Nine Mile Metals (NINE-Cse) XRF Results up to 18.38% Combined (Pb-Zn) on Holes CL22-08 & CL22-11 on Initial California Lake VMS Drill Program
  Dec 6, '22 - NR
   Nine Mile Metals is pleased to announce the XRF results for VMS  target Holes CL2208 and CL2211 at its initial Phase 1 drill program at  its California Lake VMS Project in the world-famous Bathurst Mining  Camp, New Brunswick (“BMC”).   Highlights:
    
  VMS  Target Hole CL2211 was a step out hole collared approximately 20 meters  north of discovery hole CL2206 and drilled to a depth of 80 meters  intersecting (4) zones of massive VMS mineralization between 51.10 and  62.00 meters (10.90m.)
   | Sample # | From (m) | To (m) | Width (m) | Cu % | Pb (%) | Zn (%) | (Pb + Zn) % | Ag (g/t) | Au (g/t) |  | 226097 | 51.10 | 51.23 | 0.13 | .02 | 1.62 | 5.28 | 6.90 | TBD | TBD |  | 226098 | 51.23 | 51.73 | 0.50 | .02 | 9.34 | 1.00 | 10.34 | TBD | TBD |  | 226099 | 51.73 | 53.00 | 1.27 | .07 | 0.95 | 6.70 | 7.65 | TBD | TBD |  | 226101 | 54.04 | 55.04 | 1.00 | .17 | 3.00 | 11.77 | 14.77 | TBD | TBD |  | 226102 | 55.04 | 56.00 | 0.96 | .31 | 2.83 | 11.45 | 14.28 | TBD | TBD |  | 226107 | 59.63 | 60.20 | 0.57 | .10 | 1.44 | 9.61 | 11.05 | TBD | TBD |  | 226110 | 61.6 | 62.00 | 0.40 | .38 | 0.30 | 2.90 | 3.58 | TBD | TBD |  
    VMS  Target Hole CL2208 was collared near hole CL2206 and drilled at an  azimuth of 312 degrees to a depth of 89 meters intersecting visible  massive VMS mineralization between 67.33 and 70.50 meters (3.17m).
   | Sample # | From (m) | To (m) | Width (m) | Cu (%) | Pb (%) | Zn (%) | (Pb + Zn) % | Ag (g/t) | Au (g/t) |  | 226070 | 67.33 | 68.33 | 1.00 | .05 | 0.81 | 3.85 | 4.66 | TBD | TBD |  | 226071 | 68.33 | 69.33 | 1.00 | .17 | 3.26 | 15.12 | 18.38 | TBD | TBD |  | 226072 | 69.33 | 70.50 | 1.17 | .20 | 3.33 | 10.36 | 13.69 | TBD | TBD |  
    VMS  mineralization in both drill holes was again dominated by Zn  mineralization, with individual sample sections up to 15.12 % Zn.
  Pb mineralization was much more discreet.
  Both drill holes demonstrate that the mineralized zone is open in both directions along strike and depth.
  Samples of the VMS mineralization and adjacent rock have been shipped to the ALS Global Labs (“ALS”) for Certification.
  Note: Due  to time constraints between the California Lake drill program and the  initiation of the Nine Mile Brook VMS drill program, XRF analysis was  only conducted on the zones of visible VMS mineralization. The complete  mineralized zone has been sent to ALS for analysis and we will announce  those complete results once received. All holes have been logged,  photographed, measured, and cut. Holes 8-9-10-11-12-13 are currently in  the XRF process and we look forward to reporting additional results,  including summarized full widths.
    It  is important to note that the Ag and Au values will be reported upon  receipt of the assay results from ALS since XRF analysis for these  elements is unreliable. The California Lake Group has historically been a  prolific zone for Silver and is typically associated with Pb - Zn  sulfides.
    Patrick J Cruickshank,  MBA, CEO & Director stated, “We are pleased to report these good VMS  intersections of mineralization at our initial California Lake VMS  Drill Program. A much thicker width is very encouraging as it lays the  foundation to our stage 2 program analysis for 2023 along the entire 1.5  kms anomaly. With such high combined Pb – Zn results, I am very anxious  to see the Certified Results including the Ag & Au returns. With  such high grades for Pb-Zn we should see a positive reflection in the  certified (Ag) Silver assays. Once we receive the assays of the  sediments between the VMS finger zones in these, we will be able to  report the full widths of these holes. We look forward to reporting our  next set of results shortly.”
    Drill  Holes 8 and 11 continue to build on the visible Cu, Pb, Zn +/- Ag, Au  mineralization intersected in discovery hole CL2206. The target zone is  structural, well foliated, and where well mineralized, is approximately  10 meters in width and includes multiple sections of VMS mineralization.  The host rocks are primarily sediments with local bands of volcanics.  Mineralization is typical of the BMC with sections consisting of 95%+  sulphides including pyrite, sphalerite (Zn) and galena (Pb), the latter  two visible in drill core as disseminations and bands respectively.
    “Drill  Holes CL2208 and CL2211 demonstrate the potential along the  1.5-kilometer geophysical trend defined by EarthEx Geophysical Solutions  Inc. from the reprocessed regional MegaTEM data. The intersections to  date are robust and typical of the Bathurst Mining Camp. The team is  looking forward to receiving the certified results from ALS Global Labs  including the Au and Ag assays,” stated Gary Lohman, B.Sc., P. Geo.,  Director.
    The Pb, Zn  mineralization suggests that initial deposition occurred along the  flanks of a VMS system where Pb / Zn is typically dominant. Subsequent  shearing and structural activity have dislocated the mineralization  however the dense sulphides remain intact having generally hard contacts  with the surrounding sediments. Individual mineralized widths within  the 10-meter section can be greater than 3 meters. Pyrite mineralization  is also present within the sediments.
     
    The  disclosure of technical information in this news release has been  prepared in accordance with Canadian regulatory requirements as set out  in National Instrument 43-101 – Standards of Disclosure for Mineral  Projects (“NI 43-101”) and reviewed and approved by Gary Lohman, B.Sc.,  P. Geo., Director who acts as the Company’s Qualified Person, and is not  independent of the Company.
    About Nine Mile Metals Ltd.:
    Nine  Mile Metals Ltd. is a Canadian public mineral exploration company  focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous  Bathurst Mining Camp, New Brunswick, Canada. The Company’s primary  business objective is to explore its three VMS Projects: Nine Mile Brook  VMS Project; California Lake VMS Project; and the Canoe Landing Lake  (East – West) VMS Project. The Company is focused on exploration of  Minerals for Technology (MFT), positioning for the boom in EV and green  technologies requiring Copper, Silver, Lead and Zinc with a hedge with  Gold.
    ON BEHALF OF NINE MILE METALS LTD.
    “Patrick J. Cruickshank, MBA” CEO and Director  T: 506-804-6117 E:  patrick@ninemilemetals.com
  A photo accompanying this announcement is available at globenewswire.com |