SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Steppe Gold (SPE:V)
SPE 15.24+0.3%Nov 7 4:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: brian krause who wrote (830)3/30/1998 8:36:00 PM
From: S. E. Baker  Read Replies (3) of 1248
 
Hi, Brian. SPE downsized the Mizek project about a year ago, if I remember correctly. It was originally a much larger project with two to three times as much production, most of which was to come from the underlying sulphide portion of the deposit. Last year(?) they cut it to the oxide-only heap leach operation, which cut their needed investment way down to the current $20-25M. I'm sorry I can't be more specific about the date this redesign actually happened. Perhaps someone else on the thread could say when it happened.

Steve
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext