SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (13615)8/18/2015 8:26:30 AM
From: Goose94Read Replies (1) of 202684
 
Arena Minerals (AN-V) Aug 18, '15 is pleased to announce that the Management Committee for the Company's Joint Venture with Japan Oil, Gas and Metals Corporation ("JOGMEC") on three blocks comprising 29,335 hectares of the Atacama copper project, collectively referred to as the Baquedano NE Project ("Baquedano"), has unanimously approved an exploration program for the first term of the option, to be completed prior to July 26, 2016. The following items are the primary components of the approved exploration program:

12,600 metres of drilling, covering the entire land package on approximately 1.5 km by 1.5 km centres

84 drill holes to an average depth of 150 metres

Preparatory work to commence immediately

Drilling to commence toward the last week of August or beginning of September 2015

Total of USD$2.7 million budget, to be funded by JOGMEC on a timely basis

Arena to operate the exploration program using its current staff and infrastructure, with the addition of some personnel and lodging

The exploration program is designed to drill the land package under option to JOGMEC (for further details please refer to press release dated July 15, 2015). The Arena-JOGMEC joint venture comprises ground that is mostly covered by variable thickness sand and gravel overburden. A program of systematic drilling on 1.5 km by 1.5 km centres was approved so as to ensure the highest probability of intersecting the alteration halo of typical porphyry hosted copper deposits. The spacing was determined using sizes and geometries typical of deposits in the area and, in particular, the known characteristics of the Spence and Sierra Gorda copper deposits.

Preliminary work was approved to commence immediately, and includes base line studies and the initiation of necessary permitting for certain components of the drill program. Drill contractor quotes have already been requested and approval for drilling commencing towards the end of August or beginning of September 2015 has been granted. Geological and support staff will be based out of the town of Baquedano, and will consist primarily of Arena's current exploration team, with the expected addition of another geologist and labourers. The team may be increased or reduced as the program is carried out.

The technical and scientific aspects of this news release have been reviewed and approved by Mr. Vernon Arseneau, P.Geo, who is a qualified person pursuant to NI 43-101. As the Vice President of Exploration of the Company, Mr. Arseneau is not considered independent.

About Arena Minerals

Arena Minerals is a prospect generator that has two properties under option covering approximately 153,000 hectares within the Antofagasta region of Chile. The properties are at low altitudes, within producing mining camps in infrastructure rich areas. The Company's flagship asset is the Atacama Copper Property, consisting of 149,235 hectares of essentially undrilled ground in the heart of Chile's premier copper mining district. Currently, approximately 40% of the Atacama Copper Property is under option to third parties. Pursuant to an option agreement entered into between the parties B2Gold Corp and Japan Oil, Gas and Minerals National Corporation each have the right to earn into 20% of the land holdings within the property, representing a total of 40% of the land holdings. Collectively, B2 Gold and JOGMEC are to spend over US$36 million in exploration expenditures, amongst certain other commitments, to earn into 60% of the respective claims blocks. In addition the Company has the Pampas El Peñon project, comprising a total of 3,400 hectares which is less than 1 km from Yamana's Agusta Victoria project which forms part of the El Peñon mine complex. The Pampas El Peñon and Atacama Copper Property properties comprise Arena Minerals highly prospective copper and gold properties within an active mining region.

To view the website, please visit www.arenaminerals.com.

In addition to featuring information regarding the Company, its managements and projects, the website also contains the latest corporate news and an email registration allowing subscribers to receive news and updates directly.

On behalf of the Board of Directors of Arena Minerals Inc.

William Randall, President, and CEO

Arena Minerals Inc.
William Randall
(416) 309-2697
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext