SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Harken Energy Corporation (HEC)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Rod Copeland who wrote (2368)1/21/1998 3:17:00 PM
From: Ditchdigger  Read Replies (2) of 5504
 
(Estero#1)Rochester Minerals Inc. ("Rochester") announced today that the production testing
of the Estero #1 well has been completed. This well, located on the Palo Blanco
Prospect in the Llanos Basin of Colombia has been drilled to the planned depth of the
upper cretaceous sands. Rochester has a 25% beneficial interest in the Estero #1,
prior to Ecopetrol participation.

The well has been evaluated with a series of electric logs which indicated potential
pay zones in the Mirador, Guadalupe and Ubaque formations. In initial production
testing of the Ubaque formation, the well produced with an electric submersible pump
at a rate of 4116 BOPD. The production rate was limited by the capacity of the
submersible pump and the surface storage facilities. The Mirador and Guadalupe
formations have not yet been tested.


Estero #1 Log
Analysis
Test Parameter and Production
Test Results

Gross Productive Formation Thickness (Ubaque only) 40 Feet
Net Productive Formation Thickness (Ubaque only) 40 Feet
Porosity 25%
Oil Saturation 75%
Oil Gravity 16.4
Production Rate Ubaque Formation 4116 BOPD
Production Rate Mirador & Guadalupe Formations Note (1)
Field Development Wells Required Note (2)

(1): The Companies plan to produce only from the Ubaque formation at the present
time; therefore, the production testing for the Mirador and Guadalupe formations will
be postponed until further data has been analyzed. The Estero #1 well is located in
close proximity to existing pipeline and road infrastructure which should accelerate
start-up of production.

(2): The Companies have already identified two additional well locations and will
shortly file for drilling permits with the Environmental Ministry. Additionally, the
operator, Harken Energy Corporation will soon be applying to Ecopetrol, the
Colombian state oil company, for an extended production test and sales period.

The Companies have also identified through seismic analysis three additional
structures on the Alcaravan block similar to the Palo Blanco prospect. Rochester is
optimistic about the potential of these other features in light of the success at the
Estero #1. The drilling of these features will likely commence in early 1998.
DD
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext