SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Cadre Resources (CSL.V) Awaiting production #'s and Financ
CSL 318.44+0.1%Dec 1 4:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: joseph schevenels who wrote (477)3/22/1998 5:51:00 PM
From: Francis R. Biscan Jr.  Read Replies (1) of 1285
 
>>That would be a really HUGE operation ,and would require an enormous amount of set up capital,let us be a bit less optimistic...<<

Well, that depends what you call enormous. Actually it will require a relatively small amount of capital, for the amount of potential revenue. The full production tonnage they are using would only require 6 production dredges and 3 multi staged processing plants. The estimated cost of the above should be no more then 20 million U.S. Of course there is some other costs, for storage facilities, vehicals, etc. I think 30 million would be more then enough.

>>and take 1 million ton a year,at a net cash flow of $10 per ton,and let's suppose that a major would own 50% of the operation,this would give the co a net cash flow of 5 million, not bad for a junior with less than 10 million shares outstanding...<<

First, with large production dredges, there is no reason to doubt 8 million tons could be moved in one year. Dredging is a vary low cost method of moving ore, especially with cheap hydro-electric power running the banks of the river, so that combined with the recovery plant that is being considered, makes your cost bases way to high. Production costs are estimated to be somewhere between $4.00 & $5.00 a ton. A full Batemen study, will more closely define all of the above.

The gross values, from various products, are estimated at:

Diamonds - $10.00 to $15.00 ton
Gravels - $15.00 to $17.50 ton
Gold - $ 8.00 to $12.00 ton
Titanium - $ 3.00 ton (This could be much higher depending on the level of refinement.)

On the low side, we have $36.00 U.S. per ton of gross value.

>>One does not see often a junior exploration co move on to the production stage,it really is the exception to the rule,i remain sceptical.<<

You should be skeptical and do your own due diligence, but this is the potential, none the less.

Rich
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext