| Impact Silver Intersects 534.8 g/t Silver over 8.50m  Including  2,320 g/t Silver over 1.07m on New Kena Vein South at  Guadalupe Mine 
 newsfilecorp.com
 
 June 09, 2025 1:13 PM EDT | Source:  IMPACT Silver Corp.
 
 Vancouver,  British Columbia--(Newsfile Corp. - June 9, 2025) - IMPACT  Silver  Corp. (TSXV: IPT) (OTCQB: ISVLF) (FSE: IKL) ("IMPACT" or the  "Company")  is pleased to announce further drill results from the Kena  Vein South  zone in its producing Guadalupe silver mine in the Royal  Mines of  Zacualpan Silver District, Mexico.
 
 NEW KENA VEIN SOUTH UNDERGROUND DRILL RESULTS
 
 Underground   drilling from Level 140 of the Guadalupe Mine intersected further   significant mineralization on the recently discovered Kena Vein South   extending the zone to the north and discovered other nearby parallel and   splay high-grade veins. New assays received include the following:
 
 
  
 To view an enhanced version of this graphic, please visit:
 images.newsfilecorp.com
 
 True   widths are estimated to be 85-100% of drill intervals. Drill results   reported in this news release tested the north extension of the Kena   Vein zone. These results include newly discovered nearby parallel and   splay high-grade veins (see Figure 1). Kena Vein South mineralization   has now been traced over 300m strike length and remains open in all   directions. Additional drilling is planned. New underground access to   the Kena Vein South has been completed on Level 140 with first mining   tonnes recently extracted.
 
 CEO STATEMENT
 
 President   and CEO Fred Davidson commented, "Drilling on the recently discovered   Kena Vein continues to return exceptional high-grade results extending   the zone to the north. These drill holes have also made new discoveries   of nearby high-grade parallel and splay veins. The zone has been  drilled  over 300m length now and remains open for exploration in all   directions. Drilling will continue when a new underground drill station   is completed to next test the southern extension of the vein. The close   proximity of the new vein to current active mine workings has allowed   for rapid and low-cost access and mine development. Our mining team   recently extracted the first tonnes of mineral from Kena Vein South and   are now developing north and south on the vein to start full commercial   mining."
 
 ABOUT IMPACT SILVER
 
 IMPACT Silver Corp. (TSXV: IPT) is a successful producer-explorer with two mining projects in Mexico.
 
 
 Royal Mines of Zacualpan Silver-Gold District:  IMPACT owns 100% of the 211 km2   Zacualpan project in central Mexico  where four underground silver  mines and one open pit mine feed the  central 500 tpd Guadalupe  processing plant. To the south, the Capire  Project includes a 200 tpd  processing pilot plant adjacent to an open  pit silver mine with an NI  43-101 inferred mineral resource of over 4.5  million oz silver, 48  million lbs zinc and 21 million lbs lead (see  IMPACT news release dated  January 18, 2016 for details and QP  statement). Company personnel are  reviewing Capire for a potential  restart of operations. Over the past 18  years, IMPACT has placed  multiple zones into commercial production and  produced over 13 million  ounces of silver generating revenues over $284  million, with no  long-term debt. 
 Quality Control/Quality AssurancePlomosas Zinc-Lead-Silver District:   Plomosas is a high-grade zinc producer in northern Mexico with   exceptional exploration upside potential. The Company recently restarted   mining operations and is ramping up production toward design capacity   levels. Exploration potential at Plomosas is exceptional along a 6   km-long structure. This is in addition to other exploration targets on   the 3,019-hectare property including untested copper-gold targets with   indications of high-grade material from surface. Regionally, Plomosas   lies in the same mineral belt as some of the largest carbonate   replacement deposits in the world.
 
 Samples   reported in this news release were analyzed by ALS Group, an   internationally recognized analytical services provider, using a   multielement ICP package for silver and base metals. Assays for base   metals >1% resorted to an overlimit method.  Certified Reference   Materials and internal control samples were added to the sample stream   at regular intervals to monitor assay quality control.
 
 Qualified Person and NI 43-101 Disclosure
 
 Silvia   Kohler, P.Geo. is a "Qualified Person" within the meaning of NI 43-101   and has approved the technical information contained in this news   release.
 
 Additional information about IMPACT and its operations can be found on the Company website at  www.IMPACTSilver.com. Follow us on X (formerly Twitter) @IMPACT_Silver and LinkedIn at https://api.newsfilecorp.com/redirect/pEJ0yHXv8vr
 
 On behalf of IMPACT Silver Corp.
 "Frederick W. Davidson"
 President & CEO
 
 For more information, please contact:
 Jerry Huang
 CFO | Investor Relations
 O: (604) 681 0172 or  inquiries@impactsilver.com
 C: (778) 867 7909 Direct
 
 Neither   TSX Venture Exchange nor its Regulation Services Provider (as that  term  is defined in the policies of the TSX Venture Exchange) accepts   responsibility for the adequacy or accuracy of this release.
 
 Forward-Looking and Cautionary Statements
 
 This   IMPACT News Release may contain certain "forward-looking" statements   and information relating to IMPACT that is based on the beliefs of   IMPACT management, as well as assumptions made by and information   currently available to IMPACT management. Forward-looking information is   often, but not always, identified by the use of words such as "seek",   "anticipate", "plan", "continue", "planned", "expect", "project",   "predict", "potential", "targeting", "intends", "believe", "potential",   and similar expressions, or describes a "goal", or variation of such   words and phrases or state that certain actions, events or results   "may", "should", "could", "would", "might" or "will" be taken, occur or   be achieved. Such statements include, but are not limited to,  statements  regarding interpretation of drill results, activity at the  projects and  estimated timing thereof, the potential for defining and  extending  known mineralization, exploration potential on the  properties, and plans  for drilling and future operations at the  Company's projects or plans  for financing.
 
 Such forward-looking  information involves known and  unknown risks and assumptions, including  with respect to, without  limitation, exploration and development  risks, expenditure and financing  requirements, title matters, operating  hazards, criminal activity,  metal prices, political and economic  factors, competitive factors,  general economic conditions,  relationships with vendors, strategic  partners and local communities,  governmental regulation and supervision,  seasonality, technological  change, industry practices, pandemics and  one-time events. Should any  one or more risks or uncertainties  materialize or change, or should any  underlying assumptions prove  incorrect, actual results and  forward-looking statements may vary  materially from those described  herein. IMPACT does not assume the  obligation to update any  forward-looking statement or beliefs, opinions,  projections or other  factors, except as required by law.
 
 The  Company's decision to  place a mine into production, expand a mine, make  other production  related decisions or otherwise carry out mining and  processing  operations, is largely based on internal non-public Company  data and  reports based on exploration, development and mining work by  the  Company's technical personnel. The results of this work are evident  in  the discovery and building of multiple mines for the Company at   Zacualpan and in the track record of mineral production and financial   returns of the Company since 2006. Under NI 43-101, the Company is   required to disclose that it has not based its production decisions on   NI 43-101 mineral resources or reserve estimates, preliminary economic   assessments or feasibility studies, and historically such projects have   increased uncertainty and risk of failure.
 
 303-543 Granville Street
 Vancouver, BC, Canada V6C 1X8
 Telephone (604) 664-7707
 www.impactsilver.com
 X (Twitter)
 LinkedIn
 
 
  
 Figure 1: Kena South Vein area drill holes plan
 
 To view an enhanced version of this graphic, please visit:
 images.newsfilecorp.com
 
 
  SOURCE:  IMPACT Silver Corp. |