In case you missed it yesterday, here's the press release
DIAMOND DRILL HOLES TW97 - 4 & 5 YIELD 445 METRES OF 1.78 g/t AND 428.2 METRES OF 1.28 g/t GOLD RESPECTIVELY.
SAKIMA PROJECT - TWANGIZA DIAMOND DRILL PROGRAM.
TORONTO, Jan. 14 /CNW/ - The Company is pleased to announce the assay results from the fourth and fifth diamond drill holes at the Twangiza Deposit located in Kivu Province in the eastern regions of The Democratic Republic of The Congo. Drill hole TW97-4 returned 1.78 g/t Au over 445 metres and TW97-5 returned 1.28 g/t Au over 428.2 metres (cut to 30 g/t). ''Clearly our assay results to date are most encouraging. It is important to note that depth and width extents for an initial resource calculation of 4,000,000 ounces were based on 175 metres and 200 metres respectively. Our 1997 drill campaign has increased the depth extent to 350 metres and the width extent to 275 metres. Twangiza remains open along strike and at depth,'' reports Bernard van Rooyen, President & CEO of Banro. ''A total of 9 holes covering 4,488 metres had been drilled prior to Christmas shutdown, and work has resumed on site under the continuing direction of CME & Company. Holes six thru nine have been transported to the lab and we will report the assay results as they come due,'' concludes van Rooyen. TW97-4 was drilled at a -55 degree angle along the fold axis and across the plunge of the known deposit to a depth of 577 metres. This hole was collared approximately 140 metres north and along strike of TW97-1 (ref: press release of November 10, 1997). TW97-5 was drilled at right angles to TW97-4 in a westerly direction across the deposit at a -50 degree angle to a depth of 603 metres and was collared approximately 310 metres north of TW97-3 and 370 metres northeast of TW97-4 (ref: press release of December 04, 1997).
---------------------------------------------------------------------- Drill Hole From To (m) Length Length Au Au (m) (m) (ft) (g/t) (oz/t) ---------------------------------------------------------------------- Gold - cut to 30 g/t ---------------------------------------------------------------------- TW97-4 0.00 445.00 445.00 1356.36 1.78 0.052 Including 0.00 125.00 125.00 381.00 2.82 0.082 and 149.00 185.00 36.00 109.73 1.30 0.038 and 217.00 255.00 38.00 115.82 2.73 0.080 and 295.00 323.75 28.75 87.63 1.96 0.057 and 351.00 379.83 28.83 87.87 1.41 0.041 and 409.00 445.00 36.00 109.73 2.21 0.064 ---------------------------------------------------------------------- TW97-5 0.80 429.00 428.20 1305.15 1.28 0.037 Including 0.80 166.00 165.20 503.53 1.52 0.044 and 212.00 280.00 68.00 207.26 1.94 0.057 and 291.00 322.00 31.00 94.49 1.07 0.031 and 396.00 429.00 60.00 182.88 1.46 0.043 and 540.00 545.75 5.75 17.53 4.67 0.136 ----------------------------------------------------------------------
Banro Resource Corporation is a gold exploration and development company with 47 mining concessions encompassing an area of 10,271 square kilometers in the Democratic Republic of The Congo. Banro's common stock is quoted on the Canadian Dealing Network (CDN), under the symbol ''BNRS''. The Company has 13,451,218 common shares issued and outstanding.
For further information: on Banro, please visit our Web Site at banro.com or contact: A.T. Kondrat, Co-Chairman; Michael Nikiforuk, Vice-President, Director; Cliff Jones; Investor Relations; Phone: (416) 366-2221, Fax: (416) 366-7722, From outside Toronto, call toll-free: 1-800-714-7938 |