SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Canadian Political Free-for-All

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: gg cox who wrote (19459)4/20/2019 10:21:27 AM
From: Alastair McIntosh  Read Replies (1) of 37410
 
What we know
The investigation team has established the following facts based on its information-gathering work:
A loss of control of the train occurred.
The train had been stopped with the air brakes applied in emergency at Partridge, the last station prior to the entrance to the Upper Spiral Tunnel.
A change of crews had occurred at this location as the previous crew were closing in on their maximum hours of service.
This seems to verify what I posted earlier. It was not initially a crew change stop. It was an emergency stop by the original crew resulting from a loss of control of the train.

Message 32023670
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext