We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : ECHARTERS

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Bill Jackson who wrote (2110)1/2/1998 8:35:00 PM
From: E. Charters  Read Replies (1) of 3744
 
I would say that rock is usually crushed at 80% passing 160 mesh as in Kirkland Lake to 80% passing 300 mesh as the most usual. This usually takes one horsepower day per ton. So a 1000 horsepower mill about 12 feet in diameter and 12 feet long should reduce a medium silicate ore from pea gravel to 200 mesh at a rate of one ton per horsepower day. Ergo 1000 tons in one day. That is the use of 18,000
kilowatt hours in one day which should cost you $2,700.00 If you generate by diesel you can make that $5,400.00 per day. (your fuel is only 18 cents a KWH but maintenance and capital and fuel transport) is the other 12 cents.)40 hp diesel= 1 gallon per hour.=24 hp electric = 18 KWH = 18 cents per KWH in Toronto plus other costs.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext