NEVADA KING MOBILIZES A FOURTH RIG TO ATLANTA, RESUMES CORE DRILLING FOR ONGOING METALLURGICAL TESTING PROGRAM AND RESOURCE CONFIRMATION
newswire.ca
Nevada King Gold Corp.21 Sep, 2023, 07:30 ET
VANCOUVER, BC,Sept. 21, 2023/CNW/ -Nevada King Gold Corp.(TSXV: NKG) (OTCQX: NKGFF) ("Nevada King" or the "Company") is pleased to announce the mobilization of a diamond core drill to its 5,166 hectare (51.6km2), 100%-owned Atlanta Gold Mine Project, located in the prolific Battle Mountain Trend, 264km northeast ofLas Vegas, Nevada. There are now four drill rigs operating atAtlanta– three reverse circulation ("RC") rigs and one diamond core drill. The Company is also pleased to announce the results of its 2023 meeting of shareholders.
Highlights:
 Figure 1. Photograph of recently mobilized core rig drilling south of the Atlanta Pit (CNW Group/Nevada King Gold Corp.)
- Core drilling will focus on a series of six strategically placed PQ holes totaling1,480malong high-grade corridors in and around the historic Atlanta Pit that will be used for the ongoing metallurgical testing program as well as confirmation of proximal RC hole results.
- The Company continues to utilize one RC rig to define deeper mineralization within the West Atlanta Graben ("WAG") while a second RC rig is targeting shallower mineralization along the Atlanta Mine Fault Zone with closer-spaced drilling designed to better define high-grade zones discovered byNevada Kingwithin the main resource area. A third RC rig is currently drilling a series of widely spaced exploration holes at the Western Knolls prospect, located 5.5km west of the Atlanta Pit, testing a variety of geochemical and geophysical anomalies.
- From inception of the Phase I drill program inJune 2021, into the continuation of Phase II,Nevada Kinghas drilled346 RC holes totaling55,186mand 17 core holes totaling1,398m, for a total of56,584m. Assays from 234 drill holes totaling32,876mhave been reported withresults pending for 129 drill holes totaling22,314m.
- The existing resource model (Table 1 below) atAtlantais based on 71 historic drill holes and does not incorporate any of the Phase I or II drilling completed byNevada Kingto date – drilling that continues to expand mineralization northward and southward outside of the resource model, as well as westward into the WAG.
Qualified Person The scientific and technical information in this news release has been reviewed and approved byCalvin R. Herron, P.Geo., who is a Qualified Person as defined by National Instrument 43-101 ("NI 43-101").
2023 Shareholder Meeting Results
Nevada Kingreports the results of its annual general and special meeting (the "Meeting") of shareholders held onSeptember 20, 2023, inVancouver, BC,Canada. At the Meeting, shareholders approved all of the resolutions detailed in the related management information circular, namely:
- Setting the number of directors to be elected at the Meeting at four (4);
- Electing all nominee directors to the board of directors of the Company for the ensuing year;
- Appointing Davidson & Company LLP, Chartered Professional Accountants, as auditor of the Company to hold office until the next annual meeting of Shareholders, or until a successor is appointed, and authorizing the directors of the Company to fix the remuneration of the auditor; and
- Approving the stock option plan of the Company.
Votes representing 114,888,492 shares or 36.51% of the issued and outstanding shares of the Company as at the record date were cast. The following table details the results:
Motion
| Votes For
| Votes Against
| Votes Withheld
| Number of Directors
| 114,776,331
(99.90 %)
| 112,161
(0.10 %)
| N/A
| Election of Directors:1
|
|
|
| Paul Matysek
| 80,133,803
(90.31 %)
| N/A
| 8,595,520
(9.68 %)
| Collin Kettell
| 80,141,436
(90.32 %)
| N/A
| 8,587,887
(9.68 %)
| Craig Roberts
| 84,671,288
(95.43 %)
| N/A
| 4,058,035
(4.57 %)
| William Hayden
| 84,645,580
(95.40 %)
| N/A
| 4,083,743
(4.60 %)
| Appointment of Auditor2
| 114,693,349
(99.83 %)
| N/A
| 131,641
(0.11 %)
| Approval of Stock Option Plan3
| 87,039,929
(98.29 %)
| 1,515,093
(1.71 %)
| N/A
|
____________________________________
| 126,159,169 votes not submitted by participants/brokerage houses
| 263,502 votes not submitted by participants/brokerage houses
| 326,33,470 votes not submitted by participants/brokerage houses
|
About Nevada King Gold Corp. Nevada Kingis the third largest mineral claim holder in theState of Nevada, behindNevada Gold Mines(Barrick/Newmont) andKinross Gold. Starting in 2016 the Company has staked large project areas hosting significant historical exploration work along theBattle Mountaintrend located close to current or former producing gold mines. These project areas were initially targeted based on their potential for hosting multi-million-ounce gold deposits and were subsequently staked following a detailed geological evaluation. District-scale projects inNevada King'sportfolio include (1) the 100% owned Atlanta Mine, located 100km southeast ofEly, (2) the Lewis and Horse Mountain-Mill Creek projects, both located betweenNevada Gold Mines'largePhoenixand Pipeline mines, and (3) the Iron Point project, located 35km east ofWinnemucca, Nevada.
The Atlanta Mine is a historical gold-silver producer with a NI 43-101 compliant pit-constrained resource of 460,000 oz Au in the measured and indicated category (11.0Mtonnes at 1.3 g/t) plus an inferred resource of 142,000 oz Au (5.3Mtonnes at 0.83 g/t). See the NI 43-101 Technical Report on Resources titled "Atlanta Property,Lincoln County, NV" with an effective date ofOctober 6, 2020, and a report date ofDecember 22, 2020, as prepared by Gustavson Associates and filed under the Company's profile on SEDAR+ ( www.sedarplus.ca).
Resource Category
| Tonnes
(000s)
| Au Grade
(ppm)
| Contained Au Oz
| Ag Grade
(ppm)
| Contained Ag Oz
| Measured
| 4,130
| 1.51
| 200,000
| 14.0
| 1,860,000
| Indicated
| 6,910
| 1.17
| 260,000
| 10.6
| 2,360,000
| Measured + Indicated
| 11,000
| 1.30
| 460,000
| 11.9
| 4,220,000
| Inferred
| 5,310
| 0.83
| 142,000
| 7.3
| 1,240,000
| Table 1. NI 43-101 Mineral Resources at the Atlanta Mine
|
Please see the Company's website at www.nevadaking.ca.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statements Regarding Forward Looking Information This news release contains certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, included herein, without limitation, statements relating the future operations and activities ofNevada King, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", and similar expressions, or statements that events, conditions, or results "will", "may", "could", or "should" occur or be achieved. Forward-looking statements in this news release relate to, among other things, the Company's exploration plans and the Company's ability to potentially expand mineral resources and the impact thereon. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable byNevada King, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the ability to complete proposed exploration work, the results of exploration, continued availability of capital, and changes in general economic, market and business conditions. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these items.Nevada Kingdoes not assume any obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by applicable securities laws.
SOURCE Nevada King Gold Corp.
For further information: Collin Kettell at collin@nevadaking.ca or (845) 535-1486. |