SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Core Gold Inc

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: pstad601/7/2020 11:21:31 PM
   of 2131
 
Core Gold Announces Drilling Results From 3 Diamond Drill Holes at the Cerro Verde Target Area of the Dynasty Goldfield Project

January 07, 2020 08:00 ET | Source: Core Gold Inc.


photo-release


Figure 1


Drill Hole Location Map of Holes CDH-100, CDH-101 and CDH-102
Core Gold Inc.

Figure 2


Diamond Drill Hole CDH-100
Core Gold Inc.

Figure 3


Diamond Drill Hole CDH-101
Core Gold Inc.

Figure 4


Diamond Drill Hole CDH-102
Core Gold Inc.

VANCOUVER, British Columbia, Jan. 07, 2020 (GLOBE NEWSWIRE) -- Core Gold Inc. ("Core Gold" or the "Company") (TSX-V: CGLD, OTCQX: CGLDF) is pleased to provide an update on its 100%-owned Dynasty Goldfield Project (“Dynasty Goldfield” or the “Project”) located in the province of Loja in Southern Ecuador. As previously announced by the Company on September 9, 2019, Core Gold renewed exploration efforts on the Dynasty Goldfield Project, specifically drilling in the Cerro Verde Target area (“Cerro Verde”) with future plans to expand over the adjacent Dynasty Goldfield targets.

Highlights*:

• Hole CDH-100 - Iguana Vein:5.70m @ 3.43 g/t Au ; 38 g/t Ag
(True width: 3.89m)
• Hole CDH-101 - Foto Vein:
1.95m @ 3.56 g/t Au; 34 g/t Ag,
(True width: 0.92m)
- Hydrothermal Breccia:25.68 @ 1.01 g/t Au; 9 g/t Ag
(True width: n/a**)
• Hole CDH-102 - Brecha Vein:
6.15m @ 4.13 g/t Au; 13 g/t Ag,
(True width: 3.89m)
- Comanche Vein:9.31m @ 2.31 g/t Au; 14 g/t Ag
(True width: 9.11m)
* Intervals correspond to drilled vein intervals; but figures (2 to 4) show the true widths of structures.

** Note: True width not applicable as the shape of this mineralized breccia body is unknown.

In the 2019 drilling campaign, 3,850 metres (m) of shallow near-surface diamond core holes (37) were completed, primarily directed for mine planning in Cerro Verde target with depths ranging from 26.4m to 200.65m. Three drill holes (CDH-100, CDH-101, CDH-102 – see Table 1 and Figures 1 to 4) within Cerro Verde were designed to extend previously identified mineralization in the Cerro Verde. Samples from these three holes were assayed by a certified, independent lab (Bureau Veritas - Inspectorate) to provide certified assaying. All 3 holes successfully intercepted mineralized structures at Cerro Verde Prospect showing open mineralization to the northeast-southwest direction and at depth.

Comprehensive exploration drilling and geochemical sampling has been restricted due to the Company’s limited financial resources. Mineralized intervals from 15 additional holes completed in 2019 have been sent to an independent lab for certified assaying and are expected in early Q1 2020.

“Shallow drilling has been executed to both, facilitate ongoing mine planning and extend and identify new mineralized targets. Drill holes CDH-100, CDH-101 and CDH-102 were targeted to extend mineralization down dip and test veins over 2km of the Cerro Verde prospect. Drill hole CDH-101 extended the Foto Vein 60m beneath the present mine level and confirmed the occurrence of a deeper hydrothermal breccia zone previously identified in CV19-28. Drilling was terminated in mineralization at 120.68m with the last two sample intervals assaying 6.69 g/t and 3.23 g/t gold. Dynasty Goldfield has obtained positive results in this year’s program. Plans and budget for the 2020 exploration drilling at Dynasty Goldfield have not been finalized,” said Mark Bailey, CEO and Director of Core Gold.

Overview of Cerro Verde

Located at the western extent of the 9km long zone of veining at Dynasty Goldfield, Cerro Verde is a 1.8km by 1.8km drilled vein array with high grade quartz hosted gold & silver mineralization associated with localized stockwork, breccia, and disseminated style gold mineralization proximal to veining, which remains open along strike to the east and southwest. Current mining from the Dynasty Goldfield Project is focused on a small portion of the Cerro Verde area with this small-scale open-pit production from the Cerro Verde area.

Drilling at Cerro Verde

The following Table 1 indicates the assay intervals from holes CDH-100, CDH-101, CDH-102:

Drill HoleVeinFrom (m)To (m)Inclined Width (m)True Width (m)Au Grade (g/t)Ag Grade (g/t)
CDH-100Iguana Vein111.90117.605.703.893.4338
including111.90113.101.200.825.4727
113.10114.251.150.781.3117
114.25115.501.250.854.7595
116.20117.601.400.953.7931
CDH-101Foto Vein82.5884.531.950.923.5634
including82.5883.530.950.455.5249
83.5384.531.000.471.6920
Breccia Zone*95.00120.6825.68n/a1.019
including104.75105.550.80n/a1.271
109.15110.221.07n/a2.6010
110.22111.681.46n/a2.2660
115.00116.301.30n/a4.3533
116.30117.681.38n/a2.5040
119.18119.930.75n/a6.695
119.93120.680.75n/a3.235
CDH-100Brecha Vein51.1157.266.153.894.1313
including53.7355.762.031.3811.7016
Comanche Vein97.07106.389.319.112.3114
including99.0199.460.450.441.024
99.46101.091.631.596.9016
101.09102.651.561.533.2737
102.65104.381.731.691.5712
Table 1 Assay Results from Diamond Drill Holes at Cerro Verde at Dynasty Goldfield
*Note: True width not applicable as the shape of this mineralized breccia body is unknown.

Overview of Dynasty Goldfield

The Dynasty Goldfield Project covers an area of 13,909 hectares within 5 mining concessions. According to the NI 43-101 report from Maynard A. (2018), the project area hosts 201 historical drill holes totaling 26,734 m of diamond core drilling (excluding the 2019 drill campaign of 37 holes for 3,850 m). Historical drilling was completed on variable spacing extending over 9 km of mineralized strike as mapped and defined from surface soil, rock chip and channel sampling work completed from 2004 through 2007 by Dynasty Metals & Mining. In early 2017 the Company completed a name change to Core Gold Inc. and commenced small-scale production at the Dynasty Goldfield Project.

The Dynasty Goldfield Project is part of the larger Dynasty copper-gold belt extending north from Peru. The Dynasty copper gold belt lies within the compressional Inter-Andean Graben that is bounded by regional scale faults. The graben is composed of thick Oligocene to Miocene volcano-sedimentary sequences that cover the Chaucha, Amotape and Guamote terrains. This structural zone hosts several significant epithermal, porphyry, mesothermal, S type granitoid, VHMS and ultramafic/ophiolite precious metal and base metal mineral deposits.

The western side of the Dynasty concessions include volcanic rocks (breccias and andesitic lavas) belonging to the Cretaceous to Palaeocene Pisayambo Volcanics and Celica Formation which has been intruded locally by dioritic rocks and mesothermal-epithermal gold bearing quartz veins and veinlets with occasional calcite-barite veins to the south, southeast and west. As many as 110 mineralized veins of varying thicknesses and without preferred orientation have been identified at the Dynasty Goldfield.

The mineralized veins in the volcanics mainly occur along a faulted zone near and sub-parallel to the contact with the Cretaceous Tangula Batholith outcropping to the east and south of the concessions.

Photos accompanying this announcement are available at:

globenewswire.com

globenewswire.com

globenewswire.com

globenewswire.com

Quality Assurance and Quality Control (QA & QC)

The drilling program for 2019 was designed to intersect the mineralized structures mapped on surface, with the objective to understand the mineralization at depth. QA & QC procedures and protocols have been implemented by a certified lab to secure accuracy for these drill holes. Core samples have been shipped to Bureau Veritas Mineral Lab (Inspectorate) in Peru a certified international qualified laboratory as complying with ISO 9001:2008 (Certificate FS 34143). Fifty grams fire assay for gold (FA350-Au) and a Multi-Acid digestion ICP-ES for a package of 23 elements (4A370) were also exceuted.

Qualified Person

Mr. John E. Bolanos, who is a qualified person under NI 43-101 regulations, has reviewed and approved the technical content of this news release. Mr. Bolanos is a technical consultant to the Company, with a M.Sc. Mining Geologist (U.K.) and a Professional Geologist Eng. from The Central University of Ecuador (honours degree). He is a registered member of the Society for Mining, Metallurgy & Exploration (SME) of the United States; Director of the Ecuadorian College of Engineers in Geology, Mines, Oil and Environment; and a member of the Mining Chamber of Ecuador. He has 29 years of experience in the exploration and mining industry throughout the Americas.

About Core Gold Inc.

The Company is a Canadian based mining company involved in the mining, exploration and development of mineral properties in Ecuador. The Company is currently focused on gold production at its wholly-owned Dynasty Goldfield Project. Mineral is treated at the Company’s wholly-owned Portovelo treatment plant. The Company also owns other significant gold exploration projects including the Linderos and Copper Duke area in southern Ecuador all of which are on the main Peruvian Andean gold-copper belt extending into Ecuador.

For further information please contact:

Mr. Mark Bailey, CEO, Director
Suite 1201 – 1166 Alberni Street
Vancouver, B.C. V6E 3Z3
Phone: +1 (604) 345-4822
Email: info@coregoldinc.com

Source :

globenewswire.com
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext