Highway 50 Gold (HWY-V) no luvin'... Yes goose do do...
NR - June 21, '17 Highway 50 Gold Corp. has discovered a significant lead-zinc-albite alteration zone in the deepening of drill hole HWY-16-01 at the Monroe project located in southeastern British Columbia. Although no economic or subeconomic mineralization was encountered, management believes the lead-zinc discovered in HWY-16-01 is conclusive evidence that a lead-zinc mineralizing event was active at Monroe on or about the same stratigraphic time as the Sullivan orebody.
Drill-hole HWY-16-01 was cased to 815 metres. Upon re-entry, the hole was drilled to a final depth of 1,079 metres. The hole intermittently intersected a 170 metre thick interval of moderate to intense albite alteration with attendant sphalerite and galena mineralization as disseminations, replacements and veinlets. This zone occurs within a horsted (uplifted) block and, as such, may represent an alteration front related to stratiform lead-zinc-silver mineralization located in an adjacent graben (down-dropped) block.
As previously reported, HWY-17-03 drilled a graben infill similar to the Sullivan hanging wall sequence including 40 metres of argillaceous mudstone with abundant pyrrhotite laminations immediately underlain by 6 metres of albitized fragmental. This alteration was subsequently underlain by a zone containing sphalerite and galena in tension cracks and veinlets over 40 metres. The hole was deepened to 918 metres ending in the top of the footwall quartzites, providing a stratigraphic tie.
Drillhole HWY-17-04 is planned as a step-out from HWY-16-01 at the same site, to be drilled in a north-westerly direction. The intention is to obtain a pierce-point approximately 400 metres to the north-west of HWY-16-01. The Company also plans to deepen HWY-16-02 in the upcoming program. Now that significant lead-zinc mineralization has been identified on the project, follow-up drilling will systematically step-out in search of zones with economic grades.
The Company has an option to earn a 50% interest in the Monroe property by spending annual optional exploration expenditures totaling $3,000,000 over the next four years. The Company has spent $500,000 on the project over the last year.
The scientific and technical disclosure in this news release has been approved by Gordon P. Leask, P.Eng., President and CEO of the Company, and a Qualified Person as defined by National Instrument 43-101 (Standards of Disclosure for Mineral Projects).
About Highway 50 Gold Corp.
Highway 50 Gold Corp. is a mineral exploration stage company led by a team of experienced explorers and deal-makers. The Company is executing an exploration plan refined over 25 years of experience in Nevada and the Aldridge Formation of southeastern B.C. The exploration focus on its projects are a result of what management believes to be breakthroughs in the understanding of north-central Nevada's crustal architecture and new geological understanding on the Monroe property in B.C.
For additional information:
Gordon P. Leask, P.Eng. or John M. Leask, P.Eng. Tel: 604.681.4462 Email: gord@highway50gold.com or jml@highway50gold.com, |