Mustang Energy Receives Exploration Permit for the Roughrider South and Cigar Lake East Project, Saskatchewan
  globenewswire.com
   January 24, 2025 19:04 ET                                 | Source:                                Mustang Energy Corp.                                                   
   VANCOUVER, British Columbia, Jan.  24, 2025  (GLOBE NEWSWIRE) -- Mustang Energy Corp. (CSE: MEC, OTC:MECPF, FRA:92T) (the “Company” or “Mustang”)  is pleased to announce it has received exploration permits from the  Saskatchewan Government, allowing for ground-based exploration  activities at the Roughrider South and Cigar Lake East Project (the “Projects”) in the Athabasca Basin, Saskatchewan.
      The  permit authorizes Mustang to carry out mineral exploration activities  such as trail construction, line-cutting, ground geophysical surveys,  and diamond drilling. The approved permits are valid until September 30,  2027.
      As part of the permit conditions,  Mustang will continue to engage with local communities, including the  Ya’thi Néné Lands and Resource Office, to address any ongoing concerns  and ensure sustainable project implementation. Consultation and  environmental stewardship remains a priority, with specific measures to  minimize disturbance and support reclamation efforts.
      About the Roughrider South and Cigar Lake East Project: 
      Each  of the Cigar Lake East and Roughrider South projects are located in the  Eastern Athabasca Basin in northwest Saskatchewan, situated near the  highly prospective Wollaston-Mudjatik transition zone. The Projects  consists of four claims covering a total area of 3,443 hectares and are  in close proximity to all-season roads and electrical transmission  lines. The uranium endowment of the area is proven by the surrounding  deposits including the world class Cigar Lake Uranium Mine (138.4  million pounds produced)1 and Rabbit Lake Uranium Mine to the Northeast.
      An  airborne magnetics/VTEM survey was conducted in 2023 by Stallion  Uranium Corp., the previous holder of the Projects, highlighting  structural features on the Projects. Mustang has engaged Resource  Potentials Ltd. to reinterpret these data sets in an effort to develop  additional drill targets within the project boundaries.
      
  
      Figure 1: Overview of Mustang Energy's Roughrider South and Cigar Lake East Project.2
      References
      -  https://www.cameco.com/businesses/uranium-operations/canada/cigar-lake#:~:text=Total%20packaged%20production%20from%20Cigar,pounds%20our%20share)%20in%202024.
 - Saskatchewan GeoAtlas,  https://gisappl.saskatchewan.ca/Html5Ext/index.html?viewer=GeoAtlas
      Qualifying Statement
      The  scientific and technical information in this release has been reviewed  and approved by Lynde Guillaume, P.Geo., Technical Advisor for Mustang, a  registered member of the Professional Engineers and Geoscientists of  Saskatchewan. Ms. Guillaume is a Qualified Person as defined by National  Instrument 43-101.
      Adjacent Property Disclaimer:
      This  news release includes references with respect to uranium deposits which  are located near the Projects. The Company advises that,  notwithstanding their proximity of location, discoveries of minerals on  nearby properties and any promising results thereof are not necessarily  indicative of the mineralization of, or located on the Projects, or the  Company’s ability to commercially exploit the Projects, or to locate any  commercially exploitable deposits therefrom. The Company cautions  investors on relying on this information as the Company has not  confirmed the accuracy or reliability of the information.
      About Mustang Energy Corp.:
      Mustang  is a resource exploration company focused on acquiring and developing  high-potential uranium and critical mineral assets. The Company is  actively exploring its properties in Northern Saskatchewan, Canada and  holds 77,318 hectares in around the Athabasca Basin. Mustang's flagship  property, Ford Lake, covers 7,743 hectares in the prolific eastern  Athabasca Basin, while its Cigar Lake East and Roughrider South projects  span 3,442 hectares to the north and the Spur Project to the south  covering 17,929 hectares. Mustang has also established its footprint in  the Cluff Lake region of the Athabasca Basin with the Yellowstone  Project (21,820 hectares) and further expanded its presence in the south  central region of the Athabasca Basin with the Dutton Project (7,633  hectares).
      For further information, please contact:
      Mustang Energy Corp.
      Attention: Nicholas Luksha, CEO and Director Phone: (604) 838-0184
      
  
      Neither  the CSE nor the Market Regulator (as that term is defined in the  policies of the CSE) accepts responsibility for the adequacy or accuracy  of this release.
      This news  release includes certain statements and information that may constitute  forward-looking information within the meaning of applicable Canadian  securities laws. Forward-looking statements relate to future events or  future performance and reflect the expectations or beliefs of management  of the Company regarding future events. Generally, forward-looking  statements and information can be identified by the use of  forward-looking terminology such as “intends”, “believes” or  “anticipates”, or variations of such words and phrases or statements  that certain actions, events or results “may”, “could”, “should”,  “would” or “occur”. This information and these statements, referred to  herein as “forward-looking statements”, are not historical facts, are  made as of the date of this news release and include without limitation,  statements regarding discussions of future plans, estimates and  forecasts and statements as to management's expectations and intentions  with respect to, among other things, the future potential of the  minerals claims held by the Company, including the Projects; the  completion of future work on the Projects, including trail  construction, line-cutting, ground geophysical surveys, and diamond  drilling; and that the Company is strategically positioned for  substantial growth. In making the forward-looking statements in this  news release, the Company has applied several material assumptions,  including without limitation the assumption that the Company will be  able to continue exploring its properties given various environmental  and economic factors outside of its control. Although management of the  Company has attempted to identify important factors that could cause  actual results to differ materially from those contained in  forward-looking statements or forward-looking information, there may be  other factors that cause results not to be as anticipated, estimated or  intended. There can be no assurance that such statements will prove to  be accurate, as actual results and future events could differ materially  from those anticipated in such statements. Accordingly, readers should  not place undue reliance on forward-looking statements and  forward-looking information. Readers are cautioned that reliance on such  information may not be appropriate for other purposes. The Company does  not undertake to update any forward-looking statement, forward-looking  information or financial out-look that are incorporated by reference  herein, except in accordance with applicable securities laws.
      Photos accompanying this announcement are available at 
      globenewswire.com
      globenewswire.com |