SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : CCB vs ZEN truth board
ZEN.V 1.190-1.7%Jan 16 3:58 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: the Chief2/16/2016 9:53:43 AM
Read Replies (2) of 12350
 
Message 30459698

Clear up some bashing points
Poor recovery and float was improper grinding - fixed



That is wrong and has been wrong since a fellow reported that on TCC and I bet him a bottle of Scotch. So you are just repeating his rumor. If true it would be material info and released.


Scope of the Met work for the NOHFC grant - was to produce a flow sheet that would work for OTHER graphite producers not just Zen. - Completed.


No, a flow sheet is to work on all parts of the deposit and is not complete, in fact far from it.

read the scope of the work before commenting


I have and you haven't

Zen has produced a ENGINEERED flow sheet from which a SCALED up plant can be built. - Done (sorry chief but their not going to build this plant for you just because you want them too...Engineering is done....CCB has no engineered flow sheet so more cost to them to do so.


Wrong again. A Full up scaled engineered pilot plant must be done as part of PFS( if not done prior to PEA) or the PFS is not complete. It is not completed and in fact not even started. CCB has baselined their flow sheet and has used the same one since day one. Only the final purification stage has changed. Final Flow sheet is baselined in PEA.

I think that the caustic bake will not be included in ZEN's final production flow sheet. HCL will only be used to purify the graphite tossing caustic bake cutting down the CAPAX.
I see, so now you are saying as I am saying the flow sheet is not baselined. Do you see how you speak out of two sides of your face? In one breath you say the flow sheet is completed and a Pilot is not needed. Then say you intend on changing the Flow sheet before PFS. So now you have to start amending the entire PEA to reflect the new costing. I agree with that, thats exactly why you are banned, you can't even figure things out when you say them yourself.


So now you know why ZEN has not started their PFS.... once again MET Problems. Which means they are having to once again change their flow sheet, just as ftn has let slip. So instead of a PFS you must redo your PEA. Nicely pointed out formerTN, too bad you could not put the final pieces together lol
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext