We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Thermo Tech Technologies (TTRIF)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: David Pickering who wrote (3845)4/3/1998 8:33:00 AM
From: Sheldon Fast  Read Replies (1) of 6467
 
David:

Angie is the one who first gave us the SEDAR site. I just happened to look there first as I had been expecting report.

re the following; I would like to expand a bit if I may:

" 6. City of Toronto's sludge incineration problems lead to having
TWO plants operating soon at Hamilton, the existing TMP
upgraded to 300 TPD capacity and a new 400 TPD TMP located
"immediately adjacent" to the original. The new 400 TPD TMP,
which will be permitted for sludge, is already under construction
and BOTH should be operational by August 1st! (1998):-)"

Both plants are under one roof but 2 separate processes (unloading area, input hydropulper(s), storage tanks, fermentation tanks) but they share the one drying and pelletizing system which is large enough to handle both, serially of course. The air incinerator/odor combuster will handle both processes. The original system
is able to handle 300T/day right now and the other will be finished in June. This second system will be able to handle 400T/day of food wastes or even more if sludge.

Thank you again, David.

Cheers to all,

Sheldon