We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Pastimes : Zenyatta Free Speech Board
ZEN 77.480.0%Nov 21 4:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Packfan1941 who wrote (2055)7/17/2015 11:57:39 AM
From: the Chief  Read Replies (1) of 22811
 
Drilling is not enough for veining. So we had to trench, trenches 12-15 feet wide, 15-20 feet deep , some as long as 100 feet and spaced every 50m to get an idea of how to quantify the structures. Drilling was a waste of money as it turns out. If you have a vein on surface and you angle drill an intersect it at 40m, thats not enough, you have to prove its a vein with depth. So trenching, lots of it.

What we will put out in next 2 months is a 43-101/PEA/PFS/BFS combined.

Costing for trucks, plant, equipment, Income from Marble, aggregate, graphite.
Building repair costs, tailings pond refurbishment to 2015 standards etc
CAPEX for entire project, which I am estimating at $15million total.
43-101 I am saying rolling resource of 15,000 tons concentrate and silently hope for 20K

West side..... 560,000 tons of concentrate. and I am sticking with those numbers.

IT ALL TAKES TIME....1.5-2 months to go.