| Boeing’s fifth 777-9, part of delayed 777X family, takes first flight 
 Aug. 5, 2025 at 1:02 pm  Updated Aug. 5, 2025 at 4:21 pm
 
 
  
 Boeing’s  fifth 777-9 climbs out of Paine Field as it takes flight for the first  time Tuesday in Everett. (Nick Wagner / The Seattle Times)
 
 By
 Lauren Rosenblatt
 Seattle Times business reporter
 
 
 EVERETT — Boeing’s fifth 777-9 took its first flight from Paine  Field on Tuesday, marking another step in the jet manufacturer’s journey  to get its latest plane model out of the factory.
 
 The 777-9, part of Boeing’s 777X family, has been  delayed for years  as the company worked to fix defects and faced heightened regulatory  scrutiny after fatal 737 MAX crashes in 2018 and 2019. But Boeing  executives now are optimistic that the plane will receive certification  from the Federal Aviation Administration, with first delivery expected  in 2026.
 
 Once in the air, the 777X family will be more  fuel-efficient than other widebody planes on the market, Boeing says,  featuring the largest jet engines ever built and wings so long that the  plane has foldable wingtips so it can fit into airports.
 
 Boeing’s four 777-9 test planes have collectively flown 1,400 flights and more than 4,000 hours.
 
 On  Tuesday, a fifth plane entered the mix when it took off for its first  ever flight around 11 a.m. from Paine Field, near Boeing’s Everett  plant. It is the first time Boeing has launched a 777-9 first flight in  five years.
 
 Boeing employees and spectators gathered to watch the  takeoff from the balcony of the Future of Flight museum or the grassy   areas outside the airport. The crowd cheered and snapped pictures as the  all-white plane taxied toward the runway, unfolded its wing tips and  prepared for takeoff.
 
 The plane made a deliberate stop at the end of the runway during its  first go-round, to test that the brakes worked as expected. Then, it  repeated the process and took off into the sky.
 
 The plane, WH286,  is a production plane, meaning it won’t be used for the same tests that  the other four planes in the 777-9 fleet have been performing.
 
 Unlike  flight test planes, production planes are not equipped with unique  wiring, sensors and other systems to collect data during flight for the  certification process. The production plane also doesn’t yet have  interior features like seats and side walls. Those pieces will come  later.
 
 Its primary function is to test that the plane can withstand a lightning strike without any damage to its critical systems.
 
 But,  before it can head off in search of a lightning storm, Boeing sent the  production plane on a first flight to check that all the systems are  working as expected. First flights typically check movable systems, like  that the landing gear raises and lowers properly, and that the plane  can move through different turns and bank angles.
 
 Boeing has already performed those tests on the ground and recreated them in the air Tuesday.
 
 “The whole point of a first flight is to not be surprised,” said  Boeing spokesperson Lori Gunter. “It’s really just exercising the  airplane.”
 
 
  People  watch as Boeing’s fifth 777-9 taxis Tuesday morning before taking off  on its first flight. Others observed from the balcony of the Future of  Flight museum. (Nick Wagner / The Seattle Times)
 
 
  
 Boeing’s  fifth 777-9 taxis at Paine Field as it prepares for its first flight on  Tuesday. Boeing is optimistic that the plane will get full FAA  certification and that first delivery can be made in 2026. (Nick Wagner /  The Seattle Times)
 
 The  plane flew from Paine Field to Moses Lake, Grant County, before  returning to Everett around 1:30 p.m. Tuesday. The 2 hour and 27-minute  flight reached an altitude of 39,000 feet and an airspeed of Mach .84,  or the equivalent of ground speed of 511 knots.
 
 Ted Grady, chief pilot for the 777-9 who was flying the plane Tuesday, said the first flight went “seamlessly.”
 
 “It really was a pretty smooth flight. You could tell that the team had the airplane in excellent condition,” he said.
 
 Grady  has been involved with the 777X program since its very first flight,  and piloted the first flight for the second 777-9. Now, the launch of  the fifth plane “feels like progress,” he said. “We’re expanding and  growing and making progress.”
 
 The plane will perform one more  local test before heading to Arizona to begin testing its resilience  against electromagnetic interference and lightning strikes.
 
 The 777X family, which Boeing introduced more than a decade ago,  includes two passenger planes, the 777-8 and 777-9, as well as a  freighter,  the 777-8F.
 
 The first member of the family set to be delivered to customers, the 777-9, was stuck in unofficial test flights for four years.
 
 Boeing started officially  testing the 777-9 in July 2024 but faced another setback just one month later when  inspectors found a crack in a structural component that connects the plane’s engine to the airframe.
 
 Now,  working a solution to the cracked thrust link, Boeing’s test fleet is  running through a series of activities to achieve the FAA certification  to deliver the new planes to customers and fly passengers.
 
 CEO  Kelly Ortberg told investors last month during Boeing’s quarterly  earnings call that there are “no new technical issues” with the 777-9  test fleet. He’s optimistic about the plane, saying there has been “good  progress so far, but we still have a lot of work to do.”
 
 Lauren Rosenblatt:       206-464-2927 or  lrosenblatt@seattletimes.com. Lauren Rosenblatt is a Seattle Times business reporter covering Boeing and the aerospace industry.
 
 seattletimes.com
 |