We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Medinah Mining Inc. (MDHM)
MDMN 0.00010000.0%Nov 21 9:30 AM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Mike Gold who wrote (796)1/9/1998 3:05:00 PM
From: rulm  Read Replies (2) of 25548
 
Mike,

Answers to your question-- bear in mind that these are absolute minimum values to production levels and the nature of the properties will dictate the levels.

a. The high-grade mill will initially produce at 100 T/day contingent on grade. Should reserves and/or grade change significantly, the Company will proportionately increase output, either through addition or upgrade.
b. The placer mill(s) can be piggy-backed to handle up to 1000T/day, but we anticpate initial output of 1000 cubic metres per day. Breaking down recovery, 60% of the gravels will be free-milling with the remainder(approx. 36%) of the recovery through vat leaching and/or flotation. It is key to point out the 96% recovery figure as well as the fact that our mills will be able to produce at a very maximum of USD$125.per ounce. The 1000 cubic metre figure will be for test runs to determine recovery and grade figures at which time we will upgrade the output.