drilling

Highway 144 Project - Significant Assay Results
HoleDepth FromToIntervalGradeComments
Number(m) (m)(m)(m)(gpt)
HWY-15-74W11260
860m 876.80896.2019.405.112 sites VG
beyond wedgeincl.888.70890.401.7036.44
949.40971.9022.503.03VG
which incl.971.10971.900.8018.71
1004.201051.2047.005.362 sites VG
incl.1005.001023.4018.409.70
which incl.1005.001007.202.2032.81coarse VG
and1019.001023.404.4015.65
HWY-15-761373
812.50814.001.504.29
832.00842.5010.505.72
incl.835.00838.003.0013.19
937.50941.003.5032.47
incl.937.50938.501.00112.25VG
HWY-15-781158 823.40880.3056.904.09
incl.853.00856.603.6010.88
which incl.853.00854.001.0032.00
incl.863.70869.105.4013.94
which incl.863.70864.901.2027.48
which incl.866.60867.100.5040.50VG
885.50887.201.7013.29
incl.886.90887.200.3075.20VG
903.60905.101.504.26
950.50971.6021.104.42
incl.951.80952.400.6050.40
incl.966.00970.104.109.18
981.30984.001.207.11
989.50991.001.507.57
HWY-15-791338
868.00873.305.3010.61
incl.868.00869.601.6033.45VG
897.50917.6020.103.80
incl.906.70908.702.0010.64
incl.916.90917.600.7031.49
943.00954.5011.504.36
incl.945.50949.303.808.53
HWY-15-801148
909.40912.503.105.61
HWY-15-831224
891.60893.501.9078.44
incl.893.00893.500.50292.00
913.40919.606.203.86
incl.919.30919.600.3041.30
993.80998.704.905.61
incl.998.10998.700.6023.80
1002.001012.310.305.26
incl.1002.001003.001.0021.80
HWY-15-841086
782.80822.4039.604.55
incl.796.00796.500.5037.40VG
incl.806.40806.700.30194.00coarse VG
incl.814.60815.601.0015.85VG
841.30843.302.0014.56
incl.842.90843.300.4035.90
870.30882.1011.803.79
incl.877.90878.200.3034.50
886.40888.001.604.97
893.10895.702.605.76
909.80929.7019.907.09VG
incl.922.70924.101.4062.00VG
Notes:
1) Holes HWY-15-77 (1107m), and HWY-15-81 (1305m), returned lower-grade assay values.
2) Holes HWY-15-80A (97m), and HWY-15-82 (396m), were terminated prior to reaching their targets.
3) Assays are reported uncut.
4) True widths are not reported at this time.
To view "Figure 1. 144 Geology Plan - Location of New Drill Holes" please visit: http://media3.marketwire.com/docs/993638.pdf

To view "Figure 2: Cross Section – 144 Gap Geology Map" please visit: http://media3.marketwire.com/docs/Figure%202.%20144%20Gap%20Geology%20Plan.pdf

To view "Figure 3. 3D Visual 144 Gap Zone (Looking Northwest)" please visit: http://media3.marketwire.com/docs/Figure%203.%203D%20Visual%20144%20Gap%20Zone.pdf

Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298

Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext