SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Ride the Tiger with CD

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: ogi9/18/2025 9:20:12 AM
1 Recommendation

Recommended By
onepath

  Read Replies (1) of 312516
 
Sitka Drills 235.9 Metres of 1.11 g/t Gold from Surface, Including 40.0 Metres of 2.01 g/t Gold and 10.0 Metres of 5.29 g/t Gold, Further Confirming a Near-Surface Higher-Grade Gold Zone at Its Rhosgobel Discovery, RC Gold Project, Yukon
  • DDRCRG-25-010 returned 235.9 m of 1.11 g/t gold, including 40.0 m of 2.01 g/t gold and 10.0 m of 5.29 g/t gold, from surface; the best intercept to date from Rhosgobel

  • DDRCRG-25-009 returned 118.0 m of 1.09 g/t gold, including 14.0 m of 3.34 g/t gold, from surface

  • Drill results to date confirm continuity of near-surface, higher-grade gold mineralization which remains open in all directions laterally and at depth

  • First 10 diamond drill holes completed to date at Rhosgobel have all returned intercepts of > 100 g*m of gold

  • Assays pending for an additional 32 diamond drill holes completed at Rhosgobel across a strike length of approximately 1.2 km

  • Numerous instances of visible gold identified in 26 of the remaining 32 drill holes at Rhosgobel

  • Significant intercepts of tungsten associated with gold mineralization discovered at Rhosgoebel, including 75.50 m of 0.132% WO3, 6.98 m of 0.388% WO3and 0.61 m of 4.739% WO3

  • A total of 91 diamond drill holes have now been completed at RC Gold this year targeting the Blackjack, Saddle, Eiger, Pukelman, Contact, Rhosgobel, Bear Paw and May-Q targets

  • Approximately 32,000 metres completed of a planned 30,000 metre drill program with results still pending for 62 drill holes


newsfilecorp.com
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext