SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: LoneClone who wrote (167661)10/3/2022 12:10:54 PM
From: LoneClone  Read Replies (1) of 192748
 
Millrock Receives Positive Initial Mineralogy Results From the Nikolai (Ni-Cu-Co-PGE) Project, Alaska

ca.finance.yahoo.com

Millrock Resources Inc.
Thu, September 29, 2022 at 5:30 a.m.·7 min read

VANCOUVER, British Columbia, Sept. 29, 2022 (GLOBE NEWSWIRE) -- Millrock Resources Inc. (TSX-V: MRO) (“Millrock”) is pleased to report positive initial results from a mineralogical assessment of historical drill core from the Upper Eureka Zone (“UEZ”) and Core Eureka Zone (“CEZ”) at its 100% owned Nikolai Project, which hosts nickel (Ni) – copper (Cu) –cobalt (Co) – platinum group elements (PGE) prospects. The Nikolai Project is located within Alaska’s Delta Mining District, approximately 130 kilometers by road south of Delta Junction and approximately 280 kilometers southeast of Fairbanks. The Eureka zone consists of disseminated Ni-Cu-Co-PGE mineralization initially discovered by a subsidiary of INCO, and further expanded by Pure Nickel Inc., as reported in their press releases ranging between 2007-2014.

Highlights from the mineralogical assessment include:

  • 94% of the nickel within the CEZ is contained within nickel sulfide (pentlandite) and nickel alloy minerals.

  • 72% of the copper within the CEZ is contained within copper sulfides (chalcopyrite, bornite, chalcocite).

  • 80% of the nickel within the UEZ is contained within nickel sulfide (pentlandite) and nickel alloy minerals.

  • 75% of the copper within the UEZ is contained within copper sulfides (chalcopyrite, bornite, chalcocite).

  • Millrock President and CEO Gregory Beischer commented: “These are encouraging results! For large tonnage – low-grade deposits, it is crucial that potential recovery rates of the valuable metals are well understood. This first-pass work shows that much of the nickel and copper is in mineral form that allows strong recoveries with common processing methods.”

    Methodology – Metal Content
    Two composite samples from hole FL-003 were created for the UEZ and CEZ. Each composite was comprised of six quarter-core sample intervals spread across the mineralized zones. The anticipated metals content for each of the composited samples was calculated using historical assays from the work done by INCO in 1997 (Table 1). Historical logging and sampling of the INCO drill core was done under the direct supervision of Gregory Beischer, the qualified person responsible for the contents of this disclosure. Historical assays were performed at Chemex, Inc. in Reno, Nevada. Chemical analysis of the composites for this study were completed prior to the mineralogical study to validate the historical assay results completed by INCO (Table 1). Concentrations determined by INCO and by Millrock were found to be similar.

    Table 1. Sample intervals, historical grades, calculated composite grades, and actual assay results from mineralogical study for selected samples from hole FL-003 to create composites for the CEZ and UEZ.

    Composite 1 - Core Eureka Zone (CEZ)

    Sample

    Hole ID

    From ft

    To ft

    Ni ppm

    Cu ppm

    Co ppm

    Pd ppb

    Pt ppb

    Au ppb

    FX536263

    FL-003

    758

    763

    1900

    1800

    290

    164

    105

    10

    FX536264

    FL-003

    763

    768

    1900

    1870

    260

    162

    80

    14

    FX536270

    FL-003

    793

    798

    2500

    1270

    220

    164

    80

    10

    FX536274

    FL-003

    813

    818

    3000

    1560

    240

    206

    80

    52

    FX536277

    FL-003

    828

    833

    2300

    820

    180

    118

    50

    16

    FX536281

    FL-003

    848

    853

    3200

    1460

    210

    132

    50

    24

    CEZ Calculated Grade (Historic Assays)

    0.25

    0.14

    0.02

    0.157

    0.072

    0.023

    New Assays Results from Composite Samples

    0.25

    0.16

    0.02

    0.173

    0.043

    0.068





















    Composite 2 - Upper Eureka Zone (UEZ)

    Sample

    Hole ID

    From ft

    To ft

    Ni ppm

    Cu ppm

    Co ppm

    Pd ppb

    Pt ppb

    Au ppb

    FX536768

    FL-003

    257

    262

    1690

    385

    141

    82

    42.5

    2

    FX536772

    FL-003

    283

    288

    1500

    340

    120

    71

    33

    2

    FX536084

    FL-003

    347

    350

    2397

    938

    146

    128

    55

    14

    FX536086

    FL-003

    400

    405

    2636

    918

    154

    132

    65

    16

    FX536798

    FL-003

    415

    420

    1975

    630

    133

    83

    36

    12

    FX536253

    FL-003

    708

    713

    2000

    940

    220

    146

    70

    24

    UEZ Calculated Grade (Historic Assays)

    0.20

    0.07

    0.02

    0.104

    0.049

    0.009

    New Assays Results from Composite Samples

    0.23

    0.06

    0.02

    0.135

    0.031

    0.095


    Methodology Mineralogical Study
    The mineral processing work was completed by the Bureau Veritas Metallurgical Laboratory in Richmond, British Columbia, Canada. The individual composites were ground to ~125µm following standard grind calibration procedures. The ground composites were sized using wet screens and a cyclone sizer, and then sized into four fractions for chemical analysis and QEMSCAN analysis. QEMSCAN Particle Mineral Analysis was conducted on each size fraction of the sized composites to determine nickel and copper deportment and fragmentation characteristics.

    Initial Mineralogical Study Results
    Nickel sulfide and nickel alloys accounted for ~94% of the total nickel within the CEZ composite sample (only 5.1% of total nickel in silicates). Pentlandite was the principal nickel bearing sulfide and carried ~92% of the total nickel in the CEZ composite. Pentlandite content was measured at 0.68% by weight. The remaining potentially recoverable nickel was in the nickel alloys and nickel metal, which accounted for ~2% of the total nickel. Sulfur is higher in the CEZ (1.32%) and there is an increased amount of pyrrhotite (1.78% by weight). Interlocking between pentlandite and pyrrhotite was rarely observed, which will be favorable to the pentlandite separation from pyrrhotite.

    Nickel sulfide and nickel alloys accounted for ~80% of the total nickel within the UEZ composite sample (18.9% of total nickel in silicates). Pentlandite was the principal nickel bearing sulfide and carried ~64% of the total nickel in the CEZ composite. Pentlandite content was measured at 0.44% by weight. The remaining potentially recoverable nickel was in the form of nickel alloy and nickel metal, which accounted for ~16% of the total nickel. Sulfur is lower in the UEZ (0.49%), likely due to the decrease in pyrrhotite. These results are summarized in Table 2 below.

    Table 2. Summary of Ni-Fe-S deportment of Eureka Zone composites

    Nickel Deportment

    CEZ

    UEZ

    Ni-Fe Sulfides

    92.2

    %

    64.1

    %

    Ni-Fe Alloys

    2.1

    %

    16.7

    %

    Sulfide-Hydroxide

    0.6

    %

    0.3

    %

    Silicates (Olivine)

    5.1

    %

    18.9

    %

    Total Potential Recoverable Nickel

    94.3

    %

    80.8

    %

    % Ni from chemical analysis

    0.25

    %

    0.23

    %

    % S from chemical analysis

    1.32

    %

    0.49

    %

    Weight % pentlandite

    0.68

    %

    0.44

    %

    Weight % pyrrhotite

    1.78

    %

    0.55

    %


    Copper sulfides accounted for ~71% to 75% of the total copper within the CEZ and UEZ composites. Chalcopyrite is the dominant copper sulfide and accounts for ~67% to 71% of the copper in the composite samples. Bornite, chalcocite, cuprite, malachite, and azurite were also present, in the composite samples. The remainder of the copper (~24% to 28%) was present in valleriite (Cu-Fe-Mg sulphate). The copper sulfide contents were 0.31% by weight in the CEZ and 0.14% by weight in the UEZ. These results are summarized in Table 3 below.

    Table 3. Summary of Cu-Fe-S deportment of Eureka Zone composites

    Copper Deportment

    CEZ

    UEZ

    Chalcopyrite

    66.8

    %

    70.7

    %

    Bornite

    1.0

    %

    1.7

    %

    Chalcocite/Covellite

    3.5

    %

    2.9

    %

    Cuprite, Malachite, Azurite

    1.1

    %

    0.2

    %

    Valleriite

    27.5

    %

    24.5

    %

    Total Potential Recoverable Copper

    72.4

    %

    75.5

    %

    % Cu from chemical analysis

    0.16

    %

    0.07

    %

    Weight % Cu Sulfides

    0.31

    %

    0.14

    %


    An additional composite sample from the Lower Eureka Zone (“LEZ”) has been submitted to Bureau Veritas to complete identical mineralogical analysis. Assay results from the LEZ were reported in the Millrock press release from September 26, 2022. The results of the third composite will be released when completed.

    Quality Control – Quality Assurance
    Millrock adheres to stringent Quality Assurance – Quality Control (“QA/QC”) standards. Core samples are kept in a secure location at all times. In this case, the samples were assayed at the Bureau Veritas laboratory in Vancouver, Canada. Preparation and analysis methods are described in further detail here. Analysis methods used include MA270 – 4-acid digestion ICP-ES/MS Finish and FA330 – Fire assay fusion Au, Pt, Pd by ICP-ES. The Qualified Person is of the opinion that the results reported in this press release are reliable.

    Qualified Person
    The technical information within this document has been reviewed and approved by Gregory A. Beischer, President, CEO, and a director of Millrock. Mr. Beischer is a Qualified Person as defined in NI 43-101.

    About Millrock Resources Inc.
    Millrock Resources Inc. is a premier project generator to the mining industry. Millrock identifies, packages, and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk taken on by most exploration companies. The company is recognized as the premier generative explorer in Alaska, holds royalty interests in British Columbia, Canada, and Sonora State, Mexico, is a significant shareholder of junior explorer ArcWest Exploration Inc. and owns a large shareholding in Resolution Minerals Limited. Funding for drilling at Millrock’s exploration projects is primarily provided by its joint venture partners. Business partners of Millrock have included some of the leading names in the mining industry: EMX Royalty, Centerra Gold, First Quantum, Teck, Kinross, Vale, Inmet and, Altius as well as junior explorers Resolution, Riverside, PolarX, Felix Gold, and Tocvan.

    ON BEHALF OF THE BOARD
    “Gregory Beischer”
    Gregory Beischer, President & CEO

    FOR FURTHER INFORMATION, PLEASE CONTACT:
    Melanee Henderson, Investor Relations
    Toll-Free: 877-217-8978 | Local: 604-638-3164
    Twitter | Facebook | LinkedIn

    Some statements in this news release contain forward-looking information, including but not limited to execution of further deportment studies. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

    “NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”
    Report TOU ViolationShare This Post
     Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext