We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : KPY - Carpatsky Petroleum

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Colin Cody who wrote (1)1/15/1998 5:51:00 PM
From: Colin Cody  Read Replies (1) of 10
 
The following chart is a summary of activity in the Rudovsko-Krasnozasvodsky field as of January 14, 1998. Carpatsky initially has a 50 percent working interest and a 40 percent net revenue interest in the field.
.
--------------------------------------------------------------
PROPOSED DEPTH ON
WELL TD JAN. 14 OPERATION
--------------------------------------------------------------
#102 5792 meters 5792 meters Waiting on See details
completion below
--------------------------------------------------------------
#104 5800 meters 5252 meters Waiting on
Barite
--------------------------------------------------------------
#106 5150 meters 5150 meters Waiting - See details
5 - 1/2" below
casing
--------------------------------------------------------------
#109 5200 meters 4576 meters Drilling
ahead
--------------------------------------------------------------
#111 5200 meters 4393 meters Drilling
ahead
--------------------------------------------------------------
#100K 5500 meters 0 Waiting on
orders to spud
--------------------------------------------------------------
.
Well No. 106 has been drilled to a total depth of 5150 meters and 5 1/2 inch casing was set and cemented through the major B-22 reservoir. A further 2,500 meters of 5 1/2 inch pipe is needed to tie it back to the surface. Electric logs indicate 117 feet (34.87 meters) of net, effective pay zone. That same zone in the adjacent offset well (No. 103) located about 2200 feet to the north, is 38.7 feet thick and initially produced at a rate of 6.8 million cubic feet per day and 120 barrels of condensate per day. In the offsetting well to the south (No. 4) that zone has 135 feet of net pay and initially produced at a rate of 12.8 million cubic feet of gas per day and 240 barrels of condensate per day.
.
Well No. 102 has been drilled and cased to a total depth of 5792 meters (19,002 feet) and is the deepest well to be completed in the T-3 horizon in the field. The T-3 reservoir in an adjacent well (No. 2), located about 2500 feet to the south, produced 38.8 million cubic feet of dry gas per day when tested from a 9.8 foot interval. Electric logs indicate that Carpatsky's No. 102 has 115 feet of net pay from that same reservoir.
.
In the Bitkov oil field, Carpatsky's second area of operations, the company has two oil wells producing 63 barrels of oil and approximately 300 mcf of associated gas per day. Two additional producing wells are temporarily shut in and are awaiting the repair of production facilities and a gas lift supply line, and two other recently perforated wells will be put on production as weather permits.