SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Goose94 who wrote (50252)11/20/2018 2:01:05 PM
From: Goose94Read Replies (1) of 202193
 
Highway 50 Gold (HWY-V) Nov 20, '18 has completed the 2018 drill campaigns at its 50-per-cent-owned Monroe project, located in southeastern British Columbia. The most recently executed drill program initiated in September 2018 was designed to test and offset the lead/zinc mineralization encountered in DDH HWY-18-008. Drill hole HWY-18-009 was collared from the same drill pad as HWY-18-008 and was lost at a depth of 443 meters, failing to reach the target depth. An alternate hole was collared nearby and was drilled to a depth of 980 metres. Drilling encountered 12 metres of intense albite alteration similar to that seen in HWY-18-00 8 before bottoming in a large gabbro dyke. This intercept extends the albite zone a distance of 200 metres to the west of the albite encountered in HWY-18-008. Upon encountering the unexpected dyke, management decided to terminate the hole as the target horizon would be missed. A third attempt to drill the host stratigraphy from an alternate location 600 metres east of HWY- 18-009 resulted in the loss of DDH HWY-18-010 at a depth of 422 metres.

Although no holes were completed to the mineralized interval due to in ground drilling conditions, management has gained a significant understanding of the lead/zinc system and the relationship of the mineralization stratigraphically. It has been determined that all of the lead/zinc encountered to date occurs within the Sullivan Mine stratigraphic sequence. Further drilling is required to evaluate the lead/zinc mineralized third order sub-basin. The volume of intense alteration and the widespread distribution of lead-zinc mineralization suggests a system of significant strength. To date, no drill hole has tested what management now believes is the center of the vent system. Drilling is anticipated to restart in the Spring of 2019 after further financing is secured.

The scientific and technical disclosure in this news release has been approved by Gordon P. Leask, P.Eng., President and CEO of the Company, and a Qualified Person as defined by National Instrument 43-101 (Standards of Disclosure for Mineral Projects).

For additional information:


Gordon P. Leask, P.Eng. or John M. Leask, P.Eng.
Tel: 604.681.4462
Email: gord@highway50gold.com or jml@highway50gold.com

About Highway 50 Gold Corp.

Highway 50 Gold Corp. is a mineral exploration stage company led by a team of experienced explorers and deal-makers. The Company is executing an exploration plan refined over 25 years of experience in Nevada and the Aldridge Formation of southeastern B.C. The exploration focus on its projects are a result of what management believes to be breakthroughs in the understanding of north-central Nevada's crustal architecture and new geological understanding on the Monroe property in B.C.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext