SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: LoneClone12/15/2022 11:54:58 AM
  Read Replies (1) of 192641
 
FRONTIER LITHIUM INTERSECTS 126.8M OF PEGMATITE AVERAGING 1.31% Li2O, INCLUDING A 11M ZONE OF 1.79% Li2O and 459ppm Ta2O5 AND ANNOUNCES NEW STOCK OPTION PLAN AND GRANT OF OPTIONS

newswire.ca

Frontier Lithium Inc. Dec 14, 2022, 07:30 ET

SUDBURY, ON, Dec. 14, 2022 /CNW/ - Frontier Lithium Inc. (TSXV: FL) (FRA: HL2) (OTCQX: LITOF) ("Frontier" or "the Company") is pleased to announce the results for seven more drill holes completed during Phase XII drill program on the Spark pegmatite which began in May with two diamond drill rigs and finished in October of 2022 with 14,641m in 45 holes. The main objective of the program was focused on converting inferred material to the indicated category for the planned open pit. The Spark pegmatite is one of the two delineated premium spodumene-bearing lithium deposits on the PAK Lithium Project.




Planview map of the Spark pegmatite showing drillhole traces. (CNW Group/Frontier Lithium Inc.)





Highlights



  • When combining Phase XI and Phase XII delineation and infill drilling, the Company completed 15,984m of drilling in 50 holes in 2022. Highlights from the seven Phase XII diamond drill holes reported are included below.
  • DDH PL-077-22 intersected 126.8m of pegmatite from 56.9m to 183.7m averaging 1.31% Li2O. Drilled from the south, PL-077-22 was the first of 4 holes designed to define the eastern extent where the main Spark pegmatite orebody begins to break up into smaller pods separated by mafic rafts.
  • Includes two narrow lithium and tantalum enriched zones at depth including 11.1m from 260.2 to 271.3m averaging 1.79% Li2O and 459 ppm Ta2O5 and 13.5m from 414.5 to 428.0m averaging 1.01% Li2O and 194 ppm Ta2O5.
  • DDH PL-078-22 intersected 104.9m of pegmatite from 120.4 to 225.3m averaging 1.58% Li2O and a second 33.5m pegmatite zone from 246.7 to 280.2m averaging 1.63% Li2O. Collared in the mafic volcanic host rock 24m west of PL-040-19, the hole designed to define the eastern extent where the main Spark pegmatite orebody begins to break up into smaller pods separated by mafic rafts.
  • Includes 35m from 149.0 to 184.0m averaging 2.39% Li2O.
  • Includes 24.3m from 255.5m to 259.8m averaging 2.04% Li2O.


  • "We are pleased with the drilling results from the 2022 Drill Program to date, with the Spark deposit remaining open in all directions. The focus continues to be at depth and to the west where the grade and thicknesses of the deposit remain robust." states Garth Drever, V.P. Exploration. "Of the 14,641m drilled during Phase XII, a total of 8,720m of drill core was cut and submitted for analysis. 15 holes are outstanding and will be disseminated as they are received and pass quality assurance and control protocols."

    The initial objective for the Phase XII drill program was focused on converting the inferred resource within the Spark deposit to the indicated category in preparation for a pre-feasibility study on the PAK Lithium Project. The latter half of the program included geotechnical drilling for ground control and pit design purposes as well as step out drilling to define the eastern and western extents of the ore body.

    Figure 1 is a location map showing the project area including Frontier's land tenure and location of the three lithium-cesium-tantalum pegmatites.

    Figure 2 is a plan view showing all drilling with analytical data completed to date with emphasis on drill hole traces reported in this release.

    Table 1 details the drill holes and channel with mineralized intersections while Table 2 summarizes all Phase XII drill holes completed as well as the channel.



    Table 1: Details of Mineralized Intersections
    Drill Hole
    PL-077-22


    Collared in between PL-076-22 and PL-045-19, the hole was designed to define the
    pegmatite east of the main body where it begins to break up into smaller pods separated by
    mafic rafts. In total, 159m of pegmatite was intersected, most of which was mineralized
    (>1% Li2O).

    Zone

    From
    (m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2
    (ppm)


    Rb2O
    (%)


    Unit

    Li-Enriched

    56.9

    183.7

    126.8

    1.31

    0.02

    85

    70

    113

    0.26

    Pegmatite-Aplite


    including

    76.0

    102.0

    26.0

    1.77

    0.02

    89

    70

    160

    0.28

    Pegmatite

    Li-Ta-Rb Enriched

    260.2

    271.3

    11.1

    1.79

    0.31

    459

    49

    122

    0.68

    Aplite

    Li-Ta-Rb Enriched

    414.5

    428.0

    13.5

    1.01

    0.19

    194

    37

    113

    0.47

    Aplite






    Drill Hole
    PL-078-22


    Collared 24m west of PL-040-19, the hole was designed to define the pegmatite on the east
    extent of Spark where the pegmatite pods begin to pinch out

    Zone

    From
    (m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2
    (ppm)


    Rb2O
    (%)


    Unit

    Li-Enriched

    120.4

    225.3

    104.9

    1.58

    0.04

    153

    64

    120

    0.35

    Aplite



    including

    149.0

    184.0

    35.0

    2.39

    0.03

    208

    69

    120

    0.38

    Aplite


    Li- Enriched

    246.7

    280.2

    33.5

    1.63

    0.07

    186

    50

    56

    0.26

    Pegmatite


    including

    255.5

    279.8

    24.3

    2.04

    0.05

    256

    69

    48

    0.29

    Pegmatite






    Drill Hole
    PL-080-22


    Collared 16m south of PL-051-21 on the of the main Spark pegmatite, the hole
    was designed to define the west end where the main ore body begins to break up into smaller
    pegmatite pods separated by mafic rafts. A total of 190m of pegmatite was intersected with
    much of the southern lower intersections barren of spodumene.

    Zone

    From
    m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2
    (ppm)


    Rb2O
    (%)


    Unit

    Li-Enriched

    2.5

    81.0

    78.5

    1.12

    0.02

    69

    83

    69

    0.25

    Aplite-pegmatite


    including

    2.5

    32.0

    29.5

    1.75

    0.01

    44

    71

    72

    0.31

    Pegmatite

    Li-Enriched

    94.5

    100.0

    5.5

    2.07

    0.01

    51

    27

    52

    0.19

    Pegmatite

    Li-Enriched

    106.0

    121.1

    15.1

    2.20

    0.03

    93

    66

    75

    0.42

    Pegmatite


















    Drill Hole
    PL-081-22


    Collared 13m south of PL-080-22 on top of the main Spark pegmatite, the hole was designed
    to fill in a gap to convert material and to further define the southern contact of the main ore
    body. The intent was to extend the hole and further define smaller pegmatite pods to the
    south. A total of 227.3m of pegmatite was intersected with mostly barren pegmatite below 200m..

    Zone

    From
    (m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2

    (ppm)

    Rb2O
    (%)


    Unit

    Li-Enriched

    3.4

    48.1

    44.7

    1.40

    0.02

    56

    74

    36

    0.26

    Aplite-pegmatite


    including

    32.9

    40.3

    7.4

    2.98

    0.01

    71

    72

    36

    0.18

    Pegmatite

    Li-Enriched

    59.3

    144.1

    84.9

    1.63

    0.01

    92

    87

    45

    0.26

    Aplite



    including

    112.5

    140.5

    28.0

    2.06

    0.01

    86

    86

    42

    0.27

    Aplite


    Li-Enriched

    162.1

    198.2

    36.1

    1.75

    0.03

    78

    106

    64

    0.24

    Aplite



    including

    163.0

    189.0

    26.0

    2.03

    0.02

    82

    109

    60

    0.27

    Aplite







    Drill Hole
    PL-082-22


    Collared on the southern end of CH-50 on top of the main Spark pegmatite, designed to fill in
    a gap and define the northern contact of the main orebody.

    Zone

    From
    (m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2
    (ppm)


    Rb2O
    (%)


    Unit

    Li-Enriched

    0.0

    25.5

    25.5

    1.08

    0.04

    43

    53

    58

    0.20

    Pegmatite


    including

    0.0

    17.5

    17.5

    1.35

    0.05

    43

    51

    60

    0.21

    Pegmatite

    Li-Enriched

    36.3

    86.0

    49.8

    1.80

    0.01

    67

    82

    42

    0.24

    Pegmatite-Aplite


    including

    76.5

    86.0

    9.5

    2.92

    0.01

    50

    54

    32

    0.20

    Aplite-pegmatite

    Li-Enriched

    111.7

    187.3

    75.7

    1.70

    0.02

    130

    98

    71

    0.29

    Aplite-pegmatite


    including

    123.5

    141.0

    17.5

    2.14

    0.03

    119

    85

    106

    0.30

    Pegmatite






    Drill Hole
    PL-083-22


    Collared 32m east of PL-078-22, the hole was designed to define the pegmatite on the east
    extent of Spark where the pegmatite pods begin to pinch out

    Zone

    From
    (m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2
    (ppm)


    Rb2O
    (%)


    Unit

    Li-Enriched

    121.4

    154.9

    33.5

    1.67

    0.04

    165

    58

    109

    0.29

    Aplite-Pegmatite


    including

    145.0

    153.9

    8.8

    3.09

    0.00

    322

    80

    59

    0.06

    Pegmatite

    Li-Enriched

    169.5

    209.6

    40.1

    1.04

    0.03

    100

    42

    100

    0.26

    Aplite



    including

    171.9

    202.4

    30.5

    1.19

    0.03

    107

    46

    111

    0.29

    Aplite


    Li-Enriched

    316.5

    361.0

    44.5

    1.56

    0.11

    202

    49

    146

    0.82

    Pegmatite-Aplite


    including

    337.0

    353.8

    16.8

    2.34

    0.09

    143

    37

    93

    0.99

    Pegmatite






    Drill Hole
    PL-084-22


    Collared 18m east of PL-083-22, the hole was stepped out to cut off the east extent of
    the Spark pegmatite. Although the pegmatite is narrowing, it still remains open


    Zone

    From
    (m)


    To
    (m)


    Width
    (m)


    Li2O
    (%)


    Cs2O
    (%)


    Ta2O5
    (ppm)


    Nb2O5
    (ppm)


    SnO2
    (ppm)


    Rb2O
    (%)


    Unit


    Li-Enriched

    14.4

    20.2

    5.9

    2.41

    0.01

    73

    45

    21

    0.25

    Pegmatite


    Li-Enriched

    92.1

    97.0

    4.9

    1.21

    0.01

    150

    79

    76

    0.21

    Aplite


    Li-Enriched

    107.2

    123.0

    15.8

    1.36

    0.02

    134

    71

    80

    0.35

    Aplite







    Table 2: Summary of Phase XII Drill Program (May to October 2022)
    DDHNo

    Date Drilled

    UTM Zone 15N (NAD83)

    Collar Orient

    Metres Drilled

    Start

    End

    Easting

    Northing

    (mASL)

    Azim

    Dip

    Start

    End

    Phase XII

    PL-057-221

    2022-05-15

    2022-10-01

    472,733

    5,829,489

    355.9

    359

    -55

    0

    225

    PL-058-221

    2022-05-17

    2022-10-03

    472,733

    5,829,489

    355.9

    177

    -70

    0

    400

    PL-059-222

    2022-05-24

    2022-05-28

    472,698

    5,829,535

    356.0

    165

    -78

    0

    316

    PL-060-222

    2022-05-27

    2022-06-04

    472,749

    5,829,559

    360.0

    180

    -73

    0

    360

    PL-061-222

    2022-05-20

    2022-05-27

    472,773

    5,829,561

    360.2

    178

    -65

    0

    327

    PL-062-223

    2022-05-28

    2022-06-05

    472,712

    5,829,596

    356.2

    176

    -65

    0

    360

    PL-063-221

    2022-06-05

    2022-06-10

    472,746

    5,829,539

    360.0

    187

    -70

    0

    348.5

    PL-064-221

    2022-06-05

    2022-06-10

    472,712

    5,829,596

    356.2

    141

    -65

    0

    352.5

    PL-065-224

    2022-06-10

    2022-06-22

    472,686

    5,829,583

    354.0

    173

    -72

    0

    330.86

    PL-066-223

    2022-06-12

    2022-06-27

    472,732

    5,829,371

    325.0

    323

    -70

    0

    365.67

    PL-067-224

    2022-06-29

    2022-07-04

    472,778

    5,829,383

    327.0

    315

    -70

    0

    352.5

    PL-068-222

    2022-06-22

    2022-06-27

    472,790

    5,829,540

    360.0

    171

    -55

    0

    343.5

    PL-069-224

    2022-07-06

    2022-07-15

    472,814

    5,829,385

    326.0

    324

    -61

    0

    412.3

    PL-070-223

    2022-06-28

    2022-07-04

    472,805

    5,829,588

    360.0

    184

    -54

    0

    405

    PL-071-223

    2022-07-04

    2022-07-15

    472,805

    5,829,588

    360.0

    160

    -52

    0

    384.6

    PL-072-224

    2022-07-15

    2022-07-21

    472,847

    5,829,384

    326.0

    349

    -61

    0

    386.2

    PL-073-223

    2022-07-16

    2022-07-23

    472,816

    5,829,589

    360.0

    146

    -52

    0

    392

    PL-074-225

    2022-07-28

    2022-08-02

    472,584

    5,829,497

    354.0

    162

    -47

    0

    403.5

    PL-075-225

    2022-08-01

    2022-08-06

    472,571

    5,829,490

    354.0

    177

    -47

    0

    408

    PL-076-225

    2022-07-25

    2022-08-05

    472,846

    5,829,384

    326.0

    314

    -63

    0

    438

    PL-077-22

    2022-08-08

    2022-08-24

    472,864

    5,829,390

    326.0

    354

    -56

    0

    433.38

    PL-078-22

    2022-08-25

    2022-09-01

    472,939

    5,829,369

    326.0

    341

    -55

    0

    339.7

    PL-079-225

    2022-08-06

    2022-08-15

    472,538

    5,829,480

    357.0

    177

    -48

    0

    417

    PL-080-22

    2022-08-16

    2022-08-23

    472,687

    5,829,511

    354.0

    193

    -55

    0

    418.5

    PL-081-22

    2022-08-24

    2022-08-30

    472,689

    5,829,499

    354.0

    177

    -46

    0

    367.7

    PL-082-22

    2022-08-30

    2022-09-02

    472,718

    5,829,455

    355.0

    6

    -61

    0

    241.5

    PL-083-22

    2022-09-02

    2022-09-06

    472,971

    5,829,367

    326.0

    343

    -57

    0

    377.3

    PL-084-22

    2022-09-07

    2022-09-11

    472,983

    5,829,380

    325.0

    358

    -42

    0

    327

    PL-085-22

    2022-09-02

    2022-09-05

    472,731

    5,829,472

    354.0

    309

    -57

    0

    232

    PL-086-22

    2022-09-05

    2022-09-08

    472,731

    5,829,472

    354.0

    162

    -46

    0

    201

    PL-087-22

    2022-09-08

    2022-09-11

    472,701

    5,829,451

    354.0

    318

    -50

    0

    213.4

    PL-088-22

    2022-09-11

    2022-09-16

    472,706

    5,829,453

    354.0

    173

    -46

    0

    210.7

    PL-089-22

    2022-09-16

    2022-09-17

    472,762

    5,829,514

    360.0

    360

    -50

    0

    87

    PL-090-22

    2022-09-11

    2022-09-15

    472,746

    5,829,371

    326.0

    334

    -45

    0

    289.4

    PL-091-22

    2022-09-15

    2022-09-18

    472,663

    5,829,362

    327.0

    338

    -43

    0

    261.4

    PL-092-22

    2022-09-17

    2022-10-20

    472,762

    5,829,514

    360.0

    174

    -46

    0

    274.5

    PL-093-22

    2022-09-20

    2022-09-23

    472,614

    5,829,329

    328.0

    345

    -47

    0

    253.6

    PL-094-22

    2022-09-24

    2022-10-01

    472,657

    5,829,357

    326.0

    351

    -54

    0

    339

    PL-095-22

    2022-09-20

    2022-09-23

    472,785

    5,829,531

    362.0

    165

    -44

    0

    258.6

    PL-096-22

    2022-09-23

    2022-09-30

    472,865

    5,829,583

    359.0

    136

    -44

    0

    425.3

    PL-097-22

    2022-10-03

    2022-10-04

    472,698

    5,829,535

    354.0

    6

    -70

    0

    12.5

    PL-098-22

    2022-10-01

    2022-10-09

    472,756

    5,829,387

    327.0

    317

    -58

    1

    471

    PL-099-22

    2022-10-09

    2022-10-15

    472,529

    5,829,361

    330.0

    345

    -65

    0

    477

    PL-GDH-11-22

    2022-07-22

    2022-07-24

    473,046

    5,829,379

    325.0

    285

    -47

    0

    173.5

    PL-GDH-12-22

    2022-07-23

    2022-07-25

    472,456

    5,829,470

    358.0

    119

    -45

    0

    228


    Total metres drilled

    14,641.1

    Notes:

    1: Reported on Release July 25, 2022


    2: Reported on Release August 17, 2022


    3: Reported on Release September 20, 2022


    4: Reported on Release October 11, 2022


    5: Reported on Release November 16, 2022




    Due Diligence

    All scientific and technical information in this release has been reviewed and approved by Garth Drever, P.Geo., the qualified person (QP) under the definitions established by National Instrument 43-101. Under Frontier's QA/QC procedures, all drilling was completed by Chenier Drilling Ltd. of Val Caron, ON using thin walled BTW drill rods (4.2 cm core diameter) and a Reflex ACT III oriented core system. Using the Reflex system, the drill core was oriented and marked as it was retrieved at the drill. The core was boxed and delivered to the Frontier core shack where it was examined, geologically logged, and marked for sampling. The core was photographed prior to sampling. Using a rock saw, the marked sample intervals were halved with one-half bagged for analysis. Sample blanks along with lithium, rubidium and cesium certified reference material was routinely inserted into the sample stream in accordance with industry recommended practices. Field duplicate samples were also taken in accordance with industry recommended practices. The samples were placed in poly sample bags and transported to Red Lake by float plane and then shipped to AGAT Laboratories Ltd. (AGAT) in Thunder Bay for sample preparation and to Mississauga, Ontario for processing and quantitative multi-element analysis. AGAT is an ISO accredited laboratory. The core is stored on site at the Pakeagama Lake exploration camp.

    New Stock Option Plan and Grant of Stock Options

    The Company also announces that it has adopted a new 10% rolling stock option plan (the "New Stock Option Plan"). The New Stock Option Plan has been approved by the board of directors of the Company, the shareholders of the Company at the annual general meeting of shareholders on October 3, 2022, and is subject to approval by the TSX Venture Exchange ("TSXV"). The New Stock Option Plan replaces the Company's previous 10% fixed stock option plan.

    Under the New Stock Option Plan, the Company may grant options to acquire common shares of the Company in an aggregate amount of up to 10% of the then current issued and outstanding common shares, subject to the terms and conditions of the New Stock Option Plan, the Policies of the TSXV and applicable securities laws. Any options outstanding under the previous stock option plan will be governed by the New Stock Option Plan. The New Stock Option Plan will be filed on the Company's SEDAR profile and the terms, limitations and conditions of this plan can be accessed at www.sedar.com.

    The board of directors of the Company would also like to announce at this time that is has granted an aggregate of 4,900,000 stock options under the New Stock Option Plan (the "Options"). The Options have been issued to certain directors, officers, consultants and employees of the Company for retention purposes, and in recognition of these individuals continuing efforts in assisting the Company's with its growth. The Options are exercisable at a price of $ $2.10 per common share and will have a term of 5 years from the date of issuance. 50% of these Options vest on the grant date, and the remaining 50% vest on the date that is the first anniversary date of the grant date. These Options are subject to approval by the TSXV.

    About Frontier Lithium
    Frontier Lithium is a preproduction business with an objective to become a strategic domestic supplier of spodumene concentrates for industrial users as well as battery-grade lithium hydroxide and other chemicals to the growing electric vehicle and energy storage markets in North America. The Company maintains the largest land position and resource in a premium lithium mineral district located in Ontario's Great Lakes region.

    About PAK Lithium Project
    The PAK lithium project contains one of North America's highest-grade lithium resources. The project encompasses close to 27,000 hectares and remains largely unexplored; however, since 2013, the company has delineated two premium spodumene-bearing lithium deposits (PAK and Spark), located 2.3 kilometres apart. Exploration is continuing on the project through two other spodumene-bearing discoveries: the Bolt pegmatite (located between the PAK and Spark deposits), as well as the Pennock pegmatite (25 kilometres northwest of PAK deposit within the project claims). A 2021 preliminary economic assessment (National Instrument 43-101 technical report titled "NI 43-101 Technical Report, Pak Property, PAK, Red Lake Mining District, Ontario, Canada" by BBA E&C Inc., with an effective date of April 5, 2021) delivered a fully integrated lithium operation, including the mine and mill and the conversion plant for production of battery-quality lithium salts.

    Forward-looking Statements

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and those actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, Investors should review the Company's registered filings available at sedar.com.

    Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

    SOURCE Frontier Lithium Inc.

    For further information: Company Contact Information: Bora Ugurgel, Manager, Investor Relations, 2736 Belisle Drive Val Caron, ON. P3N 1B3 CANADA, T. +001 705.897.7622, F. +001 705.897.7618


    Report TOU ViolationShare This Post
     Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext