SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : CDN gold shares: Anaconda mining merging w/Maritime Resource

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: Internship1/8/2021 3:28:25 PM
   of 43
 
Anaconda mining starts 2021 with a triple homerun ; have you read the NEWS & seen the maps?

Jan 7, 2021
Anaconda Mining Further Consolidates and Expands the Tilt Cove Gold Project in Newfoundland and Provides Exploration Update
anacondamining.com
Highlights of the expanded area of the Tilt Cove Project include:

A highly prospective, road accessible mineral property with 17 significant gold and copper occurrences;190 of 1,416 Historic* rock grab and float samples** grading between 0.5 and 152.6 grams per tonne ("g/t") gold, including 79 rock grab and float samples grading between 5.0 and 152.6 g/t gold;Underlain by the Betts Cove Complex geology, which hosts the nearby, past producing, high-grade Nugget Pond Mine, as well as the Tilt Cove and Betts Cove Copper Mines;Adjacent to the Green Bay Fault, part of the Long-Range Fault System, a first order structure proximal and genetically linked to numerous gold deposits including the high-grade Nugget Pond and Hammerdown Mines (Exhibit B)."We are excited to have completed such a significant expansion of the Tilt Cove Gold Project, which provides the Company with an additional 14 kilometres of continued strike length, in a highly-prospective mineral property, encompassing the same geological trend as the past producing, high-grade, Nugget Pond Mine which had an average recovered grade of 9.85 grams per tonne gold. T

Jan 6, 2021
Anaconda Mining Initiates Drill Program at Lower Seal Harbour in Nova Scotia, Located 1.6 KM From Its Goldboro Gold Project

Selected composited highlights from the Drill Program include:

871.23 g/t gold over 0.5 metres (52.9 to 53.4 metres) and 47.87 g/t gold over 1.5 metres (63.1 to 64.6 metres) in hole BR-20-193;20.08 g/t gold over 2.4 metres (50.6 to 53.0 metres) including 74.40 g/t gold over 0.6 metres in hole BR-20-195;4.73 g/t gold over 4.5 metres (100.0 to 104.5 metres) including 20.10 g/t gold over 1.0 metre in hole BR-20-200;3.41 g/t gold over 3.2 metres (91.8 to 95.0 metres) in hole BR-20-185;1.11 g/t gold over 7.0 metres (44.0 to 51.0 metres) in hole BR-20-187;3.17 g/t gold over 6.1 metres (114.9 to 121.0 metres) including 18.10 g/t gold over 0.7 metres in hole BR-20-215; and0.55 g/t gold over 17.9 metres (23.1 to 41.0 metres) in hole BR-20-205.A table of selected composite intersections from the Drill Program are shown in Table 1 below.

"The infill drill results from East Goldbrook show very high-grade intercepts locally as well as broader zones of lower grade mineralization, all at levels that could conceptually be mined through open pit mining methods. Of particular interest in this round of drilling is the consistency of spectacular grades from East Goldbrook indicating there may be specific opportunities for further high-grade resource growth since this zone remains open for expansion down plunge. We will use the new data gathered in this round of infill drilling to upgrade mineral resources to the Measured and Indicated categories at East Goldbrook as part of the fully updated resource estimate anticipated in the first quarter of 2021."

Jan 5, 2021
Anaconda Mining Reports Further Near Surface Infill Drill Results at Goldboro, Including 871.23 g/t Gold over 0.5 metres, 47.87 g/t Gold over 1.5 metres and 20.08 g/t Gold over 2.4 metres

Selected composited highlights from the Drill Program include:

871.23 g/t gold over 0.5 metres (52.9 to 53.4 metres) and 47.87 g/t gold over 1.5 metres (63.1 to 64.6 metres) in hole BR-20-193;20.08 g/t gold over 2.4 metres (50.6 to 53.0 metres) including 74.40 g/t gold over 0.6 metres in hole BR-20-195;4.73 g/t gold over 4.5 metres (100.0 to 104.5 metres) including 20.10 g/t gold over 1.0 metre in hole BR-20-200;3.41 g/t gold over 3.2 metres (91.8 to 95.0 metres) in hole BR-20-185;1.11 g/t gold over 7.0 metres (44.0 to 51.0 metres) in hole BR-20-187;3.17 g/t gold over 6.1 metres (114.9 to 121.0 metres) including 18.10 g/t gold over 0.7 metres in hole BR-20-215; and0.55 g/t gold over 17.9 metres (23.1 to 41.0 metres) in hole BR-20-205.

Table 1. Selected Composite Highlights Within This News Release From The Drill Program.

Hole ID

From (m)

To (m)

Interval (m)

Gold (g/t)

Visible Gold (VG)

BR-20-184

29.2

30.7

1.5

1.12

BR-20-185

24.6

25.6

1.0

1.00

and

43.0

46.0

3.0

1.41

and

75.0

76.0

1.0

1.32

and

83.8

85.2

1.4

3.26

VG

and

91.8

95.0

3.2

3.41

BR-20-187

22.5

23.5

1.0

1.00

and

27.0

27.5

0.5

2.45

and

44.0

51.0

7.0

1.11

BR-20-188

84.0

84.5

0.5

2.41

and

92.5

93.0

0.5

3.66

BR-20-189

56.0

57.0

1.0

11.50

BR-20-190

60.9

61.4

0.5

2.16

BR-20-191

99.7

100.7

1.0

2.17

and

111.6

112.1

0.5

10.20

and

125.8

126.3

0.5

0.51

VG

and

134.6

136.1

1.5

1.27

and

142.0

145.1

3.1

0.73

BR-20-192

59.9

60.5

0.6

4.74

BR-20-193

43.5

44.0

0.5

0.81

VG

and

52.9

53.4

0.5

871.23

VG

and

63.1

64.6

1.5

47.87

VG

including

63.6

64.6

1.0

62.90

and

73.8

74.8

1.0

1.48

and

80.8

83.8

3.0

3.58

BR-20-194

50.5

51.0

0.5

1.18

VG

and

73.7

74.2

0.5

2.51

and

104.0

105.1

1.1

0.89

and

111.9

115.0

3.1

1.59

VG

including

112.5

113.0

0.5

4.88

VG

and

128.0

130.3

2.3

0.75

BR-20-195

40.0

42.0

2.0

3.14

and

50.6

53.0

2.4

20.08

including

50.6

51.2

0.6

74.40

BR-20-196

87.2

88.1

0.9

2.44

and

93.9

96.6

2.7

2.23

BR-20-197

118.5

122.0

3.5

1.42

and

130.5

133.0

2.5

4.26

including

130.5

131.0

0.5

18.70

BR-20-198

79.8

80.4

0.6

5.60

VG

BR-20-199

51.5

52.1

0.6

0.95

BR-20-200

80.0

82.0

2.0

1.00

and

100.0

104.5

4.5

4.73

including

100.0

101.0

1.0

20.10

BR-20-201

29.2

30.2

1.0

3.92

and

62.2

62.7

0.5

2.00

and

88.6

91.8

3.2

1.22

VG

and

98.0

100.5

2.5

0.82

and

108.0

111.7

3.7

0.68

VG

including

108.0

108.5

0.5

2.41

VG

BR-20-202

119.0

119.5

0.5

1.51

BR-20-203

74.0

75.0

1.0

0.88

BR-20-204

82.0

83.0

1.0

0.74

and

137.0

138.0

1.0

2.99

BR-20-205

23.1

41.0

17.9

0.55

including

23.1

26.3

3.2

0.78

including

30.3

33.0

2.7

0.84

including

37.0

38.5

1.5

1.17

including

40.0

40.5

0.5

1.61

and

47.0

47.5

0.5

1.77

and

63.9

64.4

0.5

4.10

BR-20-208

26.9

29.2

2.3

1.82

and

36.0

39.5

3.5

0.78

and

60.8

62.5

1.7

0.71

and

75.6

76.1

0.5

4.31

BR-20-212

153.0

154.0

1.0

10.90

BR-20-215

75.0

75.7

0.7

2.24

and

84.0

84.7

0.7

3.33

and

104.0

106.0

2.0

1.74

and

112.0

113.0

1.0

0.89

and

114.9

121.0

6.1

3.17

VG

including

118.5

119.2

0.7

18.10

VG

This news release has been reviewed and approved by Paul McNeill, P. Geo., VP Exploration with Anaconda Mining Inc., a "Qualified Person", under National Instrument 43-101 Standard for Disclosure for Mineral Projects.

Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext